I-25 Express Lanes

September 30, 2016

slide-2
SLIDE 2

Who we are: CDOT Region 1

slide-3
SLIDE 3

Region 1 North Program

  • Primarily Adams County and Broomfield County
  • Major corridors
  • I-25
  • I-76
  • I-270
  • US 85
  • SH 7
slide-4
SLIDE 4

Current I-25 Express Lane Projects

  • I-25 Segment 2
  • US 36 to 120th Avenue
  • Northglenn, Thornton, Adams County
  • I-25 Segment 3
  • 120th Avenue to Northwest Parkway/E470
  • Northglenn, Broomfield, Thornton, Westminster, Adams County
slide-5
SLIDE 5

Segment 2

  • Project Details:
  • US 36 to 120th Ave
  • $66M Construction Budget
  • Converted inside shoulder to Toll Express Lane in

each direction

  • Built new concrete soundwalls and replaced

existing wooden fences

  • Lighting and ITS devices installed
  • Lowered I-25 grade at 88th Ave
slide-6
SLIDE 6

Segment 2

  • Key Dates:
  • Construction began October 2013
  • Toll Express lane opened March 2016
  • Toll Commencement in July 2016
  • Soundwall Completion September 2016
  • Active Traffic Management System Fall 2016
slide-7
SLIDE 7

Segment 3

  • Project Details:
  • 120th Avenue to Northwest Parkway/E470
  • $78M Construction Budget
  • Widen I-25 to accommodate a Toll Express Lane in

each direction

  • Install new concrete soundwalls and replace

existing wooden sound fences

  • Install ITS devices
  • Replace I-25 bridge over Bull Canal with enclosed

Concrete Box Culvert

slide-8
SLIDE 8

Segment 3

  • Key Dates:
  • Construction Began July 2016
  • Bull Canal Replacement Winter 2016
  • Anticipated completion Fall 2018
  • Toll Commencement Spring 2019
slide-9
SLIDE 9

I-25 Express Lanes

  • Purpose/Benefits:
  • Improves mobility for all travelers
  • Provides travel time savings
  • Give travelers viable transportation choices
  • Improve mobility for freight carriers, businesses,

and emerging energy industries

  • Provides additional capacity while minimizing long-

term operating and maintenance costs

  • Generates a new reliable revenue stream that
  • ffsets the cost of operations and maintenance
  • Provides reliable connection from Downtown to

development growth around SH 7

slide-10
SLIDE 10

I-25 Express Lanes

  • Operational Innovations:
  • HOV Connection
  • Active Traffic Management (ATM)
  • Electronic Tolling Collection (ETC)
  • Intelligent Transportation System (ITS)
  • I-270 Ramp Revised Signing and Striping
slide-11
SLIDE 11

HOV Connection

slide-12
SLIDE 12

HOV Connection – AM SB Commute

slide-13
SLIDE 13

HOV Connection – AM SB Commute

slide-14
SLIDE 14

HOV Connection – PM SB Commute

slide-15
SLIDE 15

HOV Connection – PM SB Commute

slide-16
SLIDE 16

HOV Connection – PM SB Commute

slide-17
SLIDE 17

HOV Connection – PM SB Commute

slide-18
SLIDE 18

Active Traffic Management (ATM)

  • Benefits:
  • Improve Safety
  • Improve Trip Reliability
  • Reduce Congestion
  • Enhance Incident Management
  • Strategies:
  • Dynamic Lane Assignments
  • Queue Warning
  • Variable Speed Limits
slide-19
SLIDE 19

Dynamic Lane Assignments

slide-20
SLIDE 20

Queue Warning / Variable Speed Limits

slide-21
SLIDE 21

Electronic Toll Collection (ETC)

slide-22
SLIDE 22

Segmental Tolling

slide-23
SLIDE 23

Go Live Coordination

slide-24
SLIDE 24

Intelligent Transportation System (ITS)

  • Closed Circuit Television Cameras (CCTV)
  • Variable Message Signs (VMS)
  • Variable Toll Message Signs (VTMS)
  • Ramp Meter Stations (RMS)
  • Travel Time Indicators (TTI)
  • Microwave Vehicle Radar Detectors (MVRD)
  • Reversible HOV Signs and Gates
slide-25
SLIDE 25

Intelligent Transportation System (ITS)

slide-26
SLIDE 26

I-270 Ramp Revised Signing and Striping

  • Striping Condition on Opening Day
slide-27
SLIDE 27

I-270 Ramp Revised Signing and Striping

  • Striping Condition after changes
slide-28
SLIDE 28

I-270 Ramp Revised Signing and Striping

slide-29
SLIDE 29

I-270 Ramp Revised Signing and Striping

slide-30
SLIDE 30

I-270 Ramp Revised Signing and Striping

slide-31
SLIDE 31

I-270 Ramp Revised Signing and Striping

slide-32
SLIDE 32

I-270 Ramp Revised Signing and Striping

slide-33
SLIDE 33

I-270 Ramp Revised Signing and Striping

slide-34
SLIDE 34

How’s it working?

  • Reliable travel time in Express Lane at all times
  • Reduced travel time in General Purpose Lanes
  • Reduced duration of peak congestion
slide-35
SLIDE 35

Questions?