So lic ita tio n R2114080P1 Co nstruc tio n Eng ine e ring I nsp e c tio n: Pe mb ro ke Rd fro m Dyke s Rd to Silve r Sho re s Blvd L e d b y thre e princ ipa ls with o ve r 50 ye a rs o f c o mb ine d e xpe rie nc e , fo c using o n pro


slide-1
SLIDE 1

L e d b y thre e princ ipa ls with o ve r 50 ye a rs o f c o mb ine d e xpe rie nc e , fo c using

  • n pro viding

Co nstruc tio n E ng ine e ring a nd I nspe c tio n (CE I ) se rvic e s fo r a va rie ty o f infra struc ture pro je c ts. Skille d in ma na g ing c o ntra c t a dministra tio n re q uire me nts o n ma jo r b ridg e , ro a dwa y, a nd limite d a c c e ss fa c ilitie s fo r o ve r 20 ye a rs.

So lic ita tio n R2114080P1 Co nstruc tio n Eng ine e ring I nsp e c tio n: Pe mb ro ke Rd fro m Dyke s Rd to Silve r Sho re s Blvd

slide-2
SLIDE 2

PINNACLE QUALIFICATIONS

Florida Department of Transportation

RICK SCOTT GOVERNOR

605 Suwannee Street Tallahassee, FL 32399-0450

MIKE DEW SECRETARY

www.fdot.gov July 14, 2017 Arturo Perez, President PINNACLE CONSULTING ENTERPRISES, INC. 6 Palermo Avenue Coral Gables, Florida 33134 Dear Mr. Perez: The Florida Department of Transportation has reviewed your application for qualification package and determined that the data submitted is adequate to technically qualify your firm for the following types of work: Group 10

  • Construction Engineering Inspection

10.1

  • Roadway Construction Engineering Inspection

10.3

  • Construction Materials Inspection

10.4

  • Minor Bridge & Miscellaneous Structures CEI

10.5.2 - Major Bridge CEI - Steel Your overhead audit has been accepted, enabling your firm to compete for Professional Services projects advertised at the unlimited level, with estimated fees of any dollar amount. This status shall be valid until June 30, 2018 for contracting purposes. Indirect Cost Field Office 111.63% Facilities Capital Cost

  • f Money

0.907% Overtime Premium Reimbursed Direct Expense 12.11% (Field)* *Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to provide field office. Should you have any questions, please feel free to contact me by email at carliayn.kell@dot.state.fl.us or by phone at 850-414-4597. Sincerely, Carliayn Kell Professional Services Qualification Administrator

slide-3
SLIDE 3

PINNACLE STAFF QUALIFICATIONS

slide-4
SLIDE 4

FDOT District 6 North Dade Residency Grouping Construction Cost: $210M FDOT District 6 SR 823/Red Road Construction Cost: $43M FDOT District 6 South Dixie Highway Construction Cost: $34M FDOT District 4 Hillsboro Boulevard Construction Cost: $9.4M FDOT District 6 West Flagler Street & 1st Street Construction Cost: $44M

URBAN RECONSTRUCTION

slide-5
SLIDE 5

FDOT District 6, Joint Participation Agreement with Miami Dade Water & Sewer SR 823/Red Road Reconstruction Utility Construction Cost: $10 M Scope: 10,400 LF of Bar Wrapped Concrete Cylinder Pipe WM, 300 LF of 36” Ductile Iron Pipe FDOT District 6, Joint Participation Agreement with Miami Dade Water & Sewer SR 5 / South Dixie Highway Reconstruction Utility Construction Cost: $3 M Scope: 6000 LF of 12” Ductile Iron Pipe Water Main FDOT District 6, Joint Participation Agreement with Miami Dade Water & Sewer SR 968 / West Flagler Street & SW 1st Street Reconstruction Utility Construction Cost: $6 M Scope: 7500 LF of 12” Ductile Iron Pipe Water Main & 500 LF of Sanitary Sewer FDOT District 6, Joint Participation Agreement with Miami Dade Water & Sewer LeJeune Road & US-1 Reconstruction Utility Construction Cost: $0.6 M Scope: 700 LF of 16” Ductile Iron Pipe Water Main Miami-Dade County, Joint Participation Agreement with Miami Dade Water & Sewer Swing Bridge Replacement Construction Cost: $ 1 M Scope: 900 LF of 30” HDPE Water Main Microtunnel under Tamiami Canal

WATER & SEWER

slide-6
SLIDE 6

➤ Senior Project Engineer: Edward “Doug” Schumann, P.E., M.S.

  • Managed over $50 Million worth of construction for FDOT with similar scope
  • Project Engineer for the $43 million Flagler Grouping Project for FDOT
  • Completed several projects which incorporate the Complete Streets Initiatives

➤ Project Engineer: Juan Medina Alfonso, P.E.

  • Over 31 years of Transportation Construction Industry Experience
  • Managed over $350 Million worth of FDOT & MDX Projects over the last 12 years

PROJECT STAFFING

slide-7
SLIDE 7

➤ Senior Inspector: Hector Aguilar

  • Over seven years of field experience on roadway construction projects
  • Senior Inspector for the $43 million Flagler Grouping Project for FDOT
  • Completed several projects of same scope of work

➤ Resident Compliance Specialist (RCS) / CEI Secretary: Maggie Rodriguez

  • Over nine years of RCS experience
  • Overseeing RCS team on FDOT LAP project Tamiami Canal Bridge Replacement

PROJECT STAFFING

slide-8
SLIDE 8
slide-9
SLIDE 9

PROJECT LOCATION

slide-10
SLIDE 10

➤ Pembroke Rd from Dykes Rd to Silver Shores Blvd

  • Roadway reconstruction and widening
  • Two 11-foot lanes in each direction
  • New median
  • Four-foot bike lanes
  • Six-foot sidewalk with new bus stop pads
  • Drainage and lighting improvements
  • Signalization upgrades at Pembroke Road and Dykes Road
  • Perimeter walls on each side of roadway
  • School zone safety improvements with overhead flashing beacon

SCOPE

slide-11
SLIDE 11
slide-12
SLIDE 12

PROJECT CHALLENGES

➤ Subsoil Excavation

  • Hold a pre-activity meeting to

establish contractor’s survey methods

  • Material will be investigated to

ensure no contamination is encountered

  • Check Contractor’s payments

 Station & offsets cross sections

with truck measured calculations

  • When water main and force main

are exposed:

 Notify utilities in advance of

  • perations

 Ensure proper equipment is on

site to support utilities if needed

slide-13
SLIDE 13

➤ Precast Concrete Privacy and Screen Wall System

  • Monitor construction of the leveling pad for correct elevations and offsets
  • Inspect panels for cracks, deformation, size, and material certifications
  • Verify coating numbers 1085 & 1088 against color wheels

PROJECT CHALLENGES

  • Ensure Contractor coordination with

FPL for overhead power lines

 Temporary de-energizing, service

re-routing, etc.

  • Verify Contractor obtains permits from

County and Cities

slide-14
SLIDE 14

➤ Utility Coordination

  • Coordination with FPL

 12 week advanced notice for de-energizing  If needed for signalization flashers and mast arms

  • Coordination with City of Pembroke Pines

 16 water and sewer valves

  • Coordination with City of Miramar

 9 water and sewer valves  2 manholes  1 fire hydrant

PROJECT CHALLENGES

slide-15
SLIDE 15

➤ Drainage Construction

  • Pre-activity meeting

 South Broward Drainage District (SBDD) & Contractor

  • Ensure submittals are reviewed in a timely manner by the EOR & SBDD
  • Review material of pipe
  • Check size of structure and invert size/placement at time of delivery
  • Check elevations of structures and slope of pipe at time of installation
  • Request inspections from SBDD

 SBDD plan note 5, pg 15

  • Request emergency action plan in case 16” water main is damaged

PROJECT CHALLENGES

slide-16
SLIDE 16

➤ Six phase Traffic Control Plan ➤ Driveway Access

  • Silver Shores Elementary School, Silver Shores Park, Silver Shores Community

➤ Daily inspection and night time inspections ➤ Pedestrian access is safe and clearly delineated

MAINTENANCE OF TRAFFIC

slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

➤ Ensure the roadway is safe and accessible by all users

  • Pre-construction walkthrough to evaluate pedestrian access
  • Recommend temporary bus stop locations & any additional bus stops
  • Discuss any ideas to with the Engineer of Record for implementation
  • Evaluate final configuration for bicycle lanes

COMPLETE STREETS INITIATIVE

slide-21
SLIDE 21

➤ Recommend to hold joint public meeting ➤ Recommend to have pre-construction meetings with:

  • Silver Shores Elementary (Bus Routes & Pedestrian Access)
  • Silver Shores Park
  • Surrounding Residential Communities
  • Notify Memorial Hospital Miramar & Emergency Services

➤ Provide residents timely notice regarding impacts to driveway access

PUBLIC INVOLVEMENT

slide-22
SLIDE 22

➤ Coordinate with Contractor for timely and accurate submission of estimate documents ➤ Assist the County with reimbursement documentation ➤ As-builts

  • Shall be submitted and certified by the EOR for paving and drainage (pg 15, note 7)
  • As-builts will be kept up top date throughout project

➤ Project documents will be kept up to date at all times ➤ Maintain all material testing records

COUNTY REIMBURSEMENTS & FINAL ACCEPTANCE

slide-23
SLIDE 23

T HANK YOU