Dock H Replacement
Pillar Point Marina Built in 1987 (32 years old)
Dock H Replacement Built in 1987 (32 years old) Pillar Point Marina - - PowerPoint PPT Presentation
Pillar Point Marina Dock H Replacement Built in 1987 (32 years old) Pillar Point Marina Dock H Replacement Project Status Contract Award May 2017 Board Presentation August 2017 Public Presentation January 2018 Public Presentation May
Pillar Point Marina Built in 1987 (32 years old)
Pillar Point Marina – Dock H Replacement
Pillar Point Marina – Dock H Replacement (35) 50-ft berths – 10 more than existing (12) 55-ft berths – 5 more than existing (15) 65-ft berths – 4 more than existing (2) end ties Proposed: 62 berths (plus 2 end ties) Existing: 45 berths (plus 2 end ties) (26) 50-ft berths (7) 55-ft berths (12) 65-ft berths (2) end ties
Pillar Point Marina – Dock H Replacement Existing Guide Pile & Pedestal at Knee Braces
“Lighthouse” pedestal:
Electrical (metered) all slips: 30A/50A to each slip end tie #1: 30A/50A 50A/100A end tie #2: 30A/50A Water: Integrated hose bibbs (non-metered) hose bibb pedestal guide pile Rounded finger pier end
Pillar Point Marina – Dock H Replacement