Rive r Ro a d And Ro se nda le Ro a d I nte rse c tio n Pro je c t Pub lic I nfo rma tio n Me e ting Ag e nda I ntro duc tio ns Ba c kg ro und Pro je c t Ob je c tive s F e de ra l Aid Pro c e ss E xisting Co nditio ns


slide-1
SLIDE 1

Rive r Ro a d And Ro se nda le Ro a d I nte rse c tio n Pro je c t

Pub lic I nfo rma tio n Me e ting

slide-2
SLIDE 2

Ag e nda

  • I

ntro duc tio ns

  • Ba c kg ro und
  • Pro je c t Ob je c tive s
  • F

e de ra l Aid Pro c e ss

  • E

xisting Co nditio ns

  • Pro g re ss T
  • Da te
  • Alte rna tive s
  • Que stio n And Answe r
slide-3
SLIDE 3

Ove rvie w

Mohawk River State Park

slide-4
SLIDE 4

Ba c kg ro und

  • L
  • c a l a nd Re g io na l Gro wth
  • 2013 - T
  • wn De ve lo pme nt Pla n
  • 2016 – Co unty F

unding Applic a tio n

  • Spurre d By Co ng e stio n a nd Sa fe ty
  • 2017 – F

e de ra l CMAQ F unding Awa rd

  • $1.94M; 20% Co unty Sha re

“What was de sig ne d fo r ho rse s and b ug g ie s no lo ng e r wo rks”

slide-5
SLIDE 5

Pro je c t Ob je c tive s

  • Re duc e Mo to rist T

ra ve l T ime

  • I

mpro ve Sa fe ty And F unc tio na lity

  • Minimize I

mpa c ts T

  • Priva te Pro pe rty
  • Avo id impa c ts T
  • T

he Sta te Pa rkla nd

  • Me e t F

e de ra l Re q uire me nts And Curre nt De sig n Sta nda rds

slide-6
SLIDE 6

Pro je c t Pro c e ss

Project Initiation Data Collection Feasible Alternatives Review of Feasible alternatives Assemble Draft Design Approval Documents Public and Agency Review Assess Agency/Public Comments Recommend Preferred Alternative Final Design Approval Document Design Approval Detailed Design/ ROW Acquisition Construction

slide-7
SLIDE 7

Pro g re ss to Da te

  • Gro und Surve y
  • Co unty Hig hwa y Bo unda ry
  • E

nviro nme nta l Sc re e ning s (E SA, SHPO, NYSDE C)

  • Cra sh Da ta - Co lle c te d/ Ana lyze d
  • T

ra ffic Da ta

  • Re c o rde d E

xisting

  • De ve lo pe d F

uture Vo lume s (Ye a r 2039)

  • Re c o rde d E

xisting Ve hic le Spe e ds

slide-8
SLIDE 8

E xisting Co nditio ns

  • Da ily T

ra ffic Vo lume s

  • E

xisting (2017): 12,000+ Ve hic le s

  • Pro je c te d (2039): 13,500+ Ve hic le s
  • Cra sh Ra te : 3 T

ime s Ave ra g e

  • Appro a c h Spe e ds (Re c o rde d/ Po ste d ):
  • Rive r So uthb o und (48 mph/ 45 mph)
  • Ro se nda le E

a stb o und (43 mph/ 35 mph)

  • Ro se nda le We stb o und (45 mph/ 35 mph)
  • Rive r Ro a d De la ys
  • Pa th Of L

e a st Re sista nc e (Ane c do ta l E vide nc e )

  • Na rro w Sho ulde rs
slide-9
SLIDE 9

Alte rna tive Ove rvie w

  • Do No t Me e t Ob je c tive s
  • Do No thing
  • Wa iting T

ime I nc re a se s

  • Sa fe ty I

ssue s Re ma in

  • All-wa y Sto p
  • Wa iting T

ime I nc re a se s

  • Sa fe ty I

ssue s Re ma in

  • Me e t the Ob je c tive s:
  • Alte rna tive 1 – T

ra ffic Sig na l & T urn L a ne

  • Alte rna tive 2 – Sing le L

a ne Ro unda b o ut

  • Alte rna tive 3 – T

ra ffic Sig na l & Re a lig nme nt

slide-10
SLIDE 10

Alte rna tive 1

  • Ne w T

ra ffic Sig na l

  • Co nstruc t We stb o und Rig ht T

urn la ne

  • Wide ne d Sho ulde rs
  • 2 Pro pe rty I

mpa c ts

slide-11
SLIDE 11

Alte rna tive 1- Me tric s

  • Rive r Ro a d Wa iting T

ime :

  • Mo rning : 96% Re duc tio n
  • E

ve ning : 91% Re duc tio n

  • E

stima te d Pro pe rty I mpa c ts:

  • 2 Pa rc e ls I

mpa c te d; .23 Ac re s

  • I

mpro ve s Sa fe ty

  • Wide ne d Ro a dwa y Sho ulde rs
  • Do e s No t Ca lm T

ra ffic

  • E

stima te d Co st: $.950M T

  • $1.1M
slide-12
SLIDE 12

Alte rna tive 2

  • Ne w Sing le L

a ne Ro unda b o ut

  • Wide ne d Sho ulde rs
  • 4 Pro pe rty I

mpa c ts

slide-13
SLIDE 13

Alte rna tive 2 - Me tric s

  • Rive r Ro a d Wa iting T

ime

  • Mo rning : 98% Re duc tio n
  • E

ve ning : 97% Re duc tio n

  • E

stima te d Pro pe rty I mpa c ts:

  • 4 Pro pe rtie s I

mpa c te d; .40 Ac re s

  • I

mpro ve s Sa fe ty

  • Wide ne d Ro a dwa y Sho ulde rs
  • Pro vide s T

ra ffic Ca lming

  • E

stima te d Co st: $1.5M T

  • $1.6M
slide-14
SLIDE 14

Alte rna tive 3 - Re a lig nme nt

  • Re a lig n Rive r a nd Ro se nda le Ro a ds
  • Ne w T

ra ffic Sig na l

  • Wide ne d Sho ulde rs
  • 3 Pro pe rty I

mpa c ts

slide-15
SLIDE 15

Alte rna tive 3

  • Rive r Ro a d Wa iting T

ime

  • Mo rning : 94% Re duc tio n
  • E

ve ning : 92% Re duc tio n

  • Pro pe rty I

mpa c ts:

  • 3 Pro pe rtie s I

mpa c te d; .32 Ac re s

  • I

mpro ve s Sa fe ty

  • Wide ne d Ro a dwa y Sho ulde rs
  • Do e s No t Ca lm T

ra ffic

  • E

stima te d Co st: $1.5M T

  • $1.6M
slide-16
SLIDE 16

Co mpa riso n

Cr ite r ia Alte r native 1 Alte r native 2 Alte r native 3 Re duc tio n in Wa iting T ime a t I nte rse c tio n Mo rning : 96% E ve ning : 91% Mo rning : 98% E ve ning : 97% Mo rning : 94% E ve ning : 92% E stima te d Pro pe rty I mpa c ts 2 Pro pe rtie s (.23 Ac re s) 4 Pro pe rtie s (.40 Ac re s) 3 Pro pe rtie s (.32 Ac re s) Sa fe ty I mpro ve me nt Ye s Ye s Ye s T ra ffic Ca lming No Ye s No E stima te d Co st $0.95M to $1.1M $1.5M to $1.6M $1.5M to 1.6M

slide-17
SLIDE 17

Sc he dule

Mile stone / Ac tion Month

Pub lic Me e ting F e b rua ry 2018 Se le c tio n o f Alte rna tive Spring 2018 De ta ile d De sig n a nd Rig ht-Of-Wa y Spring / Summe r 2018 Adve rtise fo r Bidding F a ll 2018 Co nstruc tio n Sta rt Spring 2019 Co nstruc tio n Co mple te Summe r 2019

slide-18
SLIDE 18

Pub lic Co mme nts

  • Optio ns
  • T
  • nig ht's Ope n F
  • rum
  • Co mme nt F
  • rms (E

ma il Or Ma il)

  • Ple ase Submit All Comme nts By Mar

c h 15th

T ha nk yo u!

County Contact: Paul Sheldon, P.E. Director of Engineering Schenectady County Phone: (518) 356‐5340 ext. 3234 Email: paul.sheldon@schenectadycounty.com