Locally Preferred Alternative PRESENTATI O N Study Overview Existing Conditions A proposed Locally Preferred Alternative (The details) 2 slide PURPOSE STAT EMENT The purpose of the project is to implement multi-modal transportation


slide-1
SLIDE 1

Locally Preferred Alternative

slide-2
SLIDE 2

2

slide

PRESENTATI O N

Study Overview Existing Conditions A proposed Locally Preferred Alternative (The details)

slide-3
SLIDE 3

3

slide

PURPOSE STAT EMENT

The purpose of the project is to implement multi-modal transportation improvements that enhance mobility and

safety along the Harmony Road Corridor.

Improvements will support local and

regional travel needs, land uses,

economic health and environmental

stewardship goals.

slide-4
SLIDE 4

4

slide

Tier 1 Alternatives Tier 1 Screening Tier 2 Alternatives Broad Range of Ideas Fatal Flaw Analysis Most Promising

Vision Phasing Cost Triple Bottom Line

Tier 2 Screening Refinement Locally Preferred Alternative

Public Boards / Commissions City Council

slide-5
SLIDE 5

5

slide

1950 1960 1970 1980 1990 2000 2010

Farm Road I-25 Built Becomes State Hwy Harmony Road transferred to City HP Builds Facility Harmony Corridor Plan Harmony Bicycle Plan 6-lanes to Boardwalk

Harmony Road History

H I S TO RY

slide-6
SLIDE 6

Taft Hill Rd Shields St College Ave Lemay Ave Timberline Rd Ziegler Rd

Harmony Rd

$3,100,000 2012 $8,000,000 2009 $2,200,000 2010 $5,500,000 2011 $6,000,000 2008 $60,000 2010

slide-7
SLIDE 7

7

slide Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan

slide-8
SLIDE 8

8

slide Source: NFRMPO Travel Demand Model, as modified for Fort Collins Transportation Master Plan

slide-9
SLIDE 9

9

slide

slide-10
SLIDE 10

10

slide

slide-11
SLIDE 11

11

slide

Rout ute e 1 about bout 300 0 on and offs fs Rout ute e 16 & 17 over 300 0 on and offs fs combine mbined

slide-12
SLIDE 12

12

slide

Existing ting Bus St Stop

slide-13
SLIDE 13

13

slide

Existing ting Bus St Stop

slide-14
SLIDE 14

14

slide

Wa Walking king Co Cond nditio itions ns

slide-15
SLIDE 15

15

slide

Walking Conditions on Harmony Road

slide-16
SLIDE 16

16

slide

slide-17
SLIDE 17

17

slide

slide-18
SLIDE 18

18

slide

slide-19
SLIDE 19

19

slide

slide-20
SLIDE 20

20

slide

Proposed Locally Preferred Alternative Roadway & Intersection Improvements Transit Service Bicycle Facilities Pedestrian Facilities

slide-21
SLIDE 21

21

slide

Alternative Roadway Infrastructure Transit Infrastructure

  • n Harmony

Transit Service

  • n Harmony

Bicycle and Pedestrian Accommodation

No Action Existing Existing

  • Committed FY14 Transfort

service modifications Existing Transportation System Management (TSM)

  • Widen Harmony

(Boardwalk to College) to 6 Lanes

  • Intersection

improvements Existing

  • Expanded Local Bus service

(Phase 1 of TSOP) FRCC to HTC Options:

  • Bike lanes +

detached sidewalks

  • Buffered bike lanes +

detached sidewalks

  • Cycle tracks + detached

sidewalks

  • Shared use paths

Enhanced Bus Same as TSM

  • Queue jumps

at major intersections

  • Enhanced bus service

(FRCC to HTC)

  • Increased frequency

End to End BRT/HOV Same as TSM

  • Outside lanes for

bus/HOV (one in each direction)

  • BRT service (FRCC to HTC)
  • Increased frequency

Interlined BRT/HOV Same as TSM

  • Outside lanes for

bus/HOV (one in each direction)

  • BRT service interlined with

Mason corridor

  • Increased frequency
slide-22
SLIDE 22

22

slide

Widen en Colle llege ge to 6 lanes es Widen en Timb mberline rline to 6 lanes es Impr prove

  • ve interse

rsections ctions with h turn lane nes Widen en Harmony mony to 6 lanes es

slide-23
SLIDE 23

23

slide

Harmony Rd. Timberline Lemay College Shields Ziegler Horsetooth Boardwalk Lady Moon

South uth Tran ansit sit Cent nter er Harmony rmony Transfe nsfer r Center ter

Harmony

  • ny Rout

ute Runs every ry 20 minutes tes

slide-24
SLIDE 24

24

slide

slide-25
SLIDE 25

25

slide

slide-26
SLIDE 26

26

slide

slide-27
SLIDE 27

27

slide

Seatt attle le San Franci ncisco sco

slide-28
SLIDE 28

28

slide

Harmony Rd. Timberline Lemay College Shields Ziegler Horsetooth Boardwalk Lady Moon

Pedestr strian ian and bicycle cycle Under or overpa pass sses es

Mason Trail Power Trail

slide-29
SLIDE 29

29

slide

slide-30
SLIDE 30

30

slide

Proposed Locally Preferred Alternative

Widen Harmony (Boardwalk to College) to 6 Lanes & Intersection improvements Enhanced bus service with queue jumps at major intersections, increased frequency with improved bus plazas Fill in missing sidewalks, pursue over or

underpasses and improve crossings at signalized

intersections

Buffered bike lanes with green marking, along with

detached multi-use paths

Bus Bike Walk Road

slide-31
SLIDE 31

31

slide

Next Steps

Conduct final public outreach Develop conceptual cost estimates Develop implementation plan (phasing and funding) Complete ETC Master Plan report City Council this Summer for Adoption

slide-32
SLIDE 32

32

slide

For More Information

Project Website: fcgov.com/harmony

Contact: Aaron Iverson aiverson@fcgov.com

  • r

970-416-2643