Vizcaya Heights Multicondominium Association, Inc. Boat Dock (Ho / - - PowerPoint PPT Presentation

vizcaya heights multicondominium association inc boat
SMART_READER_LITE
LIVE PREVIEW

Vizcaya Heights Multicondominium Association, Inc. Boat Dock (Ho / - - PowerPoint PPT Presentation

Vizcaya Heights Multicondominium Association, Inc. Boat Dock (Ho / Kingstone Dock) After-the-Fact Waiver Hearing Orange County Board of County Commissioners May 21, 2013 Permitting Permits and/or approvals were obtained from: Vizcaya


slide-1
SLIDE 1

Vizcaya Heights Multicondominium Association, Inc. Boat Dock (Ho / Kingstone Dock)

After-the-Fact Waiver Hearing Orange County Board of County Commissioners May 21, 2013

slide-2
SLIDE 2

Permitting

  • Permits and/or approvals were obtained from:

– Vizcaya MultiCondo HOA – Vizcaya Master HOA – Orange County Environmental Protection Division – Orange County Zoning Department – Orange County Building Department – Everything was done by-the-book and an active and open dialog was initiated between all “grantors” to ensure compliance with all approving parties

slide-3
SLIDE 3

Source of Error

  • Surveyor was called to stake “centerline” of unit to

ensure walkway and platform were EXACTLY down the middle.

  • Contractor was unaware of the fact that the building

“centerline” was not in alignment to the property “centerline”

  • When dock “As-built” survey was provided by surveyor,

contractor notified EPD staff and self-reported the setback encroachment

  • In no way was this encroachment a result or a

reflection of any homeowner action – strictly a contractor/surveyor error

slide-4
SLIDE 4

Original Site Plan

slide-5
SLIDE 5

Original Site Plan (Zoom)

slide-6
SLIDE 6

Staked CenterLine Survey

slide-7
SLIDE 7

“As-Built” Survey

slide-8
SLIDE 8

“As-Built” Survey (Zoom)

slide-9
SLIDE 9
slide-10
SLIDE 10

25’-18’ = 7’ Setback Encroachment

  • As a result of contractor/surveyor

miscommunication, closest point of dock infringes on 25’ side setback by 7.1’.

  • Had zoning of property been consistent with
  • ther townhouses and single family residences in

the neighborhood, only a 10’ setback would be required, thus resulting in a non-issue, as the intent was always to align the dock with the unit, not to encroach on neighboring property lines.

slide-11
SLIDE 11

7 ft As Built With 7’ Additional set back added

slide-12
SLIDE 12

As Built With 7’ Additional set back added

slide-13
SLIDE 13

Perspective View From Shore as Built Perspective View From Shore with 7’ chopped off

slide-14
SLIDE 14

No Visual Impact with Removal of 7’

  • If the encroaching 7’ of platform were to be

removed, the visual impact would remain the same from the Desai residence, as the height

  • f the non-encroaching roof still creates a

barrier to visibility.

  • Removal of the 7’ of the platform will serve no

logical purpose, and greatly impact both the homeowners’ use as well as the viability of Summertime Deck and Dock.

slide-15
SLIDE 15

Other Considerations

  • Water depth is not sufficient at present terminal

platform location - dock could have easily been extended further into lake, but homeowners

  • pted against it as a courtesy to neighbors
  • All portions of dock visible from shore have tile

roof, to ensure design cohesion throughout property and create a pleasing visual aesthetic (could have all been upper deck surface).

slide-16
SLIDE 16

Summary

  • Approvals for all permit applications were received
  • Townhome position on lot resulted in unusual

circumstances resulting in surveyor/contractor error

  • No quick and easy solution to compliance with 25’
  • setback. Any solution would impact the homeowners

and contractor greatly

  • EPD Staff had no objection to structure location other

than receipt of letter of objection from neighbor

  • EPC voted in favor of waiver, and we are kindly asking

the Board of County Commissioners to uphold the EPC decision