Cruise Business 2019 Karen Obeck Seaspan Shipyards Cruise Ship - - PowerPoint PPT Presentation

cruise business 2019
SMART_READER_LITE
LIVE PREVIEW

Cruise Business 2019 Karen Obeck Seaspan Shipyards Cruise Ship - - PowerPoint PPT Presentation

05 December 2019 Cruise Business 2019 Karen Obeck Seaspan Shipyards Cruise Ship Business Seaspan Shipyards Victoria Vancouver Vancouver Shipyards Shipyards Drydock Victoria Shipyards & Vancouver Drydock are supporting the


slide-1
SLIDE 1

Karen Obeck

Cruise Business 2019

05 December 2019

slide-2
SLIDE 2

Vancouver Drydock | Teamwork Builds Ships

1

Seaspan Shipyards Cruise Ship Business

  • Victoria Shipyards & Vancouver Drydock are supporting the Cruise Ship Business
  • Both yards have a proven track record of superior on-time delivery of cruise vessel repair contracts
  • Victoria Shipyards capabilities:

– Graving dock, length 1100 ft. and width 128 ft.

  • Vancouver Drydock capabilities:

– Floating dock (Panamax), length 660 ft. and width 150 ft. – Floating dock (Careen), length 440 ft. and width 110 ft.

  • Seaspan Shipyards has executed over 50 cruise vessel contracts in the last 20 years
  • Seaspan Shipyards can provide technical and engineering services to support cruise vessel projects
  • Ideally located shipyards because very often cruises are ending in Seattle or Vancouver
  • Competition on the West Coast of Americas is in Seattle and Portland (Vigor Industries)
  • The Canadian Dollar conversion rate is attractive with regards to the competition (USD vs. CAD)

Seaspan Shipyards Victoria Shipyards Vancouver Drydock Vancouver Shipyards

slide-3
SLIDE 3

Vancouver Drydock | Teamwork Builds Ships

2

Cruise Ship Business Vancouver Drydock 2019

3 Cruise ships repaired in Drydock in 2019

  • Silver Explorer (emergency docking) for Silversea Cruises
  • MS Regatta (planned docking) for Norwegian Cruise Lines
  • MS Roald Amundsen (emergency docking) for Hurtigruten

2 Cruise ships repaired at Canada Place in 2019

  • Le Soleal for PONANT France
  • Silver Muse for Silversea Cruises
slide-4
SLIDE 4

Vancouver Drydock | Teamwork Builds Ships

3

The MS Regatta Project

September 2019

  • Arrived September 6, 2019
  • Departed from yard September 22, 2019
  • Remodelled 385 state rooms
  • Remodeled all restaurants and other common

spaces

  • New laundry machines
  • Completely new coating system on the hull
  • New propulsion units
  • Stabilizer maintenance
  • Additional mechanical work

$10 Million CAD direct and indirect benefits to the economy.

slide-5
SLIDE 5

Vancouver Drydock | Teamwork Builds Ships

4

The MS Regatta Project

Quick Figures

  • Nearly 3,000 employed
  • 2689 Crane Lifts
  • 334 Waste bins out
  • 375 20 ft. sea containers unloaded on board
  • 900 Mattresses replaced
  • 385 Staterooms refurbished
  • Local companies supporting this project:
  • Waste Control Services in Coquitlam
  • Richmond Steel in Richmond
  • Terrapure in North Vancouver
  • Petrokleen in North Vancouver
slide-6
SLIDE 6

Vancouver Drydock | Teamwork Builds Ships

5

The MS Regatta Project

About the Floatel

  • Floatel vessel called the Grand Classica
  • The home port is West Palm Beach, FL
  • Owned by Bahamas Paradise Cruise Line
  • Specially chartered by Norwegian Cruise Lines for

this refit project

  • Coastal Trade Act approval obtained
  • Grand Classica can accommodate 1800

passengers

  • Full meal service
  • Required for logistical reasons
slide-7
SLIDE 7

Vancouver Drydock | Teamwork Builds Ships

6

Why a floatel was used for the MS Regatta refit project?

  • Vancouver Shipyards was awarded this project in July 2019, which is shorter

notice than is typically received on similar projects

  • Project required accommodation for around 1800 people
  • A minimum of 1000 hotel rooms were required (double occupation)
  • Limited availability of hotel accommodations on the North Shore and on the

lower mainland, more broadly

  • In parallel, 3 conferences were underway in Vancouver in September 2019
  • A local company was used to obtain Coasting Trade License (J.B. Ellis)
  • Two weeks objection notice was implemented and no objections were received
  • Close connection with Transport Canada Marine & Security Department
  • Final Coasting Trade License was received on September 5 2019
slide-8
SLIDE 8

Vancouver Drydock | Teamwork Builds Ships

7

Cruise Ship Business Vancouver Drydock

Future Outlook

  • Over 100 cruise vessels are on order globally
  • An increased number of cruise vessels will visit Vancouver in 2020
  • Cruise season 2020 begins in April
  • Expedition cruise vessels are gaining in popularity
  • Vancouver is ideally situated as a repair and refit location to meet the requirements of the cruise ship

industry

  • Cruise companies are in need of local service providers
  • The cruise business is an important growth area for Seaspan Shipyards
slide-9
SLIDE 9

Vancouver Drydock | Teamwork Builds Ships

8

Questions?