Public Meeting Agenda
3
me & & Introdu ductions
Octavio Saenz – TxDOT Public Information Officer
ical al P Prese sentat atio ion
Paul Voiles, PE, PTP – Consultant Project Manager (Binkley & Barfield, Inc.)
ject S Schedu dule
ic C Comme mment
djournment
Public Meeting Purpose
4
TxDOT P Phar harr D Dist istrict Attn: R Robi bin G n Gel elston 600 W 600 W. I Int nter erstate 2 Ph Pharr, T TX 785 78577
presentation and provide comments online
website
Provide Your Comments
5
To view project information, schedule an appointment with: Eduardo Saenz, PE TxDOT Pharr District Office 600 W. Interstate 2 Pharr, TX 78577 (956) 702-6170 Eduardo.Saenz@txdot.gov Provide Your Comments
6
Project Information
Pr Project Lim imits Interstate 2 2 (I (I-2)
McAllen to FM 2557 (Stewart Rd) in San Juan Interstate 69C (I (I-69C)
to I-2 in Pharr Cost E Estimat ate
– $320 Million
7
Project Purpose and Need
8
What problems are we trying to address?
What are we trying to do?
Existing Facility
9
Four separ arat ate 1-lan ane di direct connector bridges dges
– Each bridge is 32’ wide:
direct ct connect ctor
exper erien ence e sever ere e conge gestion du during p pea eak commuting g per eriods
On and d off ramp mp spacing g does es not meet current standar ards cau ausin ing ad additional al congestion
Proposed Facility
10
Four separ arat ate 2-Lan ane di direct connector bridges dges
– Each bridge is 40’ wide:
econfigu gure on and d off ramps s to optimize mobil ility
ge Road i d imp mproveme ments an and turnaroun unds s to further er increas ase mobility
Sugar Road Overpass
11
ar R Road ad Ov Overpass Removal al
– Overpass is too close to the new direct connectors on the west side – Improved main lane operations – Frontage Road operational improvements will increase mobility – Improve Safety
Braided Ramps
Brai aided ram amps al allow spac acing b between ram amps to meet current s stan andar ards
12
Braided Ramps
13
Propose sed Locati tions: ns:
Jackson Road and Jackson Avenue
Veterans/I Road and Raul Longoria/FM 1426
Veterans/I Road and Raul Longoria/FM 1426
Proposed Braided Ramp Location
Conceptual Construction Phasing
time to minimize disruptions to existing traffic patterns, in this
– Southbound I-69C to Westbound I-2 – Southbound I-69C to Eastbound I-2 – Eastbound I-2 to Northbound I-69C – Westbound I-2 to Northbound I-69C
in its current location
construction.
work will be interwoven into the direct connector replacement phases to provide least possible impact to traveling public
14
Environmental Considerations
ximat mately 7 7.4 acre res of
will ll b be re required
No Licenses, , or Perm rmits w will b ll be require red
The f follo
reports a are re b being condu ducted: d: – Cult ltura ral R l Resou
Study, – Commu mmunit ity Impac act A Analysis, sis, – Hazar ardous M s Material als I s Initial ial S Sit ite A Assessm ssment, – Traf affic ic N Noise se A Analysis sis, – Bio Biological E Eval aluation, – Air ir Q Qual ality A Anal alysis, an and d – Indir irect A Analysis, sis,
15
Right-of-Way (ROW) Acquisition
16
APPROXIMATELY 7.4 ACRES
SH 495 / Ferguson Ave Cage Blvd Polk Ave
TxDOT
Right-of-Way (ROW) Acquisition/Relocation Assistance
TxDOT WEBSITE
http://w ://www ww.t .txd xdot.gov/g /government/p /proce
edures es/row.html
17
Project Schedule
18
ROW Acquisition Spring 2019 Design-Build Contract Execution Summer 2019 Construction 2020 - 2023 Preliminary Design Complete & Environmental Clearance Fall 2018
*This p project schedule a and nd dates a are prelimina nary a y and nd sub ubject t to change.
The environmental review, consultation, and other actions required by Federal environmental laws for this project are being,
2014, and executed by FHWA and TxDOT.
19
minutes. Public Comment Period
TxDOT P Phar harr D Dist istrict Attn: R Robi bin G n Gel elston 600 W 600 W. I Int nter erstate 2 Ph Pharr, T TX 785 78577
presentation and provide comments online
website
Provide Your Comments
20
Closing Remarks