Geotechnical Engineering Applications US Territorial Peer Exchange (USTPE) August 2018 Outline FHWA Geotechnical Resources Geotechnical Challenges for the Territories FHWA/NHI Guidance Documents Geotech Tools Website GRS-IBS


slide-1
SLIDE 1

Geotechnical Engineering Applications

US Territorial Peer Exchange (USTPE) August 2018

slide-2
SLIDE 2

Outline

 FHWA Geotechnical Resources

– Geotechnical Challenges for the Territories – FHWA/NHI Guidance Documents – Geotech Tools Website

 GRS-IBS Design and Construction  Unstable Slope Management Program

(USMP)

 Rockfall Mitigation

slide-3
SLIDE 3

FHWA Geotechnical Resources

 May not have geotechnical experience

within full-time staff

 Limited availability of geotechnical

consultants

 Limited capabilities to perform site

investigations

 No support for specifications  No support during construction

Territory Geotechnical Challenges

slide-4
SLIDE 4

FHWA Geotechnical Resources

FHWA/NHI Guidance Documents

 FHWA website with numerous guidance

documents available for free download

https://www.fhwa.dot.gov/engineering/geotech/library_listing.cfm

slide-5
SLIDE 5

 We can

provide documents not archived

  • n the

website upon request

https://www.fhwa.dot.gov/engineering/geotech/library_listing.cfm

FHWA Geotechnical Resources

FHWA/NHI Guidance Documents

slide-6
SLIDE 6

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-7
SLIDE 7

A Comprehensive Web-Based Information & Guidance System for:

 Embankment, Ground Improvement &

Pavement Applications

 Project Development and Delivery Options

www.GeoTechTools.org

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-8
SLIDE 8

To make geotechnical solutions more accessible to public agencies in the U.S. for rapid renewal and improvement of the transportation infrastructure.

Goal of GeoTechTools Project

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-9
SLIDE 9

The system collects, synthesizes, integrates, and organizes a vast amount of critically important information about geotechnical solutions on a readily accessible website

Value of the System

 Fact Sheets  Design Procedures  Cost Estimating Tools  Bibliography  Case Histories  Photographs  QA/QC Procedures  Specifications

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-10
SLIDE 10

Technology Selection Tool

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-11
SLIDE 11

Technology Selection Tool

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-12
SLIDE 12

Technology Selection Tool

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-13
SLIDE 13

Technology Selection Tool

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-14
SLIDE 14

Technology Selection Tool

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-15
SLIDE 15

Example: Aggregate Columns

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-16
SLIDE 16

Technology Fact Sheet

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-17
SLIDE 17

Technology Photographs

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-18
SLIDE 18

Cost Data and Specifications

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-19
SLIDE 19

Example: Aggregate Columns

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-20
SLIDE 20

Aggregate Columns

Beneficial Reuse of Waste Materials

Bio-Treatment for Subgrade Stabilization

Blast Densification

Bulk-Infill Grouting

Chemical Grouting/ Injection Systems

Chemical Stabilization of Subgrades & Bases

Technologies Addressed

Column-Supported Embankments

Combined Soil Stabilization with Vertical Columns

Compaction Grouting

Continuous Flight Auger Piles

Deep Dynamic Compaction

Deep Mixing Methods

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-21
SLIDE 21

Drilled/Grouted & Hollow Bar Soil Nailing

Electro-Osmosis

Excavation & Replacement

Fiber Reinforcement in Pavement Systems

Geocell Confinement in Pavement Systems

Geosynthetic Reinforced Construction Platforms

Geosynthetic Reinforced Embankments

Technologies Addressed

Geosynthetic Reinforcement in Pavement Systems

Geosynthetic Separation in Pavement Systems

Geosynthetics in Pavement Drainage

Geotextile Encased Columns

High-Energy Impact Rollers

Hydraulic Fill + Vacuum Consolidation + PVDs

Injected Lightweight Foam Fill

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-22
SLIDE 22

Intelligent Compaction

Jet Grouting

Light Weight Fills

Mechanical Stabilization of Subgrades & Bases

MSE Walls

Micropiles

Onsite Use of Recycled Pavement Materials

Partial Encapsulation

PVDs & Fill Preloading

Technologies Addressed

Rapid Impact Compaction

Reinforced Soil Slopes

Sand Compaction Piles

Screw-In Soil Nailing

Shoot-In Soil Nailing

Shored MSE Walls

Traditional Compaction

Vibrocompaction

Vibro-Concrete Columns

FHWA Geotechnical Resources

GeoTech Tools Web Application

slide-23
SLIDE 23

GRS-IBS Design and Construction

slide-24
SLIDE 24

Unstable Slope Management Program (USMP)

slide-25
SLIDE 25

USMP: Step-by-Step

1.

Evaluate transportation system use and needs; target USMP implementation

2.

Rate identified transportation corridors based on maintenance input

3.

Prioritize Rated Slopes

4.

Develop conceptual designs and estimates by geotechnical specialist for highly rated slopes only

5.

Evaluate benefit-costs and reprioritize rated slopes for proactive project selection

6.

Track slopes in USMP; watching for trends of deterioration that require proactive risk reduction intervention

slide-26
SLIDE 26

Function of USMP

 Prioritize & manage unstable slopes  Includes soil and rock slopes  Developed for low or medium volume roads

(not major interstate highways)

 Uses proven unstable slope systems  Generate one standard set of criteria  Efficient field survey process (Form or App)  Monitor and track deterioration  Prioritize preventative maintenance

slide-27
SLIDE 27

USMP Website Map Functionality

slide-28
SLIDE 28

USMP Website Map Functionality

 Allows for a

quick overview

  • f the site

 Includes five

photos from the most recent edit

 Has links to:

– History of edits – All site photos – All files uploaded

slide-29
SLIDE 29

USMP Rating Form

 Many

measurements auto-calculate

 Photos and

documents can be uploaded

slide-30
SLIDE 30

Preliminary Ratings

 Rapid

assessment tool to limit time spent at a good slope

 Three landslide

  • r rockfall

hazard ratings and two risk rating categories required

slide-31
SLIDE 31

Detailed Slope Hazard & Risk Rating Categories

Total USMP score translates to good, fair, and poor conditions for map symbols

slide-32
SLIDE 32

New Slope Event Form

 Intended for any

employee to provide basic information about new unstable slope events

slide-33
SLIDE 33

Maintenance Form

 Simplified

maintenance information is documented

 This information

with periodic re- rating information provides expenditures and deterioration rates for slope assets

slide-34
SLIDE 34

Searching and Reporting

slide-35
SLIDE 35

Example Project Denali National Park

 92 Mile Denali

Park road

 Primary access  141 USMP sites

rated by temporary park staff

slide-36
SLIDE 36

Example Project Denali National Park

slide-37
SLIDE 37

USMP App

 Apps only include the rating, new slope

event, and maintenance forms (same input categories as online version)

 Final Android and iOS apps are available at

the Google Play Store and on iTunes

 Collect data and photos in offline mode and

can be uploaded one at a time to the website when back online

slide-38
SLIDE 38

USMP Manual and Guidance Documents

slide-39
SLIDE 39

Other USMP Products

 6-minute video on “Why the USMP for

FLMAs is Beneficial”

 40-minute video that shows “How to Rate

an Unstable Slope”

 Training presentations for the three, two-

day workshops held in 2017

https://westerntransportationinstitute.org/research_projects/development-of-unstable- slope-management-program-for-federal-land-management-agencies-phase-2/

slide-40
SLIDE 40

USMP Questions?

slide-41
SLIDE 41
slide-42
SLIDE 42

ROCKFALL MITIGATION

slide-43
SLIDE 43

OUTLINE

 Assessment  Design Tools  Decision Tools  Rock and Soil Failure Modes  Rockfall Mitigation Methods  Mitigation Projects

slide-44
SLIDE 44
  • 1. Scoping
  • 2. Field

Investigations

  • 3. Stability Analyses
  • 4. Rockfall

Mitigation

  • 5. Construction

Requirements

Rockfall Assessment

slide-45
SLIDE 45

Design tools

 Richie Ditch Criteria- 1960’s  ODOT- Rockfall Area Catchment

Design (RCAD) 2001

 Colorado Rockfall Simulation Program

(CRSP)

 RocScience Software

– RocPlane, Dips, Slide, Swedge

slide-46
SLIDE 46

Decision Tools

 Where should you use your funds?  Rating Systems

– Quantitative & comparable data to manage slopes

 Rockfall Hazard Rating System (RHRS)  Colorado Rockfall Hazard Rating System

(CRHRS)

 Unstable Slope Management System

(USMP)

slide-47
SLIDE 47

Failure Modes-ROCK

Planar Wedge Toppling Circular

slide-48
SLIDE 48

Planar Failure

Discontinuity daylights out of slope face

slide-49
SLIDE 49

Wedge Failure

Two intersecting discontinuities with line of intersection daylighting out of the slope

slide-50
SLIDE 50

Toppling Failure

Discontinuity dip steeply into the slope

slide-51
SLIDE 51

Circular Failure

Rock in soil matrix or heavily fractured rock with no defined structural pattern

slide-52
SLIDE 52

Failure Mode- Colluvial: Rock in Soil

 Where erosion of soil exposes and

undermines rocks contained in a slope creates rockfall events.

 Often initiated by excavating the slope

at an angle greater than the internal friction angle of the mass.

slide-53
SLIDE 53

Colluvial: Rock in Soil

slide-54
SLIDE 54

Rockfall Mitigation Alternatives

 Realignment

– Avoid Area – Rockfall Ditch

 Condition improvement

– Scaling – Establish Vegetation/ Stop erosion

 Stabilization Measures

– Draped/ Pinned Mesh – Rock Bolting

slide-55
SLIDE 55

Rockfall Mitigation- Shift & Widen Ditch

Shift

EXISTING Ditch Width: 2 FT Ditch Shape- FLAT PROPOSED Ditch Width: 20 FT Ditch Shape: 1V:4H

slide-56
SLIDE 56

% Rockfall Retained? Existing Conditions

EXISTING CONDITIONS Ditch Width: 2 FT Ditch Shape- FLAT Est Containment (%) 15%

slide-57
SLIDE 57

PROPOSED CONDITIONS Ditch Width: 20 FT Ditch Shape: 1V:4H Est Containment (%) 99%

% Rockfall Retained? Proposed Conditions

slide-58
SLIDE 58

Overall % Improvement

EXISTING CONDITIONS Ditch Width: 2 FT Ditch Shape- FLAT PROPOSED CONDITIONS Ditch Width: 20 FT Ditch Shape: 1V:4H % Improvement Est Containment (%) Est Containment (%) 15% 99% 84%

slide-59
SLIDE 59

Rockfall Mitigation Alternatives

 Realignment

– Avoid Area – Rockfall Ditch

 Condition improvement

– Scaling – Establish Vegetation/ Stop erosion

 Stabilization Measures

– Draped/ Pinned Mesh – Rock Bolting

slide-60
SLIDE 60

Scaling Avg ~ 2-5 year cycles

Scaling - Removal of loose rock from slope by means of hand tools and/or mechanical equipment. Blast Scaling – Uses blasting or chemical expanders. Trim Blasting - Removal of overhanging faces or protruding knobs that may act as launch features on a slope.

slide-61
SLIDE 61

Hand Scaling

slide-62
SLIDE 62

Machine Scaling

slide-63
SLIDE 63

Trim Blasting

slide-64
SLIDE 64

Rockfall Mitigation Alternatives

 Realignment

– Avoid Area – Rockfall Ditch

 Condition improvement

– Scaling – Establish Vegetation/ Stop erosion

 Stabilization Measures

– Draped/ Pinned Mesh – Rock Bolting

slide-65
SLIDE 65

Draped Mesh

  • Hexagonal wire mesh,

cable nets, or high- tensile-strength steel mesh.

  • Placed on a slope to

slow erosion, control the descent of falling rocks, and restrict them to the catchment area

slide-66
SLIDE 66

Draped Mesh-Limitations

  • Requires a debris

collection ditch area.

  • Must consider debris

and snow loads on anchors.

  • Typically limited to <4

ft rock.

slide-67
SLIDE 67

Anchored wire mesh/cable nets

  • A free draining, pinned/anchored-in-place net or mesh.
  • Used to retain rocks on a slope.
slide-68
SLIDE 68

Anchored wire mesh/cable nets- Limitations

  • May form pockets of loose

rock as rockfall debris accumulates.

  • Can be difficult to clean
  • ut
slide-69
SLIDE 69

Reinforcement

Rock Bolts - Tensioned steel bars used to increase the normal-force friction and shear resistance along potential rock-block failure surfaces. Dowels - Untensioned steel bars used to increase shear

  • resistance. Increases normal-force friction once

block movement occurs. Shotcrete - Pneumatically applied concrete primarily used to halt erosion but can also retain small rock blocks and provide structural support.

slide-70
SLIDE 70

Project- Whitney Portal Road CA

 High rockfall frequency  Over steepened Colluvial Slopes 150 feet tall

– Road cuts in the ~1940’s – Glacial and Ancient Debris Deposits

 Boulders up to 20 feet “Hanging” on the

slope.

slide-71
SLIDE 71

Project- Whitney Portal Road CA

 High rockfall frequency

– Wind- induced rockfall.

 Over steepened Colluvial Slopes 150 feet tall

– Road cuts in the ~1940’s – Glacial and Ancient Debris Deposits

 Boulders up to 20 feet “Hanging” on the

slope.

slide-72
SLIDE 72

Project- Whitney Portal Road CA

 High rockfall frequency

– Wind- induced rockfall.

 Over steepened Colluvial Slopes 150 feet tall

– Road cuts in the ~1940’s – Glacial and Ancient Debris Deposits

 Boulders up to 20 feet “Hanging” on the

slope.

slide-73
SLIDE 73

Define Limits

slide-74
SLIDE 74

Define Limits

Geotech on-site during scaling operations

slide-75
SLIDE 75

Estimate Quantities

slide-76
SLIDE 76

CAUTION: ROCKS IN SLOPE ARE LARGER THAN THEY APPEAR

200 CUYD

slide-77
SLIDE 77

Road Closures

slide-78
SLIDE 78

Careful Planning Makes the Job Easier

slide-79
SLIDE 79

El Portal Road Rock Bolting Yosemite National Park, CA

 Planar Failure in rock cut

– Closed the road for several days

 More potential failures exposed

– Emergency stabilization was required

slide-80
SLIDE 80

Yosemite National Park, CA

slide-81
SLIDE 81

Design then Modify During Construction

slide-82
SLIDE 82

Rock Slope Stability Analysis

slide-83
SLIDE 83

Rock Slope Stability Analysis

slide-84
SLIDE 84

Factor of Safety 1.00 Driving Forces 7.08t/ft Resisting Forces 7.08t/ft Wedge Weight 9.43t/ft Wedge Volume 130.0 ft3/ft Shear Strength 6.78t/ft2 Normal Force 3.57t/ft Seismic Force 0.47t Plane Waviness 5◦ Water Force on Failure Plane 2.68 t/ft Water Force on Tension Crack 0.11t/ft

Analysis of Existing Slope Conditions

SAFETY FACTOR = 1.0

slide-85
SLIDE 85

Factor of Safety 1.50 Driving Forces 7.08 t/ft Resisting Forces 10.62 t/ft Wedge Weight 9.43 t/ft Wedge Volume 130.0 ft3/ft Shear Strength 8.42 t/ft2 Normal Force 6.41 t/ft Seismic Force 0.47t Plane Waviness 5.0 deg. Passive Bolt Force 3.28 t Passive Bolt angle 15.0 deg. Bolt Length 14.0 ft Anchor Length 4.58 ft Water Force on Failure Plane 2.68 t/ft Water Force on Tension Crack 0.11 t/ft

Analysis of Proposed Slope Conditions

SAFETY FACTOR = 1.5

slide-86
SLIDE 86

Rock Support System

  • Support Type
  • Bolts vs. Dowels
  • Number of bolts
  • Bolt size and steel grade
  • Bolt spacing
  • Bolt length
  • Hole diameter
  • Anchoring length
  • Bolt tension (active or passive)
  • Plate size and thickness
  • Corrosion Protection
slide-87
SLIDE 87
  • Required anchor

capacity is 50 kips

  • Use 6 bolts (50

kips/6) = 8.33 kips

  • Assume a certain

bolt size and strength

Support Capacity

slide-88
SLIDE 88

Ground Anchor Design

Based on Post Tensioning Institute Publication "Recommendations for Prestressed Rock & Soil Anchors" Fourth Edition - First Printing, 2004 Ground Anchor Properties Ground Anchor Capacity, (P) 8.33kips Drill Hole Diameter, (D) 2.50in Yield Strength of Reinforcing Bar, Fy 33.00kips #6 Bar/Grade75 Nominal Bar Diameter, (d) 0.75in Compressive Strength of Grout, (f'c) 3,000.00psi Ultimate Stress of Steel, (fut) 100,000.00psi Area of Steel, (As) 0.44in2 Geotechnical Design Geo-strata 1 ultimate bond stress, tu1 = 125.00psi Geo-strata 2 ultimate bond stress, tu2 = 0.00psi Geo-strata 3 ultimate bond stress, tu3 = 0.00psi Geo-strata 4 ultimate bond stress, tu4 = 0.00psi Soil-Grout Bond, α1 = 11.78kips/ft Soil-Grout Bond, α2 = 0.00kips/ft Soil-Grout Bond, α3 = 0.00kips/ft Soil-Grout Bond, α4 = 0.00kips/ft Total Anchor Length = Lb=P/(0.4*α) 1.77ft Use Min. 2 ft bond 0.4 =FS of 2.5

  • Min. Unbonded Length 6 ft

Structural Design

  • Min. Bar Length =

8 ft Tensile Capacity, Pt = (0.6*Fy) 19.8kips OK (> 8.33 kips) Shear Capacity, Fu = N(As)(fut) 26.4kips

slide-89
SLIDE 89

Ground Anchor Connection Design

Based on Post Tensioning Institute Publication "Recommendations for Prestressed Rock & Soil Anchors" Fourth Edition - First Printing 2004 TENSION Check Cone Shear Service Load, (P) 8.33kips Compressive Strength of Concrete, (f'c) 3,000.00psi Plate Width, (Pb) 6.00in Concrete Cover, (hc) 12.00in From face to back Equivalent Diameter, (d1) 6.77in

  • f wall

Bottom of Cone Diameter, (d2) 30.77in Acp = 0.25π(d22-d12) 707.60in2 Pcone strength = 4 X (f'c)(0.5) X Acp 155.03kips Pcone design strength = 0.67*Pcone strength 103.87kips OK PLATE THICKNESS Plate Area, (Ap) 36.00in2 Yield Stress, (fy) 36.00ksi Bearing Compression, wbp = P/Ap 231.39psi Mmax = (wbp*(b/2)^2)/2 1041.25lb-in Sx = Mmax/(.55*fy) 0.05in3 Plate Thickness, t = [(6*Sx)/(b/2)]^0.5 0.32in 1/2"x6"x6"