HS2 PRESENTATION WHERE WE ARE NOW PETITION Pe++on presented to Parliament o Incorpora+ng material from village Concerns: o Conges+on and rat runs o Safety o Noise and vibra+on o Pollu+on o Damage to A361 o Emergency services o Lack of


slide-1
SLIDE 1

HS2 PRESENTATION

WHERE WE ARE NOW

slide-2
SLIDE 2

PETITION

  • Pe++on presented to Parliament
  • Incorpora+ng material from village
  • Concerns:
  • Conges+on and rat runs
  • Safety
  • Noise and vibra+on
  • Pollu+on
  • Damage to A361
  • Emergency services
  • Lack of impact assessment
slide-3
SLIDE 3

MITIGATION

  • Bypass or haul road
  • Re-rou+ng of traffic
  • Speed limits
  • Traffic calming measures
  • Pedestrian crossings
  • Noise insula+on measures
  • Safeguards for access for emergency services
  • Limi+ng HS2 traffic to day+me during week
slide-4
SLIDE 4

HS2 RESPONSE

  • Response by HS2 to our pe++on
  • No challenge on standing
  • No need for bypass
  • Suitable mi+ga+on measures will have to be agreed
  • With Oxfordshire CC as planning/highway authority
  • Consulta+on with Parish Council
  • No significant safety concerns/accident clusters iden+fied
  • Impact on noise, vibra+on and air quality assessed
  • No significant effects as a result of APs
  • Just traffic related
slide-5
SLIDE 5

OTHER DEVELOPMENTS

  • Mee+ng with HS2
  • Oxfordshire County Council
  • Cherwell District Council
  • Victoria Pren+s MP
  • Site visit to A361
  • LeXers to HS2 and to Oxfordshire CC
  • Seeking informa+on
  • Responses from HS2 and OCC
  • Legal advice from Pinsent Masons
slide-6
SLIDE 6

HS2 traffic - 2021

  • HS2 HGVs
  • 2,240 both ways per day
  • 1,477% increase from projected 2021 baseline of 152 HGVs
  • HS2 LGVs and cars
  • 204 both ways per day
  • 3% increase in LGVs and cars
  • To 6,605 per day from projected 2021 baseline of 6,401
  • Total of 2,444 HS2 vehicles per day (1,222 in each direc+on)
  • 8 am to 6pm weekdays
  • 8 am to 1 pm Saturdays
slide-7
SLIDE 7

INCREASES

  • Increase of 942 HGVs per day
  • From original plan
  • Decrease of 124 cars/LGVs
  • Refinement in no of workforce trips
  • Net increase of 818 HS2 vehicles per day
slide-8
SLIDE 8

REASONS FOR INCREASE

  • Increase due to “accelera+on of earthworks programme”
  • Transport of soil from Lower Thorpe Mandeville and Turweston
  • To Lower Boddington
  • Where deficit of material
  • For noise bunds and landscape integra+on
  • From Turweston via A43, M40 (J10 to 11) and A361
  • From Lower Thorpe via A422 and A361
slide-9
SLIDE 9

TIMELINES

  • Construc+on of Chipping Warden bypass
  • Will cause some increase in traffic
  • 12 month period
  • When construc+on traffic serving compound rela+vely low
  • Year 1 of construc+on programme
  • Construc+on traffic for period of 6 years
  • Moderate for 2 years (about 100 HGVs)
  • Bad for 1 year (about 1000 HS2 vehicles)
  • Really bad for about 18 months (up to 2,444 HS2 vehicles)
  • Moderate for 3 ½ years
slide-10
SLIDE 10

GRAPH

slide-11
SLIDE 11

TRAFFIC REPORT

  • Capacity of A361 through Wardington
  • 750-900 vehicles per hour
  • One way
  • Road width less than 6.75m
  • Decrease by 225 as 20% + of vehicles will be HGVs
  • To 525 to 675 vehicles per hour
  • AM peak hour southbound
  • PM peak hour northbound
  • 698 vehicles
slide-12
SLIDE 12

REPORT’S CONCLUSIONS

  • Capacity exceeded
  • Peak hours
  • Peak period
  • One way
  • 698 vehicles
  • More than capacity
  • 525-625 vehicles
  • 2015 traffic flow
  • Counter on A361
  • Traffic exceeds HS2’s 2021 baseline
  • By 609 northbound over 12 hour period
slide-13
SLIDE 13

HS2 POSITION

  • HS2 adopt the same figures for assessing capacity
  • Conclusion that A361 through Wardington
  • “could be under pressure”
  • “during peak +mes of construc+on”
  • HS2:
  • Figures worst case scenario
  • Peak construc+on period
  • Under review
  • Looking at moving soil along the line
  • Internal haul roads
slide-14
SLIDE 14

OXFORDSHIRE CC

  • HS2 say that need approval of OCC
  • Traffic construc+on plan
  • Code of Construc+on Prac+ce
  • To reduce poten+al transport impacts
  • Local environmental management plan
  • Environmental minimum requirements
  • Oxfordshire CC:
  • A361 acceptable route in principle
  • HS2 not clearly iden+fied and agreed appropriate mi+ga+on measures
  • Or demonstrated that deliverable by project
  • Primary focus on safety, then conges+on
  • Tolerance for conges+on rela+vely high
slide-15
SLIDE 15

NEXT STEPS

  • Prepara+on for Select CommiXee hearing (18 Jan 2016)
  • Slides
  • Showing map/aerial view
  • Annotated
  • Video
  • Limited legal advice
  • Witnesses: 1 business, 1 resident?
  • Traffic counter + report addendum
  • Press HS2 on taking soil up line
slide-16
SLIDE 16

PROSPECTS

  • HS2 directed to:
  • Sa+sfy Select CommiXee
  • Capacity
  • Safety etc
  • Mi+ga+on measures
  • If not sa+sfied, numbers of HGVs reduced
  • Or bypass