Public Involvement Meeting September 12th, 2019

I-39/90/94 Wisconsin River Bridge Project

slide-2
SLIDE 2

Project Location

Project Termini: Black Road to south of I-39/94 & I-39/WIS 78 County: Columbia Towns: Dekorra and Caledonia

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 2

slide-3
SLIDE 3

Route Importance

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 3

slide-4
SLIDE 4

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

Route Importance

4

slide-5
SLIDE 5

Purpose and Need of the Project

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 5

slide-6
SLIDE 6

Primary Need of the Project

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 6

slide-7
SLIDE 7

Secondary Needs of the Project

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

vpd = vehicles per day

7

slide-8
SLIDE 8

Secondary Needs of the Project

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 8

slide-9
SLIDE 9

No Build Alternative

  • Will be used as baseline comparison

Rehab Alternative

  • Repair the bridge in its current location
  • Replace the concrete deck and repair steel

supports

East Alternative

  • Construct a new bridge just east of the existing

bridge

  • Shift I-39/90/94 to east to match the new bridge
  • Evaluate County U and V bridges for possible

replacement

West Alternative

  • Construct a new bridge just west of the existing

bridge

  • Shift I-39/90/94 to west to match the new bridge
  • Evaluate County U and V bridges for possible

replacement

Preliminary Alternatives

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 9

slide-10
SLIDE 10

No Build Alternative

  • Will be used as baseline comparison

Rehab Alternative

  • Traffic reduced to two lanes during

construction

  • Construction would occur 4 times in

10 years

  • Requires full replacement in 2045

East Alternative

  • Addresses bridge deficiencies
  • Accommodates traffic demands
  • Improves roadway geometrics

West Alternative

  • Addresses bridge deficiencies
  • Accommodates traffic demands
  • Improves roadway geometrics

Preliminary Alternatives

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 10

slide-11
SLIDE 11

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

Range of Alternatives (North of the Wisconsin River)

11

slide-12
SLIDE 12

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

Range of Alternatives (South of the Wisconsin River)

12

slide-13
SLIDE 13

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

Range of Alternatives Impacts - Part 1

13

slide-14
SLIDE 14

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project

Range of Alternatives Impacts - Part 2

14

slide-15
SLIDE 15

East Alternative

No relocations Avoids ATC pole impacts Allows for future fourth lane of traffic

WisDOT Recommended Alternative

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 15

slide-16
SLIDE 16

Project Schedule

Wisconsin Department of Transportation I-39/90/94 Wisconsin River Bridge Project 16

slide-17
SLIDE 17

Contact Information