Ge Geneva neva-Harney Harney Bu Bus s Rapid pid Transit ansit Fe Feasibility asibility Study dy

Comm

  • mmuni

unity ty Adv dvisor sory y Comm

  • mmitte

ittee e Meetin eting g #6

Alter ternatives natives Up Updat ate e – Ba Basel eline ine Con

  • nce

cepts pts

www.genevabrt.org

slide-2
SLIDE 2

Baseline Assumptions - Update

  • Candlestick Point/Hunters Point Shipyard projects require strong BRT,

bicycle, and pedestrian links from Executive Park area to Caltrain.

  • Recology and City of Brisbane need and plan to make Alanna/Beatty

link to Caltrain infeasible

  • Only east-west streets that are feasible for BRT, bicycle, pedestrian link

are Blanken or Blanken/Lathrop couplet.

www.genevabrt.org 2

slide-3
SLIDE 3

Network Needs

www.genevabrt.org 3

BRT T Networ twork Pe Pede destr trian an Networ twork Bicyc ycle le Networ twork

  • Need for interim BRT to

stave off congestion impacts on travel time & reliability

  • Regional requirements

for Pedestrian-to- Transit connections at major transit stations

  • Regional requirements

for Bike-to-Transit connections at major transit stations

  • Regional requirements

for Transit-to-Transit connections at major transit stations

  • Safety is a priority

concern

  • Sole existing link

between Exec Park and Caltrain is Beatty (Class III)

  • Blanken is route for

56-Rutland

  • Safety is a priority

concern

slide-4
SLIDE 4

Baseline Assumptions

  • Candlestick Point/Hunters Point Shipyard projects require strong BRT,

bicycle, and pedestrian links from Executive Park area to Caltrain

  • Recology and City of Brisbane need and plan to make Alanna/Beatty link to

Caltrain infeasible

  • Only east-west streets that are feasible for BRT, bicycle, pedestrian link are

Blanken or Blanken/Lathrop couplet

www.genevabrt.org 4

slide-5
SLIDE 5

Assumptions Update

baseline bus routing

Candlestick Point/Hunters Point Shipyard Plan

  • Assumed

Geneva Extension for BRT (long-term)

www.genevabrt.org 5

slide-6
SLIDE 6

Assumptions update

baseline bus frequency

www.genevabrt.org 6

Increased frequency for many bus lines

  • 29 to 5-min
  • 56 to 15-min
  • Retail shuttle

to 7.5-min

slide-7
SLIDE 7

Assumptions Update

Bicycle Network

www.genevabrt.org 7

Candlestick Point/Hunters Point Shipyard Plan

  • Alanna assumed for

bike and BRT undercrossing, but did not include needed Interim Plan

slide-8
SLIDE 8

Baseline Assumptions Update

Bayshore Station Access Study

  • Recognized need

for safe bike-ped access and BRT links that were separate from freeway traffic on Geneva Ext

www.genevabrt.org 8

slide-9
SLIDE 9

Baseline Assumptions Update

www.genevabrt.org 9

Bayview Transportation Improvements Project

  • CPHPS Phase 2 Planning to

recognize need for Interim Plan that did not rely on Geneva Extension

slide-10
SLIDE 10

Baseline Assumptions Update

Bi-County Transportation Study

  • Recognized need for interim

BRT links that were independent and separate from Geneva Extension AND that avoid Recology and Beatty

Interim solution A (0-5 years)

www.genevabrt.org 10

slide-11
SLIDE 11

Baseline Assumptions Update

Bi-County Transportation Study

  • Recognized need for interim

BRT links that were independent and separate from Geneva Extension AND that avoid Recology and Beatty

Interim solution B (5-10 years)

www.genevabrt.org 11

slide-12
SLIDE 12

Ge Geneva neva-Harney Harney Bu Bus s Rapid pid Transit ansit Fe Feasibility asibility Study dy

Comm

  • mmuni

unity ty Adv dvisor sory y Comm

  • mmitte

ittee e Meetin eting g #6

Alter ternatives natives Up Updat ate e – BR BRT C Con

  • ncepts

cepts

www.genevabrt.org

slide-13
SLIDE 13

Guiding Principles

Designing to meet the BRT project goals

               

www.genevabrt.org 13

Requires parking removal

  • n both sides
slide-14
SLIDE 14

Concept Segments for GHBRT

www.genevabrt.org 14

1 2 3

slide-15
SLIDE 15

3 | Blanken – existing cross section

www.genevabrt.org 15

36’ roadway

Sidewalk width varies:

8’ – 12’ in locations

10’ travel lane too narrow for safe operation on frequent transit route

8’-12’ 8’-12’

slide-16
SLIDE 16

3 | Blanken – expected baseline

www.genevabrt.org 16

8’-12’ 8’-12’

36’ roadway

widen travel lanes for better

  • perating safety and reliability

maintain sidewalk and roadway width 10’ travel lane too narrow for safe operation on frequent transit route

8’-12’ 8’-12’

parking removal (one side) to accommodate lane expansion

slide-17
SLIDE 17

3 | Blanken – BRT options

www.genevabrt.org 17

Maintain sidewalk width:

8’ – 12’ in locations

8’-12’ 8’-12’

36’ roadway

Convert to one-way couplet w Lathrop to maintain parking on at least one side Convert outside travel lane to bus only lane

slide-18
SLIDE 18

Why widen bus lanes on high-frequency routes?

Adequate bus lanes promote operations and safety

DRAFT

www.genevabrt.org 18

St Stockt kton n St Street t between en Vallejo lejo and Sacrament mento stree eets ts

  • 30-Stockton: 11/14 collisions were sideswipes (79%)
  • 8X-Bayshore: 13/17 collisions were sideswipes (76%)

Mission sion St Street t between en 14th

th and 26

26th

th stre

reets ts

  • 14-Mission: 49/68 collisions were sideswipes (72%)
  • 49-Van Ness-Mission: 34/44 collisions were sideswipes (77%)
slide-19
SLIDE 19

Adequate bus lanes promote operations and safety

Example: Stockton Street

Narrow segment of Stockton Street

DRAFT

www.genevabrt.org 19

slide-20
SLIDE 20

Stockton Street – before

Stockton between Vallejo and Broadway 8’ parking, 9’3” travel lane 10’ travel lane 10’ travel/parking lane

Muni bus crossing double yellow line

Narrow travel lanes force Muni buses to cross double yellow line to clear parked vehicles. When large vehicles or buses travel in opposite direction, buses must stop and wait for them to pass before safely proceeding.

DRAFT

www.genevabrt.org 20

slide-21
SLIDE 21

Stockton Street – Proposal (Columbus  Broadway)

Eliminate parking on east side of Stockton Street

12’ travel lane 13’3” travel lane 12’ parking

  • 1. Eliminate parking
  • n east side of

Stockton

  • 3. Maintain parking on

west side of Stockton Street with 12’ parking lane. Retains right turn lane at Broadway.

  • 2. Shift double yellow line to

the east to create wider travel lanes in each direction Summary

  • Widens northbound and

southbound travel lanes to at least 12’ by eliminating parking on east side of street.

  • Extra right-of-way

presents future

  • pportunity to widen

sidewalk.

  • Several merchants on

east side of Stockton Street, including a Walgreens (located 100’ south of Vallejo), currently use east side parking for deliveries.

  • Parking loss: 18 spaces

including yellow zones from Columbus to Broadway North

DRAFT

www.genevabrt.org 21

slide-22
SLIDE 22

Stockton Street: Vallejo Broadway

Wider travel lanes with parking removed

DRAFT

Existing: Proposed:

8’ parking, 9’3” lane 10’ lane 10’ lane/parking 12’ parking/turn pocket 12’ lane 13’3” lane

www.genevabrt.org 22

slide-23
SLIDE 23

3 | Blanken – BRT options considered

www.genevabrt.org 23

Sidewalk width varies:

8’ – 12’ in locations

8’-12’ 8’-12’

36’ roadway

6’-10’ 8’-12’

38’ roadway

reduce / narrow sidewalk widths to retain parking (6’ feet in locations)

EXAMPLE ONLY

  • 6’ sidewalks substandard for new

construction (8’ minimum)

  • longer time to benefits with sidewalk

reconstruction

  • greater costs, though may find

savings if project bundling available

slide-24
SLIDE 24

3 | Blanken – BRT options considered

www.genevabrt.org 24

8’-12’ 8’-12’ 8’-12’ 8’-12’

maintain two-way travel on Blanken

EXAMPLE ONLY

  • no impact on Lathrop, but
  • parking removal on both sides
  • f Blanken, and
  • dedicated bus lane in only one

direction 36’ roadway

dedicated bus lane for greater reliability & travel time maintain sidewalk and roadway width

slide-25
SLIDE 25

Guiding Principles

Designing to meet the BRT project goals

www.genevabrt.org 25

              

Requires parking removal

  • n both sides

still in development...

slide-26
SLIDE 26

Thanks! anks! Qu Questions? estions?

Comm

  • mmuni

unity ty Adv dvisor sory y Comm

  • mmitte

ittee e Meetin eting g #6

Ne Next xt Me Meet eting: ng: Oc Octobe

  • ber

r 9

www.genevabrt.org

slide-27
SLIDE 27

1 Bayshore

One option, with configuration change at Sunnydale

www.genevabrt.org 27

North of Sunnydale South of Sunnydale

slide-28
SLIDE 28

Geneva

Guiding Principles

                      

www.genevabrt.org 28

slide-29
SLIDE 29

2 Geneva

2 options: 2-Lane & 4-Lane

www.genevabrt.org 29

2 lane Option 4 lane Option

slide-30
SLIDE 30

Geneva

Extent of “Station” Segments

www.genevabrt.org 30

SCHWERIN SANTOS BAYSHORE

slide-31
SLIDE 31

3a | Blanken at Bayshore/Tunnel

Bus lanes with westbound traffic only (mini transit plaza)

www.genevabrt.org 31

slide-32
SLIDE 32

Alternatives and Long-Term routes

www.genevabrt.org 32

Trunk k ro route BRT stops ps Long-Ter erm Route Ne Near-Term erm Al Altern rnat ative

Schwerin Baylands Sunnydale Arleta Little Hollywood

slide-33
SLIDE 33

Geneva-Harney BRT Feasibility Study

Study Area

www.genevabrt.org 33

slide-34
SLIDE 34

Study Area Map

www.genevabrt.org 34

slide-35
SLIDE 35

Alignment

and Potential Stop Locations

www.genevabrt.org 35

Santos Schwerin Baylands (future) Sunnydale Little Hollywood Executive Park

2 options w dedicated transit lane Side BRT to Sunnydale Mini-transit plaza w WB travel lane 1option w dedicated transit lane Mixed traffic to Arleta

slide-36
SLIDE 36

Baseline Assumptions Update

www.genevabrt.org 36

slide-37
SLIDE 37

Baseline Assumptions Update

www.genevabrt.org 37

Candlestick Point/Hunters Point Shipyard Plan

  • Alanna assumed

for bike and BRT undercrossing, but did not include needed Interim Plan

slide-38
SLIDE 38

3a | Blanken at Bayshore/Tunnel

Opportunities and Constraints

www.genevabrt.org 38

Only access to garage at 2189 Bayshore Arleta T Third Station No left at Tunnel/3rd Existing plaza