Hillsboro High School

Design and Construction Update

February 15, 2017

slide-2
SLIDE 2
  • Dr. Shuler Pelham

Executive Principal, Hillsboro High School

slide-3
SLIDE 3

Mary Pierce

Board of Education Member – District 8

Russ Pulley

Metro Council Member– District 25

slide-4
SLIDE 4

David Proffitt

Director MNPS Facility Planning & Construction

Anna Roberts

Artifice, LLC

slide-5
SLIDE 5

Hillsboro High School

Scope of Project:

  • 1600 student capacity upon completion
  • Reconfigured spaces to support the Academy model
  • Relocated administration with security vestibule and access to

Hillsboro Pike

  • Enrollment center within the school building with dedicated entrance
  • MTA mini hub created on Hillsboro Pike
  • Dedicated spaces in the new design for project based learning
  • Enclosed Courtyard for outdoor learning
  • Historic façade to remain on Hillsboro Pike
slide-6
SLIDE 6

Hillsboro High School

Scope of Project:

  • New cafeteria and kitchen
  • New library
  • Complete renovation of all interior spaces
  • Technology upgrades for entire building including a projector and

audio enhancement system in each classroom

  • Reconfigured and new spaces created for arts programs
  • Outdoor sports locker area created and renovation of current

indoor sports and PE locker rooms

slide-7
SLIDE 7

Hillsboro High School

Scope of Project:

  • Interior Renovations include the following:
  • New windows to replace old single pane steel windows
  • New finishes including paint, ceilings, flooring, window shades
  • New cabinetry
  • Magnetic marker boards in each classroom
  • New classroom furniture to allow flexibility for student collaboration
  • Enhanced technology in each learning space
  • LED lighting in all spaces
  • New HVAC system throughout
slide-8
SLIDE 8

Hillsboro High School

Scope of Project:

  • Site Improvements include the following:
  • Eliminating curb cuts along Hillsboro Pike except for entry near current traffic

light at mall

  • Burro Boulevard created behind building for student/staff parking access and

parent pick up line

  • A dedicated drive for busses
  • Parking garage with staff parking below and student parking above
  • Multi purpose sports field located on top of parking garage
  • Football stadium reconfiguration with 8 lane track
  • New softball field and tennis courts
  • Areas included for recycling center, fruit stand, and Christmas tree lot
slide-9
SLIDE 9

Place site plan here

slide-10
SLIDE 10

1st Floor

February 15, 2017

slide-11
SLIDE 11

2nd Floor

February 15, 2017

slide-12
SLIDE 12

4th Floor 3rd Floor

February 15, 2017

slide-13
SLIDE 13

Hillsboro High School

Timeline:

  • Construction to begin summer of 2017
  • Multiple phases of construction over 32 months
  • Demolish the small gym and art rooms and create temporary

classrooms in portions of the existing building

  • Construct 4 story building where small gym & arts were removed
  • Renovate the portions of the existing building which will remain
  • Demolish the voTech building
  • Construct the parking garage
  • Construction is anticipated to be completed by May 2020
  • Students will remain within the portions of the building not under

construction during the project.

slide-14
SLIDE 14

PHASE 1 PHASE 2 PHASE 3

4th Floor 3rd Floor 2nd Floor 1st Floor

February 15, 2017

slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

Questions