I-39/90/94 Wisconsin River Bridge Project Public Involvement Meeting September 12 th , 2019 Project Location Project Termini: Black Road to south of I-39/94 & I-39/WIS 78 County: Columbia Towns: Dekorra and Caledonia Wisconsin Department


  1. I-39/90/94 Wisconsin River Bridge Project Public Involvement Meeting September 12 th , 2019

  2. Project Location Project Termini: Black Road to south of I-39/94 & I-39/WIS 78 County: Columbia Towns: Dekorra and Caledonia Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 2

  3. Route Importance Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 3

  4. Route Importance Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 4

  5. Purpose and Need of the Project Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 5

  6. Primary Need of the Project Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 6

  7. Secondary Needs of the Project vpd = vehicles per day Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 7

  8. Secondary Needs of the Project Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 8

  9. Preliminary Alternatives No Build Alternative • Will be used as baseline comparison Rehab Alternative • Repair the bridge in its current location • Replace the concrete deck and repair steel supports East Alternative • Construct a new bridge just east of the existing bridge • Shift I-39/90/94 to east to match the new bridge • Evaluate County U and V bridges for possible replacement West Alternative • Construct a new bridge just west of the existing bridge • Shift I-39/90/94 to west to match the new bridge • Evaluate County U and V bridges for possible replacement Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 9

  10. Preliminary Alternatives No Build Alternative • Will be used as baseline comparison Rehab Alternative • Traffic reduced to two lanes during construction Construction would occur 4 times in o 10 years • Requires full replacement in 2045 East Alternative • Addresses bridge deficiencies • Accommodates traffic demands • Improves roadway geometrics West Alternative • Addresses bridge deficiencies • Accommodates traffic demands • Improves roadway geometrics Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 10

  11. Range of Alternatives (North of the Wisconsin River) Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 11

  12. Range of Alternatives (South of the Wisconsin River) Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 12

  13. Range of Alternatives Impacts - Part 1 Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 13

  14. Range of Alternatives Impacts - Part 2 Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 14

  15. WisDOT Recommended Alternative East Alternative No relocations Avoids ATC pole impacts Allows for future fourth lane of traffic Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 15

  16. Project Schedule Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 16

  17. Contact Information Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.