city pro je c ts co nc e pts co sting co nstruc tio n
play

City Pro je c ts Co nc e pts, Co sting & Co nstruc tio n Da - PowerPoint PPT Presentation

City Pro je c ts Co nc e pts, Co sting & Co nstruc tio n Da le C. He g lund, PE / PL S - Pro g ra m Dire c to r, NDL T AP Je ro d K la b unde , PE Pro je c t Ma na g e r, Mo o re E ng ine e ring NDL C Annua l Co nfe re nc


  1. City Pro je c ts – Co nc e pts, Co sting & Co nstruc tio n Da le C. He g lund, PE / PL S - Pro g ra m Dire c to r, NDL T AP Je ro d K la b unde , PE – Pro je c t Ma na g e r, Mo o re E ng ine e ring NDL C Annua l Co nfe re nc e , F a rg o – Se pt 29, 2017

  2. I nfo Ha nd-o ffs T ime Mo ne y Risk

  3. 300 B.C. Ro ma n E mpire

  4. Ro a dwa y/ Stre e t Se c tio ns

  5. E ve ryo ne L o ve s a .8 .6 2.5 4.1 .6 .7 2.9 1.0 .5 .5 Top ten country roadway networks, shown in million miles

  6. I nfo Ha nd-o ffs T ime

  7. L o o king Ba c k…

  8. Pro je c t T ime line Process Concept Design Maintenance Approvals Funding Construction Field Data

  9. Sta te L a w Ce ntury Co de • Munic ipa l Go ve rnme nt (40) • Bidding a nd Qua lific a tio n Ba se d Se le c tio n (48)

  10. City Pro je c ts – ND Ce ntury Co de • Develop a long-term plan • Inform residents • Evaluate whole city / divide into regions • Acquiring financing • Legal process for project • Public involvement • Voting vs. protesting

  11. E nviro nme nta l Re vie w & Pe rmits • • Dept. of Health US Army Corps of Engineers • Tribal Governments • NDDOT • County/Township Government • Game & Fish • Water Resource Districts (Water Board) / Rural • State Water Commission Water Districts • USDA / NRCS • • US Fish & Wildlife Other Potential Stakeholders: Wetlands, Utility Companies, Private Landowners, Taxpayers, Gas • Historical Preservation Office and Oil Pipelines, Easement Holders, Etc. • Railroads • Airports *Can be dependent on location, project type and • ND Parks & Rec funding source

  12. Stre e t Surve ys Pavement Management Plans (Large Cities) - Regular evaluations using technology – ride quality, roughness,….. - GIS database and mapping - Pavement management software Plan Regular Inspections (Small Cities) - Street surveys, 3-5 year interval - Less technology - Planning

  13. Chad Petersen – 701-845-9446 chad.petersen@kljeng.com

  14. Re g ula tio ns

  15. T ime to Star t is NOW!!

  16. I nfo Ha nd-o ffs Mo ne y

  17. Pro je c t De ve lo pme nt Pla nning – a ke y to sa ving mo ne y Pro je c t spe c ific a tio ns - use d to c le a rly de fine the ma te ria l a nd c o mpo ne nts

  18. Disc o ve ry Pha se

  19. Roadway Ailme nts

  20. Pa ve me nt Cro ss Se c tio n

  21. Ma te ria ls

  22. Co sts, F unding a nd Re pa yme nt  Engineer’s Opinion of Cost • Single citywide project • Phase project, completion date, milestones…  Project Funding • Low Interest Loans for Streets − New for 2017: Infrastructure Revolving Loan from Bank of ND (2% Interest L • Repayment – Determine Appropriate Length of Time • Repayment Options − Budget for Work − Special assessments − Rates / Revenues − Sales Tax − General Obligation Bonds

  23. E ng ine e r’ s Opinio n o f Pro je c t Co st  Proposed City of Kulm 2016 ($2,000,000) Approximate Assessment per Lineal Footage - $86.96 • Projected Repayment Scenarios (100% Financed) Approximate Project Area Front Footage 23,000 Approximate Assessment per Lineal Footage $86.96 City's Annual Payment (15 Years @ 4.5% Interest) $186,227.62 Total Assessment Per Property 25' Lot $2,173.91 50' Lot $4,347.83 75' Lot $6,521.74 100' Lot $8,695.65 Annual Payment per Property (Based on 15-Year @ 4.5% Interest) Assessment Per Foot $8.10 25' Lot $202.42 50' Lot $404.84 75' Lot $607.26 100' Lot $809.69 Notes/Assumptions: 1. This assumes 100% of project is financed. 2. This assumes a straight assessment across all areas. 3. Can consider doing project over multiple phases. 4. We assume interest rate will be better than projected 4.0% interest (conservative).

  24. Co st E stima te s (Pe r Blo c k) Cra c k Se a l – $500 -1,500 Chip Se a l - $2,000 – 4,000 E dg e Mill & Aspha lt Ove rla y - $15,000 – 25,000 Curb & Gutte r - $20,000 – 30,000 F ull De pth Aspha lt - $60,000 – 90,000 F ull De pth Co nc re te - $100,000 -150,000 *Co sts a re hig hly va ria b le a nd d e p e nd e nt o n fa c to rs suc h a s wid th o f stre e t, typ e o f stre e t, size o f p ro je c t, timing o f b id s/ wo rk, lo c a tio n a nd c o mp e titio n b e twe e n c o ntra c to rs! See cost estimating handout – data provided by Jerod Klabunde, Moore Engineering, and Todd Norton & Mark Lambrecht, Advanced Engineering and Environmental Services, Inc.

  25. L ife Cyc le Co sts Co nstruc tio n Co sts Ma inte na nc e Co sts Sa lva g e Va lue

  26. Ca pita l I mpro ve me nts => pro je c ts Ma inte na nc e => pre se rve inve stme nts

  27. Pa ve me nt De te rio ra tio n Cost of 'Timely' Maintenance 75% Time 10 40% Quality Each $1.00 Drop 8 of Renovation Cost 6 Will Cost $4.00 40% Quality 4 to $5.00 if Drop Delayed to Here 12% 2 Time Total Failure 0 0 4 8 12 16 YEARS (Time Varies for Each Road Section)

  28. Pa ve me nt Pre se rva tio n Washington State Sample

  29. Alte rna tive s – Inve stme nt Stra te g ie s

  30. Public E xpe c tations

  31. Outre a c h E ffo rts

  32. I nfo Ha nd-o ffs Risk

  33. E ve ryo ne L o ve s a …….

  34. Co nstruc tio n L o a ds

  35. Cha ng e d Co nditio ns

  36. F ro st He a ve s Frost Damage in Pavement: Causes and Cures (You Tube video) https:/ / www.yo utub e .c o m/ wa tc h? v=7g jtF a CxVRU

  37. I ndustry T re nds

  38. Ma inte na nc e E q uipme nt Ne e ds

  39. T ype s o f Pa ve me nt F a ilure s

  40. Ba nd-Aids o r Stitc he s?

  41. I nfo Ha nd-o ffs T ime Mo ne y Risk

  42. Ro ma n E ng ine e r Re so urc e L ist ND Ce ntury Co de : Se c tio n 40 (Munic ipa l) Se c tio n 43 (E ng ine e r) Se c tio n 48 (Bid T hre sho ld) ND L o c a l Go ve rnme nt Ma nua l NDL C ND Offic ia ls Ha ndb o o k ADA Guide fo r Sma ll T o wns

  43. Ha ndo uts Pro c e ss Che c klist ADA Guide Stre e t Asse ssme nt Ro ug h E stima ting I nfo Pre se nte r Co nta c t I nfo

  44. …ta ke c ha rg e a nd c re a te the future yo u wa nt!

  45. City Pro je c ts – Co nc e pts, Co sting & Co nstruc tio n S - Pro g ra m Dire c to r, NDL T AP Da le C. He g lund, PE / PL 701-318-6893 – d a le .he g lund @ nd su.e d u – Pro je c t Ma na g e r, Mo o re E ng ine e ring Je r od Kla bunde , PE 701-566-4289 – Jkla b und e @ mo o re e ng ine e ring inc .c o m NDL C Annua l Co nfe re nc e , F a rg o – Se pt 29, 2017

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend