CRYSTAL COLLI MATI ON EXPERI MENT AT THE TEVATRON (T- 980): I - - PowerPoint PPT Presentation

crystal colli mati on experi ment at the tevatron t 980 i
SMART_READER_LITE
LIVE PREVIEW

CRYSTAL COLLI MATI ON EXPERI MENT AT THE TEVATRON (T- 980): I - - PowerPoint PPT Presentation

Fermilab Accelerator Physics Center CRYSTAL COLLI MATI ON EXPERI MENT AT THE TEVATRON (T- 980): I NSTALLATI ON REVI EW Nikolai Mokhov Fer milab T-980 I nst allat ion Review Fer milab, Bat avia, I L August 7, 2008 Review of the T980


slide-1
SLIDE 1

CRYSTAL COLLI MATI ON EXPERI MENT AT THE TEVATRON (T- 980): I NSTALLATI ON REVI EW

T-980 I nst allat ion Review Fer milab, Bat avia, I L August 7, 2008

Nikolai Mokhov Fer milab Fermilab Accelerator Physics Center

slide-2
SLIDE 2

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 2

Review of the T980 Crystal Collimator I nstallation

Thursday, August 7, 2008, 1:30 – 3:30 PM

Commit t ee: Phil Schlabach, Ron Lipt on and Br uce Hanna I nvolved: Roger Dixon, Ron Moore, Salah Chaurize, Cons Gat t uso, and T980@FNAL (Annala, Carr igan, Drozhdin, J ohnson, Mokhov, Reilly, Shiraishi, St ill, Tesarek, Zagel)

slide-3
SLIDE 3

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 3

Charge f or Crystal Collimator Committee (1) Roger Dixon: T-980 proposes t o inst all a cryst al collimat or in t he E0 st raight sect ion of t he Tevat ron in order t o t est t he f easibilit y of collimat ing t he Tevat ron beam using t he cryst al. I would like you t o assess t he over all r isk wit h r espect t o t he impact on t he Fermilab Collider program. I n part icular I would like you t o writ e a brief report t hat addresses t he f ollowing it ems:

slide-4
SLIDE 4

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 4

Charge f or Crystal Collimator Committee (2) 1. Assess t he f easibilit y meet ing t he of t he goals of t he experiment wit hin t he t ime est imat es given by t he experiment ers. 2. Assess t he t echnical f easibilit y of t he inst allat ion—Can t he inst allat ion be complet ed successf ully in t he t ime est imat ed by t he proponent s? 3. Assess any risk t o t he int egr it y of t he Tevat ron t hat result s f rom inst alling t he proposed device. 4. Assess t he risk t o bot h t he Tevat ron and t he Collider experiment s t hat result s f rom execut ing t he proposed experiment s using t he device af t er inst allat ion.

slide-5
SLIDE 5

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 5

Review of the T980 Crystal Collimator I nstallation

Presentations:

  • Nikolai Mokhov, I nt ro (st at us, goals, t imescale, impact on

D0 & CDF)

  • Rob Reilley, Goniomet er modif icat ions & improvement s
  • Dean St ill, I nst allat ion, commissioning & ear ly st udy plans
  • Rick Tesarek, New E0 inst rument at ion (commissioning &

st udy plans)

  • J im Zagel, Flying wires
slide-6
SLIDE 6

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 6

E0 Crystal Collimation Layout

crystal

E03H Collimator 3.5 mm

channeled beam

23.731 m

Pin Diode

LE033 BLM

Flying Wire

Channeled beam At E03H

33.115 m 23.731 m

slide-7
SLIDE 7

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 7

COMPARI NG EFFECTS OF PROTON HALO LOSSES FOR BENT CRYSTAL AND TUNGSTEN TARGET

E03h with crystal

200 400 600 800 1000 1200 1400

  • 10
  • 8
  • 6
  • 4
  • 2

E03HCP (mm) Loss (hz or volts) T:LE033 cr C:LOSTP cr T:LE0PIN cr

E03H scan with D49 Target

200 400 600 800 1000 1200 1400

  • 10
  • 8
  • 6
  • 4
  • 2

E03HCP (mm)) Loss (hz or volts) T:LE033 T:LE0PIN C:LOSTP

Using the crystal:

  • 1. The secondary collimat or can remain f urt her (1 mm or so)

f rom t he beam t hus reducing impedance.

  • 2. Almost a f act or of 2 reduct ion of CDF losses (in agreement

wit h modeling)!

  • 3. A f act or of >

5 lower irradiat ion of downst ream component s

Cryst al aligned at peak (118 rad)

E03 BLM CDF PI N

slide-8
SLIDE 8

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 8

Goals f or 2008 to Spring 2009 (Phase I )

  • 1. Measure channeled, volume-ref lect ed (?) and scat t ered

beams as well as beam losses downst ream of t he cryst al set up in comparison wit h simulat ions.

  • 2. Demonst rat e reproducible beam loss reduct ion in t he B0

and D0 in compar ison wit h simulat ions, aiming at a rout ine use of t he cryst al based collimat ion in t he Tevat ron st ores. Two phases as described in t he T980 MoU

Phase I Goals

slide-9
SLIDE 9

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 9

Goals f or Spring 2009 to the End of Run I I (Phase I I )

  • 1. Test and conf irm f undament al models of single-t urn and

mult i-t ur n dynamics wit h cryst als.

  • 2. Develop
  • pt imal

cr yst al/ goniomet er/ inst r ument at ion syst em f or one- and t wo-plane collimat ion exploring and exploit ing novel cr yst al t echnologies and newly under st ood phenomenon, volume r ef lect ion.

  • 3. All of t he above in conj unct ion wit h t he CRYSTAL

experiment at CERN SPS, aiming at a Phase I I cryst al- based collimat ion syst em f or t he LHC (perf ormance, reduced impedance and heavy-ion opt ion)

slide-10
SLIDE 10

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 10

STRUCT/ CATCH Simulat ions: Prof iles at 9 Critical Locations in Tevatron wit h O- Shaped Crystal E03 collimat or E11 f lying wir e

  • A. Drozhdin

Fir st t urn, all collimat ors are ret ract ed

slide-11
SLIDE 11

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 11

Multi- Turn Simulat ions with 0. 44- mrad O- shaped Crystal

All collimat ors are in wor king posit ions

  • A. Drozhdin

Tot al losses on E03 and F172 via channeling, VR and MCS. I nversely propor t ional t o Dean’s LE033 BLM wit h E03 out Channeled beam loss on E03 Edge-scat t ered in E03 and F172, x 5 Loss at B0, x 140

slide-12
SLIDE 12

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 12

Plans f or Phase I

  • 1. I nst allat ion at appr opr iat e downt ime or Oct ober mini-shut down (10-

12 hr s).

  • 2. Commissioning: pr e-beam and beam t est s and End-of -St or e st udies

(see Dean’s t alk).

  • 3. Sever al EOS st udies of beam dynamics and collimat ion ef f iciency

aiming at r epr oducibilit y and BOS t est .

  • 4. Rout ine use of cr yst als in t he Tevat r on st or es.
  • 5. P

r epar at ion of new cr yst als, har dwar e and elect r onics f or inst allat ion in t he t unnel dur ing t he Spr ing 2009 shut down.

  • 6. Fur t her plans, scope and beam r equest s depend on out come of P

hase I and ar e subj ect t o a FNAL r eview and 2009-2010 r un plans.

slide-13
SLIDE 13

T-980 Installation Review – Fermilab, Aug. 7, 2008 Crystal Collimation Experiment: Intro - N.V. Mokhov 13

I mpact on CDF/ D0

  • Benef it t o CDF/ D0: at least a f act or of 2 r educt ion in beam loss (2005

dat a). Can be a mor e subst ant ial r educt ion wit h new cr yst als and ot her har dwar e of (> J une 2009).

  • P
  • ssibly anot her cr yst al at F49 t o r educe pbar losses in CDF/ D0.
  • Maximum possible luminosit y loss in P

hase I : 20 hr s, or 4.3 pb-1 out of 1300 pb-1/ yr , or 0.33% (compar ed t o 0.68% dif f er ence in CDF and D0 luminosit ies).

  • Not hing happens if t he cryst al doesn’t channel (Dec. 2007 r esult s).
  • Minimal r isk t o t he silicon: only t he t ar get at E0 is r et r act ed, not hing

else moves.

  • Ef f ect or r isk t o CDF/ D0 wit h cryst al collimat or f or f ull st ore (BOS)

(i) cr yst al wor ks: losses r educed via ef f icient scr aping; (ii) cr yst al doesn’t wor k: re-inser t t ungst en t ar get , loose small amount of luminosit y at beginning of st or e (10 minut es), beam losses t he same.