I-285 Top End Express Lanes I-285 Westside Express Lanes
I-285 Top End Express Lanes I-285 Westside Express Lanes 1 - - PowerPoint PPT Presentation
I-285 Top End Express Lanes I-285 Westside Express Lanes 1 - - PowerPoint PPT Presentation
I-285 Top End Express Lanes I-285 Westside Express Lanes 1 Unprecedented Growth in Metro Atlanta Metro Atlanta Major companies located in metro Atlanta by the numbers: 15.7% population increase since 2010 65.2% employment rate 2
Unprecedented Growth in Metro Atlanta
Metro Atlanta
by the numbers: 15.7% population increase since 2010 65.2% employment rate
Source: CensusMajor companies located in metro Atlanta
2012 - 2020
I-285 Corridor Operational Improvements (Revive285 Breakout Projects)History of I-285 Corridor
1969
I-285 is first built with 2 lanes in each direction1980’s
I-285 corridor experiences 200% increase in employment density1989
I-285 corridor is widened to 4 lanes in each direction1996
I-285 corridor is widened to 5 lanes in each directionPopulation Employment Legend 2009
Managed Lane System Plan (MLSP)2000
High Occupancy Vehicle (HOV) System Plan2028
I-285 Top End Express Lanes2006 - 2013
Revive285 NOI issued and proceed to planning Forecasted GrowthMajor Mobility Investment Program
Major Mobility Investment Program
11 projects open to traffic
- r under contract by 2026
$11 billion program Innovative Delivery and public-private partnerships to accelerate projects
MMIP Project Locations
MMIP Schedule
Georgia Express Lanes
2019
Express Lanes Vision
2000 HOV System Plan 2009 Managed Lane System Plan Update I-85 Express Lanes open 2015 Transportation Funding Act- f 2015
- ptions to
Stakeholder coordination continuously occurring
*Information and schedule are subject to change.Express Lane Benefits
More Reliable Travel Times More Consistent Travel Speeds Enhanced Transit Options and Opportunities
Georgia Express Lanes Network
Northwest Corridor Express Lanes Success
Travel speeds are 30% faster in the express lanes than in the general purpose lanes Rush hour has been reduced by over 1 hour Total trips: 5.1 million Weekday trip average: 25,500
25.5K
Average daily fare: $2.32
5.1M
GP lanes are up to 20 mph faster than they were before the express lanes opened
Mobility Partnerships
Description Here
Metro Atlanta transit operators are responsible for operations of various transit options available including heavy rail, light rail, and bus transit system and the advancement of transit in the metro area. Responsible for planning, constructing, maintaining, and improving the State’s roads, bridges, and interstates. Collects toll revenue and responsible for operations for express lane systems within Georgia.Integrated Mobility Solutions
I-285 Top End Express Lanes
I-285 Top End Express Lanes
- Two new barrier-separated express
lanes in both directions – at grade and elevated
- Part of the larger Georgia Express
Lanes network
- Pre-Concept/Early Environmental
phase
- Issuance of project NOI
- No detailed plans yet
- Local coordination regarding express
I-285 Top End Express Lanes Timeline
2018: Environmental process began One Federal Decision 2019: Rescission of existing Revive285 NOI Early-2020: Public Information Open Houses 2019-2021: Early right-- f-way
Next Major Milestone: Public Information Open Houses (PIOHs) Early 2020
Current concept layout Potential express lane access points Refined right-of-way (ROW) needs Environmental process Transit coordination
I-285 Top End Express Lanes Contact Information http://www.dot.ga.gov/DS/GEL/I285TopEnd TopEndExpressLanes@dot.ga.gov 404-978-7490 (project hotline) #285TopEnd
I-285 Westside Express Lanes
I-285 Westside Express Lanes
- One at-grade express lane proposed
in each direction inside the existing general purpose lanes
- Ties to the I-285 Top End Express Lanes
- Upcoming activities:
- Traffic modelling
- NEPA Strategy memo and
environmental special studies
- PIOHs: Q2 2020
I-285 Westside Express Lanes Public Involvement Timeline
2019: Environmental process begins 2020: Q2 PIOHs 2019-2021: Right-of-way (ROW) acquisition 2022: Q1/Q2 NEPA document approval 2023: Q1 Final design Q4 Construction startsContinuous Community Involvement
2021: Q1 Procurement starts Q2 PHOHsI-285 Westside Express Lanes Contact Information
http://www.dot.ga.gov/DS/GEL/i285Westside WestsideExpressLanes@dot.ga.gov 770-384-6738 (project hotline)