Woodrow Wilson Bridge Project Woodrow Wilson Bridge Project REVIEW - - PowerPoint PPT Presentation

woodrow wilson bridge project woodrow wilson bridge
SMART_READER_LITE
LIVE PREVIEW

Woodrow Wilson Bridge Project Woodrow Wilson Bridge Project REVIEW - - PowerPoint PPT Presentation

Woodrow Woodrow Wilson Wilson Bridge Bridge Project Project Woodrow Wilson Bridge Project Woodrow Wilson Bridge Project REVIEW OF NOISE ABATEMENT PLAN REVIEW OF NOISE ABATEMENT PLAN June 25, 2007 June 25, 2007 1 1 Partnership


slide-1
SLIDE 1

Woodrow Wilson Bridge Project

1

Woodrow Wilson Bridge Project

1

Woodrow Wilson Bridge Project Woodrow Wilson Bridge Project

REVIEW OF NOISE ABATEMENT PLAN REVIEW OF NOISE ABATEMENT PLAN June 25, 2007 June 25, 2007

slide-2
SLIDE 2

Woodrow Wilson Bridge Project

2

Partnership Partnership

slide-3
SLIDE 3

Woodrow Wilson Bridge Project

3

General Engineering Consultant General Engineering Consultant

Potomac Crossing Consultants Potomac Crossing Consultants General Engineering Consultant (GEC) Joint Venture

  • Parsons Brinckerhoff
  • URS Corporation
  • Rummel Klepper & Kahl
  • 13 Active Subconsultants (8 DBE’s)
slide-4
SLIDE 4

Woodrow Wilson Bridge Project

4

Overall Project Limits Overall Project Limits

Telegraph Road US Route 1 River Crossing I-295 MD-210 Study Area for this Meeting

slide-5
SLIDE 5

Woodrow Wilson Bridge Project

5

View of the Virginia Approach Spans, looking east from Washington Street Deck, July 17, 2006

slide-6
SLIDE 6

Woodrow Wilson Bridge Project

6

View looking south at the U.S. Route 1 Interchange

slide-7
SLIDE 7

Woodrow Wilson Bridge Project

7

Noise Barriers from Route 1 to the River Noise Barriers from Route 1 to the River

Route 1 Interchange

slide-8
SLIDE 8

Woodrow Wilson Bridge Project

8

Noise Analysis Process Noise Analysis Process

Verify land use and potential noise sensitive areas Establish noise measurement locations Complete ambient noise measurements Use FHWA Traffic Noise Model (TNM) computer

modeling to establish the Existing, No-build and Build conditions

Determine traffic noise impacts – 66 dBA or 10 dBA

increase over existing

If impacts exist, determine if there are feasible and

reasonable measures that will abate the impacts

Present results to VDOT Noise Abatement Committee Incorporate recommended abatement into

construction documents

slide-9
SLIDE 9

Woodrow Wilson Bridge Project

9

Noise Barriers: Noise Barriers: Route 1 (West Route 1 (West Side and Patrick Side and Patrick Street), Street), Church Street, Church Street, and Northwest and Northwest Trail Trail (Freedmen’s (Freedmen’s Cemetery Park) Cemetery Park)

Route 1 (West Side) Route 1 (Patrick St.) Church St. Northwest Trail

slide-10
SLIDE 10

Woodrow Wilson Bridge Project

10

View looking northwest across Route 1 toward Lee Center

slide-11
SLIDE 11

Woodrow Wilson Bridge Project

11

View looking south down Patrick Street

slide-12
SLIDE 12

Woodrow Wilson Bridge Project

12

Close-up of Patrick Street wall showing brick coloring process

slide-13
SLIDE 13

Woodrow Wilson Bridge Project

13

View looking west along Church Street

slide-14
SLIDE 14

Woodrow Wilson Bridge Project

14

View looking northwest across deck toward Freedmen’s Cemetery Park noise barrier

slide-15
SLIDE 15

Woodrow Wilson Bridge Project

15

Southeast Trail, Southwest Trail, Southeast Trail, Southwest Trail, and Hunting Terrace Barriers and Hunting Terrace Barriers

Southwest Trail Southeast Trail Hunting Terrace

slide-16
SLIDE 16

Woodrow Wilson Bridge Project

16

View looking northwest at barrier along Hunting Terrace parking lot

slide-17
SLIDE 17

Woodrow Wilson Bridge Project

17

View looking west along Southwest Trail barrier for Hunting Terrace

slide-18
SLIDE 18

Woodrow Wilson Bridge Project

18

View looking east at Southeast Trail barrier for Hunting Towers

slide-19
SLIDE 19

Woodrow Wilson Bridge Project

19

Northeast Trail Barrier Northeast Trail Barrier

Northeast Trail

Transparent Section on Bridge

slide-20
SLIDE 20

Woodrow Wilson Bridge Project

20

View looking southeast at Northeast Trail barrier by St. Mary’s

slide-21
SLIDE 21

Woodrow Wilson Bridge Project

21

Artist’s rendering looking west along transparent barrier on bridge