I-25 Express Lanes September 30, 2016 Who we are: CDOT Region 1 - PowerPoint PPT Presentation

I-25 Express Lanes September 30, 2016 Who we are: CDOT Region 1 Region 1 North Program Primarily Adams County and Broomfield County Major corridors I-25 I-76 I-270 US 85 SH 7 Current I-25 Express Lane Projects I-25


  1. I-25 Express Lanes September 30, 2016

  2. Who we are: CDOT Region 1

  3. Region 1 North Program • Primarily Adams County and Broomfield County • Major corridors • I-25 • I-76 • I-270 • US 85 • SH 7

  4. Current I-25 Express Lane Projects I-25 Segment 2 • • US 36 to 120 th Avenue • Northglenn, Thornton, Adams County I-25 Segment 3 • • 120 th Avenue to Northwest Parkway/E470 • Northglenn, Broomfield, Thornton, Westminster, Adams County

  5. Segment 2 • Project Details: • US 36 to 120 th Ave • $66M Construction Budget • Converted inside shoulder to Toll Express Lane in each direction • Built new concrete soundwalls and replaced existing wooden fences • Lighting and ITS devices installed • Lowered I-25 grade at 88 th Ave

  6. Segment 2 • Key Dates: • Construction began October 2013 • Toll Express lane opened March 2016 • Toll Commencement in July 2016 • Soundwall Completion September 2016 • Active Traffic Management System Fall 2016

  7. Segment 3 • Project Details: • 120 th Avenue to Northwest Parkway/E470 • $78M Construction Budget • Widen I-25 to accommodate a Toll Express Lane in each direction • Install new concrete soundwalls and replace existing wooden sound fences • Install ITS devices • Replace I-25 bridge over Bull Canal with enclosed Concrete Box Culvert

  8. Segment 3 • Key Dates: • Construction Began July 2016 • Bull Canal Replacement Winter 2016 • Anticipated completion Fall 2018 • Toll Commencement Spring 2019

  9. I-25 Express Lanes • Purpose/Benefits: • Improves mobility for all travelers • Provides travel time savings • Give travelers viable transportation choices • Improve mobility for freight carriers, businesses, and emerging energy industries • Provides additional capacity while minimizing long- term operating and maintenance costs • Generates a new reliable revenue stream that offsets the cost of operations and maintenance • Provides reliable connection from Downtown to development growth around SH 7

  10. I-25 Express Lanes • Operational Innovations: • HOV Connection • Active Traffic Management (ATM) • Electronic Tolling Collection (ETC) • Intelligent Transportation System (ITS) • I-270 Ramp Revised Signing and Striping

  11. HOV Connection

  12. HOV Connection – AM SB Commute

  13. HOV Connection – AM SB Commute

  14. HOV Connection – PM SB Commute

  15. HOV Connection – PM SB Commute

  16. HOV Connection – PM SB Commute

  17. HOV Connection – PM SB Commute

  18. Active Traffic Management (ATM) • Benefits: • Improve Safety • Improve Trip Reliability • Reduce Congestion • Enhance Incident Management • Strategies: • Dynamic Lane Assignments • Queue Warning • Variable Speed Limits

  19. Dynamic Lane Assignments

  20. Queue Warning / Variable Speed Limits

  21. Electronic Toll Collection (ETC)

  22. Segmental Tolling

  23. Go Live Coordination

  24. Intelligent Transportation System (ITS) • Closed Circuit Television Cameras (CCTV) • Variable Message Signs (VMS) • Variable Toll Message Signs (VTMS) • Ramp Meter Stations (RMS) • Travel Time Indicators (TTI) • Microwave Vehicle Radar Detectors (MVRD) • Reversible HOV Signs and Gates

  25. Intelligent Transportation System (ITS)

  26. I-270 Ramp Revised Signing and Striping • Striping Condition on Opening Day

  27. I-270 Ramp Revised Signing and Striping • Striping Condition after changes

  28. I-270 Ramp Revised Signing and Striping

  29. I-270 Ramp Revised Signing and Striping

  30. I-270 Ramp Revised Signing and Striping

  31. I-270 Ramp Revised Signing and Striping

  32. I-270 Ramp Revised Signing and Striping

  33. I-270 Ramp Revised Signing and Striping

  34. How’s it working? • Reliable travel time in Express Lane at all times • Reduced travel time in General Purpose Lanes • Reduced duration of peak congestion

  35. Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.