General Aviation Terminal & Airport Office Building IMPROVEMENT PROGRAM 1 Evaluate Existing Conditions GAT and AOB Improvements 2 1 Evaluate Existing Conditions Review Existing Documentation Original Construction 1997 Structural


slide-1
SLIDE 1

General Aviation Terminal & Airport Office Building

IMPROVEMENT PROGRAM

slide-2
SLIDE 2

GAT and AOB Improvements

2

1

Evaluate Existing Conditions

slide-3
SLIDE 3

GAT and AOB Improvements

1

3

Review Existing Documentation

Original Construction – 1997 Structural Assessment- 2006 North and South Additions- 2008 Restrooms and Vending Expansion- 2011

Evaluate Existing Conditions

slide-4
SLIDE 4

GAT and AOB Improvements

1

4

Existing Conditions Assessment

Facility Assessment Report & Engineer’s Systems Analysis required for Terminal Improvements

  • Architectural
  • Life Safety/ Code Compliance
  • Civil
  • Structural
  • HVAC
  • Plumbing
  • Electrical

Evaluate Existing Conditions

Facility Assessment Report General Aviation Terminal and Airport Office Building

slide-5
SLIDE 5

GAT and AOB Improvements

5

2

Program and Goals

slide-6
SLIDE 6

GAT and AOB Improvements

2

6

GAT Level 1: FBO Facility

  • More impressive Lobby and Customer spaces
  • “Front door to Naples”
  • CSR facilities- improve counters, line of sight

to customer and airfield

  • Customer Seating- provide more open area for

seating and variety of spaces

  • Café space- supported by Catering company
  • Reduce Car Rental Space and allocate to

Customer space

  • Flight Planning Relocated
  • Line Support needs additional space

Program and Goals

slide-7
SLIDE 7

GAT and AOB Improvements

7

GAT Level 2: Administration Offices

  • Additional space for staff
  • More offices
  • More storage
  • Better filing and office supplies areas
  • Additional meeting spaces

2

Program and Goals

slide-8
SLIDE 8

GAT and AOB Improvements

2

8

AOB Exterior

  • Renovate exterior to better match GAT
  • Remove metal siding and replace with painted

stucco to match

  • Add metal sunshades to match
  • Add Covered Canopy connection to GAT
  • Replace existing pedestrian canopy
  • Add GSE Storage Canopy to west side of

Hangar

Program and Goals

slide-9
SLIDE 9

GAT and AOB Improvements

2

9

AOB Interiors

  • Renovate Common Entry Corridor

New finishes, paint, ceilings and lights

  • Renovate Restrooms

New plumbing fixtures, floor tile, paint, ceilings and lights

  • Renovate Elevator finishes

Program and Goals

slide-10
SLIDE 10

GAT and AOB Improvements

10

Site- Landside

Site Planning Utility Design and Relocations Parking Reconfiguration Coordination with Existing Valet Operations Walkway to Offices New AOA Access Gate Signage/Wayfinding Improvements Landscape and Screen Wall Additions

2

Program and Goals

slide-11
SLIDE 11

GAT and AOB Improvements

11

Site- Airside

Fuel Truck Parking Locations AOA Access GSE Parking Utility and Manhole Relocations Potential Airside Canopy Airspace- Temporary and Permanent Aircraft Parking and Hangar Access Analysis

2

Program and Goals

slide-12
SLIDE 12

GAT and AOB Improvements

3

Design

12

slide-13
SLIDE 13

GAT and AOB Improvements

3

13

GAT Level 1: FBO Facility

  • More impressive Lobby and Customer spaces
  • “Front door to Naples”
  • CSR facilities- improve counters, line of sight

to customer and airfield

  • Customer Seating- provide more open area for

seating and variety of spaces

  • Café space- supported by Catering company
  • Reduce Car Rental Space and allocate to

Customer space

  • Flight Planning Relocated
  • Line Support additional space
  • Build out GSE Garage areas

Design

Existing Proposed

slide-14
SLIDE 14

GAT and AOB Improvements

3

14

Design

Enlarged Proposed Plan

slide-15
SLIDE 15

GAT and AOB Improvements

15

GAT Level 2: Administration Offices

  • Additional space for staff
  • Adds 2 net offices
  • Adds more storage
  • Better filing and office supplies areas
  • Convert 3 modular office back to 2nd

Conference Room

3

Design

Existing Proposed

slide-16
SLIDE 16

GAT and AOB Improvements

16

3

Design

Overall Second Floor Plan

slide-17
SLIDE 17

GAT and AOB Improvements

17

Site

  • Add Vehicular AOA Gate
  • Widen Arrival/Departure Lane
  • Relocate rental car parking
  • Relocate Lavatory Dump Station
  • Repair paving and inlet structures
  • Enhance Landscaping
  • Relocate GSE Parking

3

Design

slide-18
SLIDE 18

GAT and AOB Improvements

18

3D Study Model Images- Landside Canopy

3

Design

slide-19
SLIDE 19

GAT and AOB Improvements

19

3D Study Model Images- Connector Canopy

3

Design

slide-20
SLIDE 20

GAT and AOB Improvements

4

Construction Phasing

20

slide-21
SLIDE 21

GAT and AOB Improvements

4

21

Construction Phase 1

  • Build GSE

Storage at east side of AOB

  • Renovate AOB

Core and Restrooms

slide-22
SLIDE 22

GAT and AOB Improvements

4

22

Construction Phase 2

  • Renovate

current GSE Bays to interior space

  • Relocate Line

Support to Temporary Modulars on Ramp and renovate Line Support areas Temporary Modulars

slide-23
SLIDE 23

GAT and AOB Improvements

4

23

Construction Phase 3

  • Move Line

Support back to renovated area

  • Utilize

modularsfor Customer Lobby

  • Renovate

Customer areas

  • Construct New

Drop off Canopy Temporary Modulars

slide-24
SLIDE 24

GAT and AOB Improvements

4

24

Construction Second Floor

  • Second floor

renovation can happen while

  • ccupied
  • Work areas

demised

slide-25
SLIDE 25

GAT and AOB Improvements

5

Cost Analysis

25

slide-26
SLIDE 26

GAT and AOB Improvements

26

4

Cost Analysis

Conceptual Level ROM Estimate Construction Costs GAT Renovation = $ 2,500,000 AOB Renovation = $ 1,250,000 Site Renovation = $ 220,000 Renovation Total = $ 3,970,000

slide-27
SLIDE 27

GAT and AOB Improvements

6

New General Aviation Terminal

27

slide-28
SLIDE 28

GAT and AOB Improvements

28

6

New General Aviation Terminal

Site Plan

  • Demo (1) Existing Hangar and Locate

Terminal at end of Radio Road for

  • Arrival on axis and prominence on site
  • Centered on aircraft Ramp
  • Increased Parking from 124 spaces to

approximately 200

slide-29
SLIDE 29

GAT and AOB Improvements

29

Concept

6

New General Avaition Terminal

slide-30
SLIDE 30

GAT and AOB Improvements

30

6

New General Aviation Terminal

slide-31
SLIDE 31

GAT and AOB Improvements

31

6

New General Aviation Terminal

slide-32
SLIDE 32

GAT and AOB Improvements

32

6

New General Aviation Terminal

slide-33
SLIDE 33

GAT and AOB Improvements

33

6

New General Aviation Terminal

slide-34
SLIDE 34

GAT and AOB Improvements

34

6

New General Aviation Terminal

Conceptual Level ROM Estimate Construction Costs 26,000 sf Two Story Terminal Site Work = $ 4,200,000 Terminal Building = $ 14,200,000 Total Project Hard Costs = $ 18,400,000

slide-35
SLIDE 35

GAT and AOB Improvements

7

New General Aviation Terminal Option 2- South Parcel

35

slide-36
SLIDE 36

GAT and AOB Improvements

36

7

New General Aviation Terminal Option 2- South Parcel

slide-37
SLIDE 37

GAT and AOB Improvements

37

7

New General Aviation Terminal Option 2- South Parcel

slide-38
SLIDE 38

GAT and AOB Improvements

38

7

New General Aviation Terminal Option 2- South Parcel

slide-39
SLIDE 39

GAT and AOB Improvements

39

7

Conceptual Level ROM Estimate Construction Costs Site Work = $ 16,000,000 Terminal Building = $ 14,200,000 26,000 sf Two Stories Storage Hangars = $ 6,400,000 (2) 20,000 sf GSE/Office/Line = $ 700,000 4,000 sf Total Project Hard Costs = $ 37,300,000

New General Aviation Terminal Option 2- South Parcel

slide-40
SLIDE 40

GAT and AOB Improvements

40

Questions/Comments