rive r ro a d and ro se nda le ro a d i nte rse c tio n
play

Rive r Ro a d And Ro se nda le Ro a d I nte rse c tio n Pro je c t - PowerPoint PPT Presentation

Rive r Ro a d And Ro se nda le Ro a d I nte rse c tio n Pro je c t Pub lic I nfo rma tio n Me e ting Ag e nda I ntro duc tio ns Ba c kg ro und Pro je c t Ob je c tive s F e de ra l Aid Pro c e ss E xisting Co nditio ns


  1. Rive r Ro a d And Ro se nda le Ro a d I nte rse c tio n Pro je c t Pub lic I nfo rma tio n Me e ting

  2. Ag e nda • I ntro duc tio ns • Ba c kg ro und • Pro je c t Ob je c tive s • F e de ra l Aid Pro c e ss • E xisting Co nditio ns • Pro g re ss T o Da te • Alte rna tive s • Que stio n And Answe r

  3. Ove rvie w Mohawk River State Park

  4. Ba c kg ro und • L o c a l a nd Re g io na l Gro wth • 2013 - T o wn De ve lo pme nt Pla n • 2016 – Co unty F unding Applic a tio n • Spurre d By Co ng e stio n a nd Sa fe ty • 2017 – F e de ra l CMAQ F unding Awa rd • $1.94M; 20% Co unty Sha re “ What was de sig ne d fo r ho rse s and b ug g ie s no lo ng e r wo rks ”

  5. Pro je c t Ob je c tive s • Re duc e Mo to rist T ra ve l T ime • I mpro ve Sa fe ty And F unc tio na lity • Minimize I mpa c ts T o Priva te Pro pe rty • Avo id impa c ts T o T he Sta te Pa rkla nd • Me e t F e de ra l Re q uire me nts And Curre nt De sig n Sta nda rds

  6. Pro je c t Pro c e ss Project Data Feasible Review of Initiation Collection Alternatives Feasible alternatives Assemble Draft Public and Assess Recommend Design Approval Agency Agency/Public Preferred Documents Review Comments Alternative Final Design Design Detailed Design/ Approval Construction Approval ROW Acquisition Document

  7. Pro g re ss to Da te • Gro und Surve y • Co unty Hig hwa y Bo unda ry • E nviro nme nta l Sc re e ning s (E SA, SHPO, NYSDE C) • Cra sh Da ta - Co lle c te d/ Ana lyze d • T ra ffic Da ta • Re c o rde d E xisting • De ve lo pe d F uture Vo lume s (Ye a r 2039) • Re c o rde d E xisting Ve hic le Spe e ds

  8. E xisting Co nditio ns • Da ily T ra ffic Vo lume s • E xisting (2017): 12,000+ Ve hic le s • Pro je c te d (2039): 13,500+ Ve hic le s • Cra sh Ra te : 3 T ime s Ave ra g e • Appro a c h Spe e ds (Re c o rde d/ Po ste d ): • Rive r So uthb o und (48 mph/ 45 mph) • Ro se nda le E a stb o und (43 mph/ 35 mph) • Ro se nda le We stb o und (45 mph/ 35 mph) • Rive r Ro a d De la ys • Pa th Of L e a st Re sista nc e (Ane c do ta l E vide nc e ) • Na rro w Sho ulde rs

  9. Alte rna tive Ove rvie w • Do No t Me e t Ob je c tive s • Do No thing • Wa iting T ime I nc re a se s • Sa fe ty I ssue s Re ma in • All-wa y Sto p • Wa iting T ime I nc re a se s • Sa fe ty I ssue s Re ma in • Me e t the Ob je c tive s: • Alte rna tive 1 – T ra ffic Sig na l & T urn L a ne • Alte rna tive 2 – Sing le L a ne Ro unda b o ut • Alte rna tive 3 – T ra ffic Sig na l & Re a lig nme nt

  10. Alte rna tive 1 -Ne w T ra ffic Sig na l -Co nstruc t We stb o und Rig ht T urn la ne -Wide ne d Sho ulde rs -2 Pro pe rty I mpa c ts

  11. Alte rna tive 1- Me tric s • Rive r Ro a d Wa iting T ime : • Mo rning : 96% Re duc tio n • E ve ning : 91% Re duc tio n • E stima te d Pro pe rty I mpa c ts: • 2 Pa rc e ls I mpa c te d; .23 Ac re s • I mpro ve s Sa fe ty • Wide ne d Ro a dwa y Sho ulde rs • Do e s No t Ca lm T ra ffic • E stima te d Co st: $.950M T o $1.1M

  12. Alte rna tive 2 -Ne w Sing le L a ne Ro unda b o ut -Wide ne d Sho ulde rs -4 Pro pe rty I mpa c ts

  13. Alte rna tive 2 - Me tric s • Rive r Ro a d Wa iting T ime • Mo rning : 98% Re duc tio n • E ve ning : 97% Re duc tio n • E stima te d Pro pe rty I mpa c ts: • 4 Pro pe rtie s I mpa c te d; .40 Ac re s • I mpro ve s Sa fe ty • Wide ne d Ro a dwa y Sho ulde rs • Pro vide s T ra ffic Ca lming • E stima te d Co st: $1.5M T o $1.6M

  14. Alte rna tive 3 - Re a lig nme nt -Re a lig n Rive r a nd Ro se nda le Ro a ds -Ne w T ra ffic Sig na l -Wide ne d Sho ulde rs -3 Pro pe rty I mpa c ts

  15. Alte rna tive 3 • Rive r Ro a d Wa iting T ime • Mo rning : 94% Re duc tio n • E ve ning : 92% Re duc tio n • Pro pe rty I mpa c ts: • 3 Pro pe rtie s I mpa c te d; .32 Ac re s • I mpro ve s Sa fe ty • Wide ne d Ro a dwa y Sho ulde rs • Do e s No t Ca lm T ra ffic • E stima te d Co st: $1.5M T o $1.6M

  16. Co mpa riso n Cr ite r ia Alte r native 1 Alte r native 2 Alte r native 3 Re duc tio n in Wa iting Mo rning : 96% Mo rning : 98% Mo rning : 94% T ime a t I nte rse c tio n E ve ning : 91% E ve ning : 97% E ve ning : 92% E stima te d Pro pe rty 2 Pro pe rtie s 4 Pro pe rtie s 3 Pro pe rtie s I mpa c ts (.23 Ac re s) (.40 Ac re s) (.32 Ac re s) Sa fe ty I mpro ve me nt Ye s Ye s Ye s T ra ffic Ca lming No Ye s No E stima te d Co st $0.95M to $1.1M $1.5M to $1.6M $1.5M to 1.6M

  17. Sc he dule Mile stone / Ac tion Month Pub lic Me e ting F e b rua ry 2018 Se le c tio n o f Alte rna tive Spring 2018 De ta ile d De sig n a nd Rig ht-Of-Wa y Spring / Summe r 2018 Adve rtise fo r Bidding F a ll 2018 Co nstruc tio n Sta rt Spring 2019 Co nstruc tio n Co mple te Summe r 2019

  18. Pub lic Co mme nts • Optio ns • T o nig ht's Ope n F o rum • Co mme nt F o rms (E ma il Or Ma il) • Ple ase Submit All Comme nts By Mar c h 15th T ha nk yo u! County Contact: Paul Sheldon, P.E. Director of Engineering Schenectady County Phone: (518) 356‐5340 ext. 3234 Email: paul.sheldon@schenectadycounty.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend