hs2 presentation
play

HS2 PRESENTATION WHERE WE ARE NOW PETITION Pe++on presented to - PowerPoint PPT Presentation

HS2 PRESENTATION WHERE WE ARE NOW PETITION Pe++on presented to Parliament o Incorpora+ng material from village Concerns: o Conges+on and rat runs o Safety o Noise and vibra+on o Pollu+on o Damage to A361 o Emergency services o Lack of


  1. HS2 PRESENTATION WHERE WE ARE NOW

  2. PETITION • Pe++on presented to Parliament o Incorpora+ng material from village • Concerns: o Conges+on and rat runs o Safety o Noise and vibra+on o Pollu+on o Damage to A361 o Emergency services o Lack of impact assessment

  3. MITIGATION • Bypass or haul road • Re-rou+ng of traffic • Speed limits o Traffic calming measures • Pedestrian crossings • Noise insula+on measures • Safeguards for access for emergency services • Limi+ng HS2 traffic to day+me during week

  4. HS2 RESPONSE • Response by HS2 to our pe++on o No challenge on standing • No need for bypass o Suitable mi+ga+on measures will have to be agreed o With Oxfordshire CC as planning/highway authority o Consulta+on with Parish Council o No significant safety concerns/accident clusters iden+fied • Impact on noise, vibra+on and air quality assessed o No significant effects as a result of APs o Just traffic related

  5. OTHER DEVELOPMENTS • Mee+ng with HS2 o Oxfordshire County Council o Cherwell District Council o Victoria Pren+s MP • Site visit to A361 • LeXers to HS2 and to Oxfordshire CC o Seeking informa+on • Responses from HS2 and OCC • Legal advice from Pinsent Masons

  6. HS2 traffic - 2021 • HS2 HGVs • 2,240 both ways per day • 1,477% increase from projected 2021 baseline of 152 HGVs • HS2 LGVs and cars • 204 both ways per day • 3% increase in LGVs and cars • To 6,605 per day from projected 2021 baseline of 6,401 • Total of 2,444 HS2 vehicles per day (1,222 in each direc+on) • 8 am to 6pm weekdays • 8 am to 1 pm Saturdays

  7. INCREASES • Increase of 942 HGVs per day o From original plan • Decrease of 124 cars/LGVs o Refinement in no of workforce trips o Net increase of 818 HS2 vehicles per day

  8. REASONS FOR INCREASE • Increase due to “accelera+on of earthworks programme” o Transport of soil from Lower Thorpe Mandeville and Turweston o To Lower Boddington o Where deficit of material o For noise bunds and landscape integra+on • From Turweston via A43, M40 (J10 to 11) and A361 • From Lower Thorpe via A422 and A361

  9. TIMELINES • Construc+on of Chipping Warden bypass o Will cause some increase in traffic o 12 month period o When construc+on traffic serving compound rela+vely low o Year 1 of construc+on programme • Construc+on traffic for period of 6 years o Moderate for 2 years (about 100 HGVs) o Bad for 1 year (about 1000 HS2 vehicles) o Really bad for about 18 months (up to 2,444 HS2 vehicles) o Moderate for 3 ½ years

  10. GRAPH

  11. TRAFFIC REPORT • Capacity of A361 through Wardington o 750-900 vehicles per hour o One way o Road width less than 6.75m • Decrease by 225 as 20% + of vehicles will be HGVs • To 525 to 675 vehicles per hour • AM peak hour southbound • PM peak hour northbound • 698 vehicles

  12. REPORT’S CONCLUSIONS • Capacity exceeded • Peak hours • Peak period • One way • 698 vehicles • More than capacity • 525-625 vehicles • 2015 traffic flow • Counter on A361 • Traffic exceeds HS2’s 2021 baseline • By 609 northbound over 12 hour period

  13. HS2 POSITION • HS2 adopt the same figures for assessing capacity • Conclusion that A361 through Wardington o “could be under pressure” o “during peak +mes of construc+on” • HS2: o Figures worst case scenario o Peak construc+on period o Under review o Looking at moving soil along the line o Internal haul roads

  14. OXFORDSHIRE CC • HS2 say that need approval of OCC o Traffic construc+on plan o Code of Construc+on Prac+ce o To reduce poten+al transport impacts • Local environmental management plan • Environmental minimum requirements • Oxfordshire CC: o A361 acceptable route in principle o HS2 not clearly iden+fied and agreed appropriate mi+ga+on measures o Or demonstrated that deliverable by project o Primary focus on safety, then conges+on o Tolerance for conges+on rela+vely high

  15. NEXT STEPS • Prepara+on for Select CommiXee hearing (18 Jan 2016) • Slides • Showing map/aerial view • Annotated • Video • Limited legal advice • Witnesses: 1 business, 1 resident? • Traffic counter + report addendum • Press HS2 on taking soil up line

  16. PROSPECTS • HS2 directed to: o Sa+sfy Select CommiXee o Capacity o Safety etc o Mi+ga+on measures • If not sa+sfied, numbers of HGVs reduced o Or bypass o Long shot

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.