SCS lorry routes Camden drop-in presentation June 2019 01/07/2019 - PowerPoint PPT Presentation

SCS lorry routes Camden drop-in presentation June 2019 01/07/2019 1 HS2 activity timeline Design and other professional services This presentation outlines the lorry routes Enabling works which will be used for the main civils


  1. SCS lorry routes Camden drop-in presentation June 2019 01/07/2019 1

  2. HS2 activity timeline Design and other professional services This presentation outlines the lorry routes • Enabling works which will be used for the main civils construction works north of Hampstead Main works Road Bridge (SCS Railways) Stations These are separate to the preparatory • Railway systems works that are already taking place in Camden (Costain Skanska JV) Rolling stock 01/07/2019 2

  3. Route overview 01/07/2019 3

  4. The Local Traffic Management Plan (LTMP) lists roads for proposed lorry routes and traffic temporary and permanent shows site boundaries and the management strategy; highway works, including main access points and including specific measures for vehicle holding area forecasts lorry movements cyclists follows requirements set out informs a ‘Schedule 17’ lorry lists key stakeholders and the in the Environmental route application and lists commitments to them Minimum Requirements consents needed (EMR) 01/07/2019 4

  5. Background We have limited options for locating our worksite access and exit points in the Euston Approaches • We are doing all we practically can to reduce impacts to road users, residents, schools and the community • We are committed to safety and protecting the environment • We are committed to keeping construction traffic to roads designed to take heavy goods vehicles whenever possible • We are committed to ongoing engagement to improve how we manage impacts 01/07/2019 5

  6. 6 The decision to use the routes is based on… feedback from discussions routes described within the most suitable routes to with the community and Environmental Statement worksites working groups shortest route from the reducing the impact on the Local Authority engagement Transport for London Road community and Network (TLRN) environment where possible

  7. 01/07/2019 7 Our key considerations in reducing construction traffic impacts consider options to enhanced safety use red routes and HS2 integrated logistics reduce construction measures e.g. driver roads designed for hub proposal traffic on residential education, schools HGVs where possible streets engagement advisory 10mph maximise materials proposal to use vehicles speed calming signage on Regent’s moved by rail out of with improved sight Park Estate roads Euston station worksite lines for safety considering use of higher capacity vehicles meaning fewer vehicle movements & emissions

  8. Phase 1 - Lorry routes to Euston Approaches worksite EWC Haul Road Access Left-in, left out. Right-out TBC pending further investigation Stanhope Street Entry / Exit Vehicle Holding Area Hampstead Road Euston Approaches Worksite - Granby Terrace Overbridge Satellite Compound; Robert Street - Carriage Shed and Park Village East Satellite Compound; - A400 Hampstead Road Overbridge (north) Satellite Compound Albany Street Road closed Proposed lorry route A501 Euston Road Continuation of proposed route to Adelaide Road worksite Site access – entry/exit Click to add text Approx. duration 4 months

  9. Phase 2 - Lorry routes to Euston Approaches worksite Street level layby access Entry / Exit EWC Haul Road Access Left-in, left out. Right-out TBC pending further investigation Stanhope Street Vehicle Holding Area Entry / Exit Hampstead Road Euston Approaches Worksite - Granby Terrace Overbridge Satellite Compound; Robert Street - Carriage Shed and Park Village East Satellite Compound; - A400 Hampstead Road Overbridge (north) Satellite Compound Albany Street Road closed Proposed lorry route A501 Euston Road Continuation of proposed route to Adelaide Road worksite Site access – entry/exit Click to add text Approx. duration 14 months

  10. Phase 3 - Lorry routes to Euston Approaches worksite Street level layby access Entry / Exit Entry Hampstead Road Bridge extension worksite Stanhope Street Vehicle Holding Area Exit Hampstead Road Euston Approaches Worksite - Granby Terrace Overbridge Satellite Compound; Robert Street - Carriage Shed and Park Village East Satellite Compound; - A400 Hampstead Road Overbridge (north) Satellite Compound Albany Street Road closed Proposed lorry route A501 Euston Road Continuation of proposed route to Adelaide Road worksite Site access – entry/exit Click to add text Approx. duration 3 years

  11. Phase 4 – Proposed road closure Street level layby access Entry / Exit Hampstead Road Bridge extension worksite Stanhope Street Vehicle Holding Area Entry / Exit Hampstead Road Euston Approaches Worksite - Granby Terrace Overbridge Satellite Compound; - Carriage Shed and Park Village East Robert Street Satellite Compound; - A400 Hampstead Road Overbridge (north) Satellite Compound Albany Street Proposed road closure Proposed lorry route A501 Euston Road Continuation of proposed route to Adelaide Road worksite Site access – entry/exit Click to add text Planned duration 2x 4 weeks

  12. Lorry routes to Adelaide Road worksite Adelaide Chalk Road Farm Stn Camden Swiss High St Cottage Adelaide Road worksite Route during A41 Finchley Road Hampstead Road closures Hampstead Road Euston Station St John’s Wood Road Regents Park A5 Edgeware Road Baker St A501 Euston Road

  13. Euston Approaches forecast HGV movements 01/07/2019 100 150 200 250 300 350 400 450 500 50 0 Month 01 Month 02 Month 03 Month 04 Busy period Month 05 Month 06 Month 07 Month 08 Month 09 Month 10 Approaches worksites - 706 ES cumulative for Euston Month 11 Month 12 Month 13 Month 14 Month 15 Month 16 Month 17 Month 18 Month 19 Busy period avg. - 300 Month 20 Month 21 Month 22 Month 23 Month 24 Month 25 Month 26 Month 27 Month 28 Month 29 Month 30 Month 31 Month 32 Peak month - 450 Month 33 Month 34 Month 35 Month 36 Month 37 Month 38 Month 39 Month 40 Month 41 Month 42 Month 43 Month 44 Month 45 Month 46 Month 47 Month 48 Month 49 Month 50 Month 51 Month 52 Month 53 Month 54 Month 55 Month 56 Month 57 Month 58 Month 59 Month 60 Month 61 Month 62 13

  14. 01/07/2019 Adelaide Road forecast HGV movements 10 20 30 40 50 60 70 80 0 Month 01 Month 02 Month 03 Month 04 ES peak - 100 Month 05 Month 06 Month 07 Busy period Month 08 Month 09 Month 10 Month 11 Month 12 Month 13 Month 14 Peak month – 80 (rounded up) Month 15 Month 16 Month 17 Month 18 Month 19 Month 20 Month 21 Busy period avg. - 60 Month 22 Month 23 Month 24 Month 25 Month 26 Month 27 Month 28 Month 29 Month 30 Month 31 Month 32 Month 33 Month 34 Month 35 Month 36 Month 37 Month 38 Month 39 Month 40 Month 41 Month 42 Month 43 Month 44 Month 45 Month 46 Month 47 Month 48 Month 49 Month 50 Month 51 Month 52 Month 53 Month 54 Month 55 Month 56 Month 57 Month 58 14

  15. What have we done with previous feedback Phase works to reduce Mixed responses for use Favour the use of Cyclists mixing with impact from road of Stanhope Street vs Hampstead Road / use of Heavy Goods Vehicles minor roads shown within ES closures Park Village East maximising the use of further engagement allowing for wider lanes co-ordinating with Hampstead Road (shortest with Camden Council through our works authorities and other route from the Transport for areas to allow vehicles contractors with works and Traffic Working London Road Network) to comfortably pass within the area Group cyclists 01/07/2019 15

  16. What feedback can you give local events peak times for impacted by these traffic along these lorry routes roads concerns about walking routes school exam health and safety (pick-up/drop-off periods and ideas to areas, and address them transport) 01/07/2019 16

  17. Thank you If you have a question about HS2 or our works, please contact our Helpdesk on 08081 434 434 or email HS2enquiries@hs2.org.uk 01/07/2019 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.