Boundary Channel Drive Interchange Boundary Channel Drive/I-395 Interchange Improvements Existing Conditions Existing Conditions Existing Conditions Existing Conditions 14 th Street Bridge Corridor EIS 14 th Street Bridge Corridor EIS Concept


slide-1
SLIDE 1

Boundary Channel Drive/I-395 Interchange Improvements

Boundary Channel Drive Interchange

slide-2
SLIDE 2

Existing Conditions

slide-3
SLIDE 3

Existing Conditions

slide-4
SLIDE 4

Existing Conditions

slide-5
SLIDE 5

Existing Conditions

slide-6
SLIDE 6

14th Street Bridge Corridor EIS

slide-7
SLIDE 7

14th Street Bridge Corridor EIS

slide-8
SLIDE 8

Concept 1

slide-9
SLIDE 9

Concept 2

slide-10
SLIDE 10

Concept 3

slide-11
SLIDE 11

Concept Evaluation

  • Pentagon Access Road

– Option 1 (unsignalized)

  • West Roundabout

– Option 2

  • East Roundabout

– Option 2

slide-12
SLIDE 12

Preferred (now Accepted) Concept

slide-13
SLIDE 13

Accepted Concept

slide-14
SLIDE 14

Accepted Concept

slide-15
SLIDE 15

Weaving Analysis

3 weaving segments reduced to 1 weaving segment

slide-16
SLIDE 16

Traffic Impact Analysis

Interchange Modification Report IMR

  • FHWA technical

analysis

  • Part of NEPA
  • Evaluate series of

concept designs

  • Analyze 2026 and

2040 Build traffic volumes

slide-17
SLIDE 17

Project Timeline

  • Draft 14th Street Bridge EIS – January 2012
  • Initial Meeting w/ DOD, NPS, & FHWA – April 26, 2012
  • Public Information Meeting – June 23, 2015
  • DOD Letter of Recommendation – January 21, 2016
  • 1st IMR Submission – April 25, 2016
  • CE issued on January 17, 2018
  • 6th IMR Submission – August 16, 2019
  • County Board Approves Transfer to VDOT – Sept 21, 2019
  • IMR Approval – October 8, 2019
slide-18
SLIDE 18

Anticipated Schedule

  • Transfer Project to VDOT – Ongoing
  • Preliminary Design – Early to Mid 2020
  • Public Hearing – Mid to Late 2020
  • Advertise Contract – Late 2020
  • Aquatic Center Opening – Early 2021
  • Award Contract – Mid 2021
  • Construction – 2022-2023

We ar We are here here