STATION UPGRADE TICKET HALL STATION UPGRADE TICKET HALL Existing - - PowerPoint PPT Presentation
STATION UPGRADE TICKET HALL STATION UPGRADE TICKET HALL Existing - - PowerPoint PPT Presentation
STATION UPGRADE TICKET HALL STATION UPGRADE TICKET HALL Existing Proposed 2 Improved ticket hall area STATION UPGRADE PLATFORM LEVEL Need identified for an interchange overbridge Integrated with emergency exit to Thurloe
Existing Proposed
STATION UPGRADE – TICKET HALL STATION UPGRADE – TICKET HALL
2
Improved ticket hall area
STATION UPGRADE – PLATFORM LEVEL
- Need identified for an interchange overbridge
- Integrated with emergency exit to Thurloe Square
3
DESIGN PRINCIPLES
- Revetments: enhancing the heritage quality
- f the revetments
- Con3nuity of design: consistent design
elements for new assets
- Scale: size based on exis:ng sta:on
features and opera:onal need
- Lightweight: materials to reduce visual
impacts on heritage features
ARCHITECTURAL PRINCIPLES DISTRICT & CIRCLE NEW PLATFORM CANOPY ANALYSIS
SOUTH KENSINGTON STATION UPGRADE : 05015-AP-00-005
EASTBOUND DISTRICT LINE PLATFORM
Existing Platform Track Track Outline of new cano py Outline of stair cano py
ARCHITECTURAL PRINCIPLES DISTRICT & CIRCLE NEW PLATFORM CANOPY ANALYSIS
SOUTH KENSINGTON STATION UPGRADE : 05015-AP-00-005
Revetments: structural rhythm based on revetment pilasters for placement of columns Continuity of design: platform and stair canopies designed as one integrated element that continues from the ticket hall through the platform to the overbridge
APPROACH TO CANOPY DESIGN
ARCHITECTURAL PRINCIPLES DISTRICT & CIRCLE NEW PLATFORM CANOPY ANALYSIS
SOUTH KENSINGTON STATION UPGRADE : 05015-AP-00-005
Revetments: use of transparent glass to provide views of revetments Scale: height of canopy to match bottom of arch and similar height to existing Lightweight: elegant structure that does not detract from the revetments.
INTEGRATED APPROACH
New platform Canopy New canopy structure New platform Existing revetment
ARCHITECTURAL PRINCIPLES DISTRICT & CIRCLE NEW PLATFORM CANOPY ANALYSIS
SOUTH KENSINGTON STATION UPGRADE : 05015-AP-00-005
Revetments, continuity of design, scale, lightweight: Enhancing the quality of the revetments though column positions, lighting, signage, and detail