Delivering the Bank Station Capacity Upgrade Project Innovation through Collaboration Cate Anthony (Dr. Sauer & Partners) and John Comins (Dragados) Bank Station Capacity Upgrade Safely together Agenda Bank Station Capacity


slide-1
SLIDE 1

Bank Station Capacity Upgrade Safely together

Delivering the Bank Station Capacity Upgrade Project Innovation through Collaboration

Cate Anthony (Dr. Sauer & Partners) and John Comins (Dragados)

slide-2
SLIDE 2

Bank Station Capacity Upgrade Safely together

Agenda

  • Bank Station Capacity Upgrade
  • Collaboration at Bank
  • Combined Lining Design
  • Pile Load Transfer Structures
  • SCL Replacing Squareworks
  • Option A Joint
  • Construction Progress
  • Challenges and Successes on Site
  • Productivity
  • Resources and Equipment
  • Current and Upcoming Works
slide-3
SLIDE 3

Bank Station Capacity Upgrade Safely together

Bank Station Capacity Upgrade

slide-4
SLIDE 4

Bank Station Capacity Upgrade Safely together

Bank Station Capacity Upgrade

Triple escalators provide direct link from Central line to Northern line level Former southbound Northern line platform tunnel re-used to increase circulation and interchange space for customers Moving walkway in new tunnel provides greater capacity whilst reducing walking distances and interchange times New entrance to Bank station on Cannon Street. Lifts and triple escalators from street to Northern line and DLR New Southbound railway tunnel and platform for Northern line to create more space for customer circulation

slide-5
SLIDE 5

Bank Station Capacity Upgrade Safely together

Design Philosophy – Tier 2 Engagement

Sketch Draft Design Compliance Submission IDC IFC SCL DETAILED DESIGN SCL DETAILED DESIGN Final Design

Joseph Gallagher Tier 2 Tunnels Dr Sauer Tunnel Designer Dragados Tier 1 London Underground

slide-6
SLIDE 6

Bank Station Capacity Upgrade Safely together

Combined Lining Design

  • Approximately 15% saving in lining thickness
slide-7
SLIDE 7

Bank Station Capacity Upgrade Safely together

SCL Replacing Squareworks

slide-8
SLIDE 8

Bank Station Capacity Upgrade Safely together

SCL Replacing Squareworks

Existing assets Construction sequence New SCL tunnels

slide-9
SLIDE 9

Bank Station Capacity Upgrade Safely together

SCL Replacing Squareworks

Mechanised Excavation and Support Faster and Safer Larger Working Envelope Improved Waterproofing

slide-10
SLIDE 10

Bank Station Capacity Upgrade Safely together

Option A Joint

slide-11
SLIDE 11

Bank Station Capacity Upgrade Safely together

Construction Progress so far

Start AST shaft sinking November 2016 Start Tunnelling May 2017

slide-12
SLIDE 12

Bank Station Capacity Upgrade Safely together

Construction Progress so far – Central & WBS

slide-13
SLIDE 13

Bank Station Capacity Upgrade Safely together

Challenges and Successes – Site Establishment

slide-14
SLIDE 14

Bank Station Capacity Upgrade Safely together

Challenges and Successes – AST Shaft Sinking

slide-15
SLIDE 15

Bank Station Capacity Upgrade Safely together

Resources and Equipment - Excavation

slide-16
SLIDE 16

Bank Station Capacity Upgrade Safely together

Resources and Equipment – Concrete Supply

slide-17
SLIDE 17

Bank Station Capacity Upgrade Safely together

Resources and Equipment – Dust & Ventilation

slide-18
SLIDE 18

Bank Station Capacity Upgrade Safely together

Productivity

Tunnel Dia Shift m/day (ave.) Comment NL RT & pilot 4.9m 12hr 8hr 2.0 2.7 Full Face Including initial plant chamber NL Platform 9.8m 12hr 8hr 1.2 1.5 TH - INV Enlargement from pilot CP3 8.2m 1.3 TH - INV CL-MW 7.7m 1.8 TH - INV

slide-19
SLIDE 19

Bank Station Capacity Upgrade Safely together

Current Works – Waterproofing

  • PVC and Mapelastic spray membranes
  • 2 layer system
  • Mapelastic is water based, supplied premixed

and dust free

  • Waste is minimised and it is simple to spray
slide-20
SLIDE 20

Bank Station Capacity Upgrade Safely together

Upcoming works

slide-21
SLIDE 21

Bank Station Capacity Upgrade Safely together