Charter High School Addition Community Meeting Project Team Fulton County Schools Patrick Burke, Deputy Superintendent of Operations David Knotts, Executive Director of Capital Improvements Chad Word, Project Manager CGLS Architects, Inc.
Project Team
Fulton County Schools Patrick Burke, Deputy Superintendent of Operations David Knotts, Executive Director of Capital Improvements Chad Word, Project Manager CGLS Architects, Inc. Robert Sussenbach, AIA Rebecca Tyson, AIA Turner Construction Company Lance Painter, Project Manager Riverwood International Charter High School
- Dr. Robert Shaw, Principal
Building Advisory Committee RHS Staff & Faculty Representatives
What Has Been Achieved
What Has Been Achieved
What Has Been Achieved
What Has Been Achieved
ATRIUM LOBBY CEILING COLOR SCHEME
What Has Been Achieved
What Has Been Achieved
Typical Floor Learning Commons Stadium Side Student Plaza Unfinished Third Floor Front Elevation from the Parent Drop-off/ Pick-up Queue Line Entry Portal at South Side of Entrance Lobby
Phase 1 Project Milestones
April 2017 - Level 100 Substantial Completion May 2017 - Level 300 Substantial Completion June 2017 - Level 200 Substantial Completion June 2017 - Start the Renovation for the Cafeteria Expansion June 2017 - Temporary Certificate of Occupancy July 2017 - School to begin the "Move- in" Process July 2017 - Substantial Completion/ Certificate of Occupancy
Schedule of Construction Activities
PHASE 1 Mechanical Plant PHASE 1 CAFETERIA EXPANSION
CURRENT CONSTRUCTION PHASE 1
BUILDING COMPLETION JULY 2017
. WH . DNPHASE 1 CLASSROOM BUILDING
RIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
S t e e p B a n kREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
400 EXISTING PARKING SPACES AVAILABLE NEW COVERED WALKWAY CONNECTING EXISTING BUILDING WITH NEW CLASSROOM BUILDING STAFF PARKING 66 EXISTING SPACES STUDENT PARKING STUDENT DROP- OFF/ PICK- UP BUS DROP- OFF/ PICK- UP 6 EXISTING SPACES 6 EXISTING SPACES TEMPORARY HC BUS DROP- OFF/ PICK- UP STUDENT ACCESS TO & FROM BASEBALL FIELD & SCHOOL BUILDINGS EXISTING CONCESSIONS/ RESTROOM BUILDING
What is Yet Ahead
PHASE 1 Mechanical Plant
. WH . DNPHASE 2 THIRD FLOOR BUILD- OUT
PHASE 1 CAFETERIA EXPANSION NEW COVERED WALKWAY CONNECTING EXISTING BUILDING WITH NEW CLASSROOM BUILDINGRIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
S t e e p B a n kREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
400 TOTAL PARKING SPACES
6 6 E X I S T I N G S T A F F P A R K I N G S P A C E S S T U D E N T D R O P- O
- U
- O
- U
6 EXISTING SPACES
6 E X I S T I N G S P A C E S FINAL STUDENT ACCESS TO & FROM BASEBALL FIELD & SCHOOL BUILDINGS T E M P O R A R Y H C B U S D R O P- O
- U
CONSTRUCTION PHASE 2
CONSTRUCTION OF 3RD FLOOR BUILD- OUT:
COMMENCING MAY 2018 - COMPLETION AUGUST 2018
CONSTRUCTION OF CAFETERIA & MEDIA CENTER ADDITIONS:
COMMENCING JUNE 2018 - COMPLETION AUGUST 2019
2 7 2 S T U D E N T P A R K I N G S P A C E SRIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
S t e e p B a n kREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
405 TOTAL PARKING SPACES
13 EXISTING SPACES 7 N e w S p a c e s 8 NEW SPACES S T U D E N T D R O P- O
- U
CONSTRUCTION PHASE 3
DEMOLITION OF EXISTING CLASSROOMS/ CAFETERIA/ KITCHEN & MEDIA CENTER:
COMMENCING SEPT. 2019 - COMPLETION DECEMBER 2019
STUDENT ACCESS BETWEEN EXISTING AUDITORIUM & GYMNASIUM BUILDINGS DURING CONSTRUCTION OF NEW AUDITORIUM/ GYMNASIUM BUILDING ENTRANCE & EXIT OF CONSTRUCTION TRAFFIC TO STAGING AREA 2 7 2 S T U D E N T P A R K I N G S P A C E SRIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
Pedestrian Bridge S t e e p B a n kREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
13 EXISTING SPACES 405 TOTAL PARKING SPACES
7 N e w S p a c e s 8 New SpacesSTAFF PARKING 66 EXISTING SPACES
S T U D E N T D R O P- O
- U
BUS DROP- OFF/ PICK- UP STAFF/ VISITOR 80 NEW SPACES
HC BUS DROP- OFF/ PICK- UPCONSTRUCTION PHASE 4
COMMENCING DEC. 2019 - COMPLETION JUNE 2021
2 7 2 S T U D E N T P A R K I N G S P A C E S 8 N E W S T A F F S P A C E SCONSTRUCTION OF NEW GYMNASIUM/ AUDITORIUM BUILDING ADDITION:
RIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
Pedestrian Bridge S t e e p B a n kREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
13 EXISTING SPACES 424 TOTAL PARKING SPACES
7 N e w S p a c e s 8 New Spaces STUDENT DROP- OFF/ PICK- UP STAFF/ VISITOR 80 NEW SPACESCONSTRUCTION PHASE 5
DEMOLITION OF EXISTING GYMNASIUM & AUDITORIUM BUILDINGS:
COMMENCING JUNE 2021 - COMPLETION OCTOBER 2021
HC BUS DROP- OFF/ PICK- UP 2 7 2 S T U D E N T P A R K I N G S P A C E S 8 N E W S T A F F S P A C E SCONSTRUCT ONE (1) NEW TENNIS COURT & RESURFACE 4 EXISTING COURTS CONSTRUCT NEW CONCESSIONS/RESTROOM BUILDING
RIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
- Mech. Equipt.
NEW BASEBALL FIELD
S t e e p B a n k Pedestrian BridgeREVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
424 TOTAL PARKING SPACES
7 N e w S p a c e s 8 New Spaces STAFF/ VISITOR 80 NEW SPACESSTUDENT PARKING
S T U D E N T D R O P- O
- U
CONSTRUCTION PHASE 6
DEMOLITION OF EXISTING SITEWORK:
COMMENCING OCTOBER 2021 - COMPLETION NOVEMBER 2021
15 New Spaces 1 1 N e w S p a c e s Bus Drop- off/ Pick- up Queue Area and Band Practice Area R e t a i n i n g W a l l 2 7 2 S T U D E N T P A R K I N G S P A C E S 8 N E W S T A F F S P A C E S S T U D E N T D R O P- O
- U
640
EXISTING ENTRANCE TO BE CLOSED AT CONSTRUCTION CONCLUSION
New Ticket Booth & Gated EntranceRIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
Steep Bank Sloped Bank Patio Patio Existing Storage Bldg. Existing Restrooms & Concessions to be Relocated New Ticket Booth & Gated Entrance Pedestrian Bridge- Mech. Equipt.
NEW BASEBALL FIELD
REVISED 3- 8- 2017
NEW BUILDING(S) OR RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING &
- CONC. CURB & GUTTER
STUDENT PARKING
S T U D E N T D R O P- O
- U
CONSTRUCTION PHASE 7 (FINAL)
CONSTRUCTION OF AUDITORIUM LOBBY & REMAINING SITE WORK:
COMMENCING NOVEMBER 2021 - COMPLETION JANUARY 2022
15 New Spaces 1 1 N e w S p a c e s 15 New Spaces Bus Drop- off/ Pick- up Queue Area and Band Practice Area 1 6 6 F A C U L T Y P A R K I N G S P A C E S 4 3 V I S I T O R S P A R K I N G S P A C E S 2 5 N E W P A R K I N G S P A C E S 2 7 2 S T U D E N T P A R K I N G S P A C E S 8 N E W S T A F F S P A C E SRIVERWOOD INTERNATIONAL CHARTER HIGH S
CHOOL REPLACEMENT
5900 Raider Drive, NW, S andy S prings, Georgia 30328
CONSTRUCT CAFETERIA/ KITCHEN & CLASSROOM ADDITION, AND FINISH OUT THE THIRD FLOOR OF PHASE 1 BUILDING CONSTRUCT MEDIA CENTER ADDITION PEDESTRIAN BRIDGE ADDITION
EXISTING BUILDING TO BE DEMOLISHED EXISTING BUILDING TO BE DEMOLISHED EXISTING BUILDING TO BE DEMOLISHED
MECHANICAL PLANT CAFETERIA EXPANSION TEMPORARY WALKWAY CANOPY PHASE 1 BUILDING ADDITION PHASE 1 BUILDING ADDITION EXISTING AUDITORIUM EXISTING INDOOR ATHLETIC FACILITIES EXISTING INDOOR ATHLETIC FACILITIES EXISTING AUDITORIUM EXISTING INDOOR ATHLETIC FACILITIES PROVIDE TEMPORARY CLOSURE OF WALL CONSTRUCTION EXPOSED BY DEMOLITION OF ADJACENT AREAS CONSTRUCT NEW ATHLETICS AND ARTS BUILDING EXISTING HIGH SCHOOL BUILDING
CONSTRUCTION PHASING DIAGRAMS
REVISED 1-23-2017
CURRENT CONSTRUCTION PHASE 1 CONSTRUCTION PHASE 2 CONSTRUCTION PHASE 4 CONSTRUCTION PHASE 5 CONSTRUCTION PHASE 3