Dock H Replacement Built in 1987 (32 years old) Pillar Point Marina - PowerPoint PPT Presentation

Pillar Point Marina Dock H Replacement Built in 1987 (32 years old) Pillar Point Marina Dock H Replacement Project Status Contract Award May 2017 Board Presentation August 2017 Public Presentation January 2018 Public Presentation May


  1. Pillar Point Marina Dock H Replacement Built in 1987 (32 years old)

  2. Pillar Point Marina – Dock H Replacement Project Status Contract Award May 2017 Board Presentation August 2017 Public Presentation January 2018 Public Presentation May 2018 65% Submitted Sept 2018 95% Submittal March 2019 Board Presentation March 2019 Combine with Johnson Pier Project? 100% Submittal TBD

  3. Pillar Point Marina – Dock H Replacement Proposed Layout Proposed: 62 berths (35) 50-ft berths – 10 more than existing (26) 50-ft berths Existing: 45 berths (plus 2 end ties) (12) 55-ft berths – 5 more than existing (7) 55-ft berths (plus 2 end ties) (15) 65-ft berths – 4 more than existing (12) 65-ft berths (2) end ties (2) end ties

  4. Pillar Point Marina – Dock H Replacement Furnishings guide pile pedestal hose bibb “Lighthouse” pedestal: Rounded finger pier end Electrical (metered) Existing Guide Pile & Pedestal at Knee Braces all slips: 30A/50A to each slip end tie #1: 30A/50A 50A/100A end tie #2: 30A/50A Water: Integrated hose bibbs (non-metered)

  5. Pillar Point Marina – Dock H Replacement Questions / Comments

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.