MORRISVILLE SCHOOL DISTRICT MORRISVILLE SCHOOL DISTRICT FACILITY ASSESSMENT PRESENT FACILITY ASSESSMENT PRESENT CILITY ASSESSMENT PRESENTATION CILITY ASSESSMENT PRESENTATION TION TION 11 October 2017 11 October 2017 11 October 2017 11


slide-1
SLIDE 1

MORRISVILLE SCHOOL DISTRICT MORRISVILLE SCHOOL DISTRICT

FACILITY ASSESSMENT PRESENT CILITY ASSESSMENT PRESENTATION TION

11 October 2017 11 October 2017

FACILITY ASSESSMENT PRESENT CILITY ASSESSMENT PRESENTATION TION

11 October 2017 11 October 2017

SCHRADERGROUP architecture

slide-2
SLIDE 2

1. Facility Assessment Review 2. Prioritizing the Scope of Work with Associated Costs Timeline of Work 3. Procurement 4. Questions and Comments

1

AGENDA

AGENDA

MORRISVILLE SCHOOL DISTRICT

2 3 4 5

slide-3
SLIDE 3

DISTRICT FACILIITES

MORRISVILLE SCHOOL DISTRICT

slide-4
SLIDE 4

4

MORRISVILLE SCHOOL DISTRICT

slide-5
SLIDE 5

MORRISVILLE SCHOOL DISTRICT

slide-6
SLIDE 6

1. Code – Miscellaneous ADA and some Building Code upgrades required 2. Site – Some site related storm drainage repairs and improvements 3. Roofing – Variety roof types requiring removal and replace to existing roof deck 4. Windows – Good condition and recently replaced. (sealant deteriorating) 5. Envelope – Miscellaneous locations require repointing of brick 6. Finishes – Fair condition. Some floors, ceilings, casework replacement, repaint 7. Electrical – upgrade obsolete branch panels and service. 8. Technology – Being upgraded by District currently 9. HVAC – No central building automation system is in place. Upgrade in entirety

  • 10. Plumbing – Piping infrastructure and fixtures nearing end of useful life. (Fixtures are

aged and Non-ADA)

  • 11. Environmental – Abate in entirety, VAT, Pipe insulation & fittings

6

HIGHLIGHTS

MORRISVILLE SCHOOL DISTRICT

slide-7
SLIDE 7

HAYCOCK ELEMENTARY SCHOOL

GRANDVIEW ELEMENTARY SCHOOL

Construction Cost $ 2,390,796 Soft Costs $ 717,238 TOTAL CONCEPTUAL COSTS $ 3,108,033

7

CONCEPTUAL RENOVATION COSTS

MORRISVILLE SCHOOL DISTRICT

slide-8
SLIDE 8

HAYCOCK ELEMENTARY SCHOOL

MAIN SCHOOL/DISTRICT ADMIN BUILDING

Construction Cost $ 13,817,489 Soft Costs $ 4,145,247 TOTAL CONCEPTUAL COSTS $ 17,962,736

8

CONCEPTUAL RENOVATION COSTS

MORRISVILLE SCHOOL DISTRICT

slide-9
SLIDE 9

DISTRICT CONCEPTUAL RENOVATION COSTS

MORRISVILLE SCHOOL DISTRICT BUILDING Est. Soft Costs TOTAL COSTS

  • Const. Costs

Grandview Elementary $ 2,390,796 $ 717,238 $ 3,108,033 Main School and District Admin $ 13,817,489 $ 4,145,247 $ 17,962,736 TOTAL $ 16,208,285 $ 4,862,485 $ 21,070,769

slide-10
SLIDE 10

RECOMMENDED SCOPE FOR EACH SCHOOL

MORRISVILLE SCHOOL DISTRICT

slide-11
SLIDE 11

MORRISVILLE SCHOOL DISTRICT

Exterior Sidewalks and paving $87,000 $26,100 $113,100 Bid or ezIQC 1 $113,100 Summer 2018 Whole Building Branch panelboards, HVAC, Exhaust, Building Controls $2,443,396 $733,019 $3,176,415 ESCo $3,176,415 Fall 2018 through Summer 2019 Front Office Secure entry vestibule $50,000 $15,000 $65,000 ESCo* $65,000 Fall 2018 through Summer 2019 Corridors Provide ADA water coolers $25,000 $7,500 $32,500 ESCo $32,500 Fall 2018 through Summer 2019 Auditorium Replace cork, curtains, provide ADA access via a lift $122,900 $36,870 $159,770 Bid/ezIQC/SC 2 $159,770 Summer 2018 into Fall 2018 if Needed Restrooms C+D Renovate $550,000 $165,000 $715,000 ESCo $715,000 Fall 2018 through Summer 2019 District Office Secure entry vestibule $25,000 $7,500 $32,500 ESCo* $32,500 Fall 2018 through Summer 2019 Locker Rooms Update for ADA ‐ girls and boys $60,000 $18,000 $78,000 ESCo $78,000 Fall 2018 through Summer 2019 $3,363,296 $1,008,989 $4,372,285 Roof #2 Remove existing roof down to the deck. Install new insulation and multi‐ply roof with 30‐year warranty $274,000 $82,320 $356,320 ESCo $356,320 Fall 2018 through Summer 2019 Front Office Secure entry vestibule $50,000 $15,000 $65,000 ESCo* $65,000 Fall 2018 through Summer 2019 Corridors Provide ADA water coolers $9,000 $3,000 $12,000 ESCo $12,000 Fall 2018 through Summer 2019 Multi‐purpose Room Abate and replace floor tile $6,000 $2,000 $8,000 Bid Abate/Floor $8,000 Summer 2018 Restrooms 134‐136 Complete rebuild; update for ADA $36,000 $10,800 $46,800 ESCo $46,800 Fall 2018 through Summer 2019 Restrooms 137‐138 Complete rebuild; update for ADA $15,000 $4,500 $19,500 ESCo $19,500 Fall 2018 through Summer 2019 $390,000 $117,620 $507,620 $4,879,905 MORRISVILLE HIGH SCHOOL, MIDDLE AND INTERMEDIATE SCHOOL AND DISTRICT ADMINISTRATION HEALTH, LIFE SAFETY, ADA AND CODE ITEMS (Recommended projects identified in June 2017 report) GRANDVIEW ELEMENTARY SCHOOL HEALTH, LIFE SAFETY, ADA AND CODE ITEMS (Recommended projects identified in June 2017 report) Health, Life Safety, ADA and Code Sub‐total Health, Life Safety, ADA and Code Sub‐total HS, MS, IS AND DAO + GRANDVIEW ES SUB‐TOTAL RECOMMENDED HEALTH, LIFE SAETY, ADA AND CODE ITEMS

slide-12
SLIDE 12

MORRISVILLE SCHOOL DISTRICT

ALTERNATIVE SCOPE ITEMS FOR CONSIDERATION

Project Description Estimated Construction Costs Soft Costs @ 30% Total Project Costs GYMNASIUM RENOVATIONS GYMNASIUM RENOVATIONS Auditorium Paint CMU walls $9,900 $2,970 $ 12,870 ESCo* 12,870 $ Fall 2018 Prep and paint hard ceiling; install new ceiling/acoustical clouds $139,000 $41,700 $ 180,700 ESCo* 180,700 $ Fall 2018 Replace carpet in aisles $27,900 $8,370 $ 36,270 ESCo* 36,270 $ Fall 2018 Stage Provide stage theater lighting system and new house lighting $200,000 $60,000 $ 260,000 Bid/ezIQC/SC 2 260,000 $ Summer 2018 into Fall 2018 Stage rigging,scaffolding, and miscellaneous (programming/testing) $200,000 $60,000 $ 260,000 Bid/ezIQC/SC 2 260,000 $ Summer 2018 into Fall 2018 Replace the stage floor with T&G painted black $14,250 $4,275 $ 18,525 ESCo* 18,525 $ Fall 2018 Support Convert School Store to Dressing Rooms $26,250 $7,875 $34,125 ESCo* 34,125 $ Fall 2018 $617,300 $185,190 $802,490 GYMNASIUM RENOVATIONS GYMNASIUM RENOVATIONS Gymnasium Prep and paint ceiling $54,045 $16,214 $ 70,259 ESCo* 70,259 $ Fall 2018 through Summer 2019 Paint CMU walls $29,425 $8,828 $ 38,253 ESCo* 38,253 $ Fall 2018 through Summer 2019 Remove (4) existing basketball

  • standards. Convert (8) manual

$75,000 $22,500 $ 97,500 ESCo* 97,500 $ Fall 2018 through Summer 2019 Replace HVAC System $135,713 $40,714 $ 176,427 ESCo 176,427 $ Fall 2018 through Summer 2019 $294,183 $88,255 $382,438 BUILDING UPGRADES BUILDING UPGRADES Asbestos Abatement Building‐wide $375,000 $112,500 $ 487,500 Bid Abate/Floor 487,500 $ Summer 2018 New Finishes Replace asbestos floor tile with new VCT $119,544 $35,863 $ 155,407 Bid Abate/Floor 155,407 $ Summer 2018 $494,544 $148,363 $642,907 $1,827,835 Auditorium and Stage Renovations Gymnasium Renovations Building Upgrades SUB‐TOTAL AUDITORIUM, STAGE, GYMNASIUM AND BUILDING UPGRADES WITH SOFT COSTS

slide-13
SLIDE 13

MORRISVILLE SCHOOL DISTRICT

Scope of Work Project Delivery Method Construction Timeframe High Priority IS/MS/HS – Sidewalks and Paving Public Bid or Other Summer 2018 IS/MS/HS – HVAC, Electrical, Controls ESCo Energy Scopes Fall 2018 through Summer 2019 IS/MS/HS – ADA Water Coolers/Locker Rooms ESCo Energy Scopes Fall 2018 through Summer 2019 IS/MS/HS – Toilet Room Upgrades ESCo Energy Scopes Fall 2018 through Summer 2019 IS/MS/HS – Security Vestibules ESCo Non‐Energy Scopes Fall 2018 through Summer 2019 GES – Roof ESCo Energy Scopes Fall 2018 through Summer 2019 GES – ADA Water Coolers, Toilet Room Upgrades ESCo Energy Scopes Fall 2018 through Summer 2019 GES – Security Vestibule ESCo Non‐Energy Scopes Fall 2018 through Summer 2019 GES – Cafeteria Floor Abatement & Replacement Public Bid or Other Summer 2018 Alternative Scopes Auditorium – Painting Walls & Ceilings and Carpet ESCo Non‐Energy Scopes Fall 2018 through Summer 2019 Auditorium – Stage Rigging, Lighting, and Floors Public Bic or Other Summer 2018 Auditorium – Cork, Curtains and Lift Public Bic or Other Summer 2018 Gymnasium – Painting and Equipment ESCo Non‐Energy Scopes Fall 2018 through Summer 2019 Gymnasium – HVAC, Controls ESCo Energy Scopes Fall 2018 through Summer 2019 IS/MS/HS – Floor Abatement & Replacement Public Bid or Other Summers of 2018 and 2019

slide-14
SLIDE 14

OPTIONAL PROCUREMENT PROCESS

MORRISVILLE SCHOOL DISTRICT

slide-15
SLIDE 15

1. GESA (Guaranteed Energy Saving Project) or ESCo (Energy Services Company) is a design/build project that provies for a guaranteed performance related to energy use

  • a. HVAC, plumbing electrical roofing, windows and code related work
  • b. Plus 15% of non-energy using scopes (like finishes and security vestibules)
  • c. Qualifications/pre-approved subcontractors and vendors – target local firms

2. Scopes that are publically bid

  • a. State contract or exIQC with multiple vendors competing
  • b. Work to include siteworkm work at stage, abatement/re-flooring
  • 3. Schedule
  • a. Begin GESA/ESCo scopes in the fall of 2018 to get best pricing when contractors

are less constrained.

  • b. Goal – provide a method to get the most scope for least money

15

PROCUREMENT

MORRISVILLE SCHOOL DISTRICT

slide-16
SLIDE 16

MORRISVILLE SCHOOL DISTRICT

Partnering to enhance the student experience! THANK YOU!