BR B RI ID DG GE E B Ba ac ck kg gr ro ou un nd d c - - PDF document

br b ri id dg ge e
SMART_READER_LITE
LIVE PREVIEW

BR B RI ID DG GE E B Ba ac ck kg gr ro ou un nd d c - - PDF document

Contract n 006538 (SSPI) BR B RI ID DG GE E B Ba ac ck kg gr ro ou un nd d c cR Ri it te er ri ia a f fo or r t th he e I ID De en nt ti if fi ic ca at ti io on n o of f G Gr ro ou un nd


slide-1
SLIDE 1

Contract n° 006538 (SSPI)

B BR RI ID DG GE E

B Ba ac ck kg gr ro

  • u

un nd d c cR Ri it te er ri ia a f fo

  • r

r t th he e I ID De en nt ti if fi ic ca at ti io

  • n

n

  • f

f G Gr ro

  • u

un nd dw wa at te er r t th hr rE Es sh ho

  • l

ld ds s

Specific targeted Research Project Scientific Support to Policies (SSP)

Deliverable D 33: Project presentation

Due date of deliverable: 30 April 2005 Actual submission date: 27 April 2005

The deliverable authors are responsible for the content

Start date of the project : 1 January 2005 Duration : 24 months

AUTHOR: AM Fouillac AFFILIATION: BRGM ADDRESS: 3, avenue C. Guillemin - BP 6009 – 45060 Orléans Cedex 2, France. TEL.: +33-2.38.64.35.85 EMAIL: Am.fouillac@brgm.fr FURTHER AUTHORS: WP Chairs

Revision [draft 2]

Project co-funded by the European Commission within the Sixth Framework Programme (2002-2006) Dissemination Level PU Public x PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

slide-2
SLIDE 2

Deliverable D33 : Project presentation

Deliverable D33

1 / 11

Summary

The object of the deliverable D33 is to deliver documents for presentation of the Bridge

  • project. These documents are shown in the two appendices:
  • Appendix 1 – BRIDGE brief project presentation
  • Appendix 2 – BRIDGE project presentation - slides

Appendix 1understands a fast presentation of the project BRIDGE of 3 pages showing the elements of the project. Appendix 2 includes the slides of 14 pages for presentation at the time of the conferences. These documents are provided in powerpoint version available on CIRCA website http://nfp-at.eionet.eu.int:8980/Members/irc/eionet-circle/bridge/library

slide-3
SLIDE 3

Deliverable D33 : Project presentation

Deliverable D33

2 / 11 Appendix 1 – BRIDGE brief project presentation

  • !

! " #!!$ %& '$ " # ( #!! & #)*+,,-.//, % ! '& *!0 !1$!& #!! 2 +$ . 2! *! 0 + ! 2 . 3$ ! ( & ! !,,/ 4,,5 ( 671&" !! ! *! 0 !0$ " $ 3 38!3!! (4,,/ 9! 1$671&": ;(! + 3 8 !. !! ; ( ! ;(3 !" ;(!!!3 !!

  • ! 3

!!

  • 1

!"#

$%&<$00 '(,,5/-<+001. :9! ):4,,/ *& (===>5-*? "#=<*?

/#! 93 &#

(#!!671&" & 3 & # +&#. 3 (&# #!! 1!! 0 1 ! ! ! &

'&':8*+7. !@! ':!*A+(. !!@! !

+, , '

67&B2*C 67&* 7 D! !&! D68 ( #$*0D ) D)E# DF D& G&H8 D&"I( 6" 6D("! 6*" HD DBGC$2J DG& 6" !1(7 K1() 6" "! " F !3&L&3DL &"D0 F #(

  • 7

"!8&! D68 " HG!D! & HGD& " 1&*" 1&*" "0 "! " DF 0!!MN33+"! 1. 0OF" 1I I7 I&7" &7 P6!( 6("K"7" 1( Q!4&!H Q8 " I)( I 3)Q3(I) (I) IG D DI1 K"17) ( &0G G&( G( KD!! 1K* IG ""! "" 6G D( D( "" "B(0 "(08 7 3!&Q8HQ HR&H G )1P" )1"D 7

  • ! 3

!!

slide-4
SLIDE 4

Deliverable D33 : Project presentation

Deliverable D33

3 / 11

53

;-*.&)#*# * (! 383 +$ +.8 $ !. ! $3 ( !!1 ! ! 1 ! - ! !

;-*&)

( 3 3 ! 1 ! ! ! 1 !!( 3 ! - !!7 8!! +/.

  • */&'#,

, ( ! !

  • $

!( 3 !!S!T8 383+ U . ! S !T8 383 +9.$ 8!! +/. ! !33+5. ;-*0&*#1" ,* ( 33 ! !!

  • " 7

/ 5 ! ! !! ;-* & , " , # ! / !8 8 ! ! ! 1 ! $ - 9 + . "! ! ! ! ! +-. !! +5. ;-*$&,, ( 5 ! $ #!!$ 3 & # " #!!13!! 6 ( !! T !33 !

  • ! 3

!!

slide-5
SLIDE 5

Deliverable D33 : Project presentation

Deliverable D33

4 / 11 Appendix 2 – BRIDGE project presentation – slides

Project Presentation, January 2005

1 ! 3 !!

Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation

Contract N° 006538 (SSPI) Co-ordinator: BRGM (Fr) Anne-Marie Fouillac

Project Presentation, January 2005

2 ! 3 !!

Bridge Specific Targeted Research Project (STREP)

> FP6 Programme « Integrating and strengthening

the European Research Area »

> Priority 8 Activity « Policy support and anticipating

scientific and technological needs »

; Deadline of submission …. 13 January 2004 ; Contract negotiations…….. July - December 2004 ; Contract signature………... 23th, 2004 ; Contract N°

006538 (SSPI)

; Co-ordinator : BRGM (FR)

slide-6
SLIDE 6

Deliverable D33 : Project presentation

Deliverable D33

5 / 11

Project Presentation, January 2005

3 ! 3 !!

Bridge project

> 27 partners

;

24 academic or public organisations, 2 SMEs, 1 non profit organisation

> 17 countries

;

17 European countries (FR, AT, UK, BE, DK, DE, ES, FIN, GR, IT, NL, PT) including 4 New Member States (LT, EE, PL, HU)

;

1 candidate country (BL)

> Budget of the project

;

Total budget…….. …. 2.963 M

;

EC contribution ..….... 1.877 M

> Duration

; 24 months: hence supporting the GWD negotiation process ; Start Date : 1st January 2005

Project Presentation, January 2005

4 ! 3 !!

BRIDGE Participants

Organisation name short name Country

Bureau de Recherche Géologiques et Minières BRGM FR Umweltbundesamt Gmbh UBA-A AT Chancellor, Masters and Scholars of the University of Oxford UOXF.AC UK Universiteit Gent LAGH-UGENT BE Budapest University of Technology and Economics BME HU Université de Liège, Aquapôle ULG BE Flemish Institute for Technological Research VITO BE Danish Environmental Protection Agency DEPA DK Danmarks og Grønlands Geologiske Undersøgelse GEUS DK ACTeon Acteon FR Federal Environmental Agency-Germany UBA-D DE Hessisches Landesamt fuer Umwelt und Geologie HLUG DE Instituto Geologico y Minero de Espana IGME ES Environment Agency EA UK Suomen ympäristökeskus (Finnish Environment Institute) SYKE FIN National Agricultural Research Foundation NAGREF GR Autorita' di Bacino del Fiume Tevere ABTEVERE IT Forschungszentrum Juelich GmbH fz-juelich DE Nederlandse Organisatie voor Toegepast Natuurwetenschappelijk Onderzoek TNO TNO NL Universidade de Aveiro UNI AVEIRO PT Geological Survey of Lithuania LGT LT Vrije Universiteit Amsterdam IVM NL Executive Environment Agency EEA BL University of Tartu UT EE Application Européenne de Technologies et de Services AETS-Apave FR Akademia Gorniczo-Hutnicza DHWP/AGH PL Office International de l'Eau OIEAU FR

slide-7
SLIDE 7

Deliverable D33 : Project presentation

Deliverable D33

6 / 11

Project Presentation, January 2005

5 ! 3 !!

Bridge project

> Strategic Objective

; To define a common methodology for the establishment of threshold

values in Groundwater

> Main goals

; To study and gather scientific outputs to set out criteria for the

assessment of the chemical status of groundwater (data on pollutants and key hydro-geological parameters)

; To derive a common methodology based on scientific results and

defined at national river basin district or groundwater body level to set up groundwater threshold values

; To check the applicability and validity by means of case studies at the

European scale

; To identify and undertake additional research studies to complete

available data

; To carry out an environmental impact assessment taking into account

the economic and social impacts

Project Presentation, January 2005

6 ! 3 !!

Bridge project - Work Programme

> WP1: Survey of representative groundwater

pollutants

> WP2 : Study of groundwater characteristics > WP3: Criteria for environmental thresholds and

methodology to define a good status

> WP4: Representative sites / water body studies and

compliance testing

> WP5: Economic and social costs linked to the

establishment of groundwater threshold values

> WP6: Information and dissemination

slide-8
SLIDE 8

Deliverable D33 : Project presentation

Deliverable D33

7 / 11

Project Presentation, January 2005

7 ! 3 !!

Bridge project - Work Programme

WP1 Survey of representative groundwater Pollutants

> State of the art and relation with on-going national and EU-

funded RDT projects for natural and anthropogenic substances in groundwater :

; behaviour, eco-toxicological effects, interactions with surface waters and

ecosystems.

; metals, anions and organic compounds of the GWD, 33 priority substances

(2001), emerging pollutants

; All information assembled in a reference data base (Draft Report Month12)

> This data base will be the major input from WP1 to WP2. It

will permit better definition of the impacts of pollutants to groundwater bodies.

> It is also a major input to WP3 to build up the conceptual

model and the methodology.

Project Presentation, January 2005

8 ! 3 !!

Bridge project - Work Programme

WP2 Study of groundwater characteristics

  • Description of the specific criteria linked to the

groundwater bodies to be potentially taken into account to characterise their chemical status (Report Month15)

– Hydro-geological characteristics of groundwater – Soil/groundwater interactions and groundwater/surface waters

interactions

– Quantitative aspects and links with qualitative aspects

; It will benefit from WP1 database on chemical pollutants ; It will be the basis for the development of an approach for

establishment of environmental thresholds (WP3)

; Results of WP2 will be used for socio-economic

assessment of case studies testing (WP5).

slide-9
SLIDE 9

Deliverable D33 : Project presentation

Deliverable D33

8 / 11

Project Presentation, January 2005

9 ! 3 !!

Bridge project - Work Programme

WP3 Criteria for environmental thresholds and methodology to define a good status

> Propose a practical approach for a methodology to define

the good status for groundwater bodies and a general structure of criteria, giving guidance on the derivation process for environmental thresholds (Report Month 3)

– Review of national methodologies of groundwater protection – Take into account sampling, measuring and quality assurance – Monitoring networks and integrated data aggregation

> Data and information from WP1 and WP2 > Methodology definition will be transferred to :

– WP4 for on site validation

– WP5 for socio-economic assessment – WP6 for information to policy makers and stakeholders

  • --> Preliminary Methodology : Report Month 12

Project Presentation, January 2005

10 ! 3 !!

Bridge project - Work Programme

WP4 Representative sites / water body studies and compliance testing

> Evaluate the approach defined in WP3

– Selection of representative sites focusing on PRB as

sites with priority (Report Month 6)

– Evaluation of the developed approach – Linked with RTD projects (Swift, Aquaterra, Snowman,

….)

– Case studies and compliance testing (Report Month 18)

> Results will be transferred to :

; WP5 for socio-economic assessment ; WP6 for communication / dissemination

slide-10
SLIDE 10

Deliverable D33 : Project presentation

Deliverable D33

9 / 11

Project Presentation, January 2005

11 ! 3 !!

Bridge project - Work Programme

WP5 Economic and social costs linked to the application of threshold values

> Estimation of the socio-economic impact of these values

– Development of a methodological framework – Integrated socio-economic assessment of groundwater threshold

values (5 case studies) (Report Month18)

> The assessment of economic and social costs will be

linked to the definition of threshold values (WP3)

> Socio-economic results will be used for general

communication (WP6).

Project Presentation, January 2005

12 ! 3 !!

Bridge project - Work Programme

WP6 Information and dissemination

> to stimulate the co-operation and interaction between the

Governing Council, the Advisory Committee, the different partners, the Working Group 2C and the European Commission.

; Workshops (Month 1, 7, 13, 19, 24) ; Web-documents on CIRCA ; Link to the Common Implementation Strategy Process via WG2C

> This WP will benefit of inputs of each WP in order to

display efficient communication between partner’s and related bodies to obtain a real consensus about proposed methodology.

slide-11
SLIDE 11

Deliverable D33 : Project presentation

Deliverable D33

10 / 11

Project Presentation, January 2005

13 ! 3 !!

Bridge Project

slide-12
SLIDE 12

Deliverable D33 : Project presentation

Deliverable D33

11 / 11

STATUS, CONFIDENTIALITY AND ACCESSIBILITY Status Confidentiality Accessibility

S0 Approved/Released x PU public x Work-space x S1 Reviewed PP Restricted to other programme participants (including the Commission Services) Internet S2 Pending for review RE Restricted to a group specified by the consortium (including the Commission Services) Paper x S3 Draft for comments CO Confidential, only for members of the consortium (including the Commission Services) S4 Under preparation