RECONSTRUCTION OF KENNEDY STREET, N.W. ROADWAY IMPROVEMENT PROJECT Public Meeting January 21, 2020 Kennedy St, N.W. - From 16th St, N.W. To Georgia Ave, N.W. Georgia Ave, N.W . - From Kennedy St, NW to Longfellow St, N.W. Ward 4 1 Agenda


  1. RECONSTRUCTION OF KENNEDY STREET, N.W. ROADWAY IMPROVEMENT PROJECT Public Meeting January 21, 2020 Kennedy St, N.W. - From 16th St, N.W. To Georgia Ave, N.W. Georgia Ave, N.W . - From Kennedy St, NW to Longfellow St, N.W. Ward 4 1

  2. Agenda • Team Introductions • Project Location • Project Background & Purpose • Design Illustrations • Project Summary • Questions & Answers 2

  3. Project Location END BEGIN PROJECT PROJECT 3

  4. Background Project Need, Purpose and Goals • Upgrade Roadways - Pavement reconstruction, Curbing, Sidewalk, and ADA facilities; Relocate Illinois Ave at Georgia; Drainage inlets and pipes, low impact development (LID)/Stormwater Management facilities • Improve multi-modal connectivity - Upgrade bus transit stops & shelters, bicycles and pedestrian movements • Incorporate Vision Zero initiative - Improve driver and pedestrian safety along the corridor • Incorporate Livability Study Recommendations – Upgrade existing and create new landscaped community spaces Upgrade Traffic Signal Control - Reconfigure 14 th St at Kennedy St/Colorado St, Georgia Ave at Kennedy Intersections • • Install New Traffic Signal Control - Georgia Ave at Longfellow St intersection 4

  5. Roadway Illustrations - After 5

  6. Proposed Roadway Cross Sections Kennedy Street/14 th Street/Colorado Avenue Longfellow ST. N.W. 14 th ST. N.W. 14 th Street Section A-A A A C Kennedy ST N.W. C 16 th ST. N.W. Colorado Avenue Section B-B Kennedy Street Section C-C 6

  7. Multimodal Intersection Improvements Focus Intersections 7

  8. Intersection Illustration – Before & After Kennedy Street/14 th Street/Colorado Avenue BEFORE AFTER 14 th ST. N.W. Kennedy ST. N.W. Kennedy ST. N.W. 14 th ST. N.W. 8

  9. Intersection Illustration – Before & After Kennedy Street/14 th Street/Colorado Avenue • New inter-connected traffic signals will be installed • Pedestrian countdown signals will be upgraded Kennedy ST. N.W. • Bus depot approach will be signal controlled • Bicycle lanes on 14th Street are continued through the area 14 th ST. N.W. 9

  10. Vehicular Safety, Operation and Circulation Changes Kennedy Street/14 th Street/Colorado Avenue • Colorado Avenue intersects with 14 th Street, south of Kennedy Street at a new traffic signal • Elimination of existing five-legged intersection improves safety and Kennedy ST. N.W. operation • Right-angle intersections reduce vehicular turning speed & improve pedestrian safety 14 th ST. N.W. 10

  11. Public Space – Kennedy St & Colorado Ave 11

  12. Public Space – Kennedy St & Colorado Ave – Community Space 12

  13. Intersection Illustration – Before & After Georgia Avenue/Longfellow Street/Illinois Avenue Longfellow ST. N.W. 13

  14. Traffic Signal Improvements Georgia Avenue/Longfellow Street/Illinois Avenue • New traffic signal will be installed at Georgia Avenue & Longfellow Street • New countdown pedestrian signals will be installed 14

  15. Traffic Signal Improvements Georgia Avenue/Longfellow Street/Illinois Avenue • Relocation of Illinois Avenue – Reduce speed of vehicles turning left from Georgia Ave onto Illinois Ave – Create more storage space for vehicles turning left onto Illinois Ave • Left-turn restriction from Illinois Ave onto Georgia Ave • Left-turn restriction for northbound vehicles on Georgia during peak periods 15

  16. Public Space – Longfellow St & Illinois Ave 16

  17. Intersection Illustration – Before & After Georgia & Kennedy Street KENNEDY ST. N.W. 17

  18. Transit Stop Relocation and Enhancement • Relocate bus stops on Georgia Avenue to the far side of Kennedy Street to improve pedestrian safety. • Extend curbs at the Georgia Avenue / Kennedy Street intersection • Provide more space for transit users and improved amenities 18

  19. Vehicular Safety, Operation and Circulation Changes Georgia Avenue & Kennedy Street C A. Hardened centerline B B. No Turn on Red signs C. Leading pedestrian intervals D. Left-turn restriction from Georgia Ave on to Kennedy Street during peak periods A D 19

  20. Lighting Improvements 2: Lighting Between 1: Lighting at Intersections 1. New LED street lighting Intersections and at Bus Stops 2. Pedestrian scale lighting 3. Enhanced lighting at pedestrian crossings and bus stop 20

  21. Streetscape Design Commitment to Green Infrastructure Green Infrastructure Features • Utilize DDOT Standard Green Infrastructure to ensure a uniform appearance • Maximize the amount of vegetation and native species • Proposed Low Impact Development (Rain Gardens) • Permeable Pavers 21

  22. Streetscape Furnishings • Bus Shelters • Trash Receptacles • Benches • Bicycle Racks • Street Lights 22

  23. Project Schedule • 90% Design Completed • 100% Design plan complete by Spring 2020 • DDOT to coordinate with key stakeholders throughout design and construction phases • DDOT will phase construction work not to impact the Farmers Market • Construction to begin Winter 2020 23

  24. Contact Us For more information please contact: Ghirmay Tesfamichael DDOT Project Manager • ghirmay.tesfamichael@dc.gov Sean Moore Public Outreach Project Manager • Sean@thecsmi.com 24

  25. Questions? 25

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.