WARD 6 RESISTAT M AYO R J O E C U RTATO N E WA R D 6 A L D E R - - PowerPoint PPT Presentation

ward 6 resistat
SMART_READER_LITE
LIVE PREVIEW

WARD 6 RESISTAT M AYO R J O E C U RTATO N E WA R D 6 A L D E R - - PowerPoint PPT Presentation

WARD 6 RESISTAT M AYO R J O E C U RTATO N E WA R D 6 A L D E R M A N L A N C E DAV I S Is It Just Me Or Is There More Construction Than Usual? Linear Feet of City Construction 14000 Large Diameter Sewer/Drain Small Diameter


slide-1
SLIDE 1

WARD 6 RESISTAT

M AYO R J O E C U RTATO N E WA R D 6 A L D E R M A N L A N C E DAV I S

slide-2
SLIDE 2

Is It Just Me Or Is There More Construction Than Usual?

2000 4000 6000 8000 10000 12000 14000 2015 2016 2017 2018

Large Diameter Sewer/Drain Small Diameter Sewer/Drain Water Main Replacement Water Main Clean & Line Streetscape Sewer/Drain Rehbilitation

Linear Feet of City Construction

This does not include work done by utility companies or for the Green Line Extension.

slide-3
SLIDE 3
slide-4
SLIDE 4

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

Somerville is an old city, with some old infrastructure.

200 400 600 800 1000 1200 1400

Water & Sewer Pipes Installed Per 20 Years Some infrastructure work has been kicked down the road. We would need to do this work now, regardless of anything else happening in Somerville.

slide-5
SLIDE 5

S O M E RV I L L E U N D E R C O N S T RU C T I O N

Knowing there are a lot of infrastructure needs to be addressed, we’ve gone after a variety of funding sources to help with the cost.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help? Source T

  • tal (since FY04)

Housing and Urban Development $9.7 million Metropolitan Planning Organization (transit) $65.1 million State and Federal Grants $21.7 million Massachusetts School Building Authority $48.3 million Chapter 90 (streets and sidewalks) $15 million $159.7 million

slide-6
SLIDE 6

S O M E RV I L L E U N D E R C O N S T RU C T I O N

Collecting data about the conditions of our buildings, roads, and sidewalks will help us better prioritize future work and invest in less expensive, less disruptive preventive maintenance.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

Base rehabilitation

  • f a road

costs nearly 7 times more than preventive maintenance.

slide-7
SLIDE 7

S O M E RV I L L E U N D E R C O N S T RU C T I O N

Although many of these infrastructure projects would need to happen anyway, they also help reach Somerville’s SomerVision goals.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

Housing

Goal Progress as of July 1, 2018 % Housing Units 6,000 1,743 29%

Affordable Housing Units

1,200 363 30% Commercial Space (square footage) 7.8 million 1.7 million 22% New Jobs 30,000 6,517 22% New Useable Open Space (acres) 125 17 14%

slide-8
SLIDE 8

S O M E RV I L L E U N D E R C O N S T RU C T I O N

We reevaluate these goals as time goes on and use new data to shape priorities.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

Housing

Goals & Priorities

Vision Zero SomerVision Somerville Climate Forward Open Space Master Plan Neighborhood Plans Sustainable Neighborhoods

Get SomerVision updates at somervillema.gov/somervision

slide-9
SLIDE 9

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

  • Before work starts, projects teams

look at issues like traffic and noise.

  • They need to balance mitigating

impacts to residents and businesses with completing projects on time and within budget.

slide-10
SLIDE 10

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • We’ve set up a central email address for any construction

concerns or questions: – construction@somervillema.gov

  • Get updates through our construction newsletter

– Email construction@somervillema.gov and ask to be put on the list

  • Three new positions were created to help get construction

information out and to address resident and business owner concerns:

– Erica Mace, Construction Public Information Officer – Jesse Moos, Construction Liaison and Compliance Manager – Viola Augustin, GLX Project Liaison

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

slide-11
SLIDE 11

RO D E N T R E P O RT S

We monitor 311 data and target rodent control resources based

  • n constituent reports.

We know that weather changes and proper waste management can affect the number of rodent sightings. 521 733 721 450 348 594 622 560

100 200 300 400 500 600 700 800 2011 2012 2013 2014 2015 2016 2017 2018* T

  • tal 311 Rat Calls

Rat Sightings Reported to Somerville 311

Mild winter

* 2018 data is through October 21

New trash initiatives Mild winter

slide-12
SLIDE 12

T R AC K I N G C H A N G E

This map shows areas where rat reports have increased in 2018 compared to 2017. The data aren’t perfect, but they can give indications of problem areas. ISD is coordinating with the MBTA and SHA to address a known problem area in Ward 2.

Known issue with MBTA and SHA

slide-13
SLIDE 13

E N H A N C I N G O U R RO D E N T C O N T RO L TO O L K I T I N 2 0 1 8

We conducted a baseline assessment of rodent activity at major construction projects. We funded a new staff position, the Environmental Health Coordinator, devoted to rodent control. Hiring is in process.

  • Dr. Corrigan and Mayor Curtatone discuss

rodent control along Somerville Ave.

  • Dr. Corrigan with GLX staff assessing rodent

conditions in the rail corridor

slide-14
SLIDE 14

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • 84% of businesses in the Boston metro area have

fewer than 20 employees. Small businesses are a BIG part of our economy.

  • A New

York City study found that businesses in areas

  • f streetscape improvements had in increase in sales

(up to 50%).

  • Despite later benefits, construction can be tough on

small businesses. Some local businesses have reported losing between 20% and 50% of business when there’s construction nearby.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

slide-15
SLIDE 15

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • Economic

Development does targeted outreach to businesses in construction areas.

  • We’ve holding

events to bring people into affected neighborhoods and introduce them to local businesses.

  • New assistance

programs and Loyal 2 Local campaign to help businesses weather construction.

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

slide-16
SLIDE 16

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • Ultimately, local businesses need

customer support:

– Patronize them and encourage others to do the same – Use the #Loyal2Local hashtag on social media to spread awareness and remind others that businesses are open – Go to events in different squares and business districts – If you can, park farther away or use public transportation so that nearby spaces are available to those who need them most

  • Why now?
  • How does this work fit

with the Somerville community’s values?

  • Living through

construction

  • What about small

businesses? Is there anything I can do to help?

slide-17
SLIDE 17

P R O J E C T S I N A N D A R O U N D WA R D 6

slide-18
SLIDE 18

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge
  • Closing mid-November
  • T

emporary location at the TAB, 167 Holland St.

  • Project updates:

bit.ly/SomervilleWestBranch

  • Library info: somervillepubliclibrary.org
slide-19
SLIDE 19

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge
  • Being paved to a useable condition for

the winter

  • Final work will take place in Spring 2019
  • Updates: bit.ly/SomervillePath
slide-20
SLIDE 20

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Davis Square Intersection Changes:

  • Changes made to signal

timing – June 2018

  • Adjustments to timing –

July 2018

  • More time to College

Avenue

  • “Yield” pavement

markings and red curb extension markings – August 2018

  • Yield to Pedestrians signs:

September 2018

slide-21
SLIDE 21

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge
  • Walk signals now concurrent with adjacent

vehicle phases

  • Shorter overall cycle length – better for all

users

  • 130 or 155 seconds  100 seconds
  • Walk signals come up 8 times more each

hour

  • 30% increase in frequency
  • Allow pedestrians to cross multiple

crosswalks more quickly

  • Some undesirable pedestrian-vehicle

conflicts

  • Across Elm at Day Street, across Dover

Street

  • Busway gets green light 8 times more each

hour

  • Noted improvements in bus service after

signal timing changes

slide-22
SLIDE 22

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Davis Square Signal Timing Changes: August 2017 vs. August 2018

50 70 90 110 130 150 170 190 210

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0

90th Percentile Run Time Holland/Dover - Elm/Chester After College/Highland - Elm/Chester After Holland/Dover - Elm/Chester Before College/Highland - Elm/Chester Before

slide-23
SLIDE 23

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Davis Square Timeline:

  • 2018 – Short-term signal timing changes

(complete)

  • 2019/2020 – Equipment upgrades
  • Updated signal controller to allow

more phases

  • Remove undesirable

pedestrian/vehicle conflicts

  • Audible signal indications
  • 2023 or later – Four-way intersection

redesign

  • As shown in draft Davis Square

Neighborhood Plan

  • Will need lots of additional study and
  • utreach – stay tuned
slide-24
SLIDE 24

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Ball Square Neighborhood Safety Zone

slide-25
SLIDE 25

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Morrison Avenue Considerations (West of Willow)

  • Consider flipping parking spaces to

force vehicles to deflect

  • Reduces vehicle speeds
slide-26
SLIDE 26

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Morrison Avenue Considerations

  • Consider flipping parking spaces to

force vehicles to deflect

  • Reduces vehicle speeds
slide-27
SLIDE 27

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Bluebikes Expansion

  • One new station in Ward 6
  • Grove St./Community Path

1000 2000 3000 4000 5000 6000 7000 2017 2018

Bluebikes Starting Trips

Aug-Oct 2017 vs. Aug-Oct 2018

Grove St at Community Path Davis Square

slide-28
SLIDE 28

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Bluebikes Expansion

  • Nine new stations overall
  • 10,000 more trips staring in Somerville in

Aug-Oct 2018 over same period in 2017 (+50% increase)

slide-29
SLIDE 29

G L X O U T R E AC H & E N G AG E M E N T: 2 0 1 8 C A L E N DA R

slide-30
SLIDE 30

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Scheduled to be closed January 2019 – January 2020

slide-31
SLIDE 31

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Potential Vehicle Detours

slide-32
SLIDE 32

S O M E RV I L L E U N D E R C O N S T RU C T I O N

  • West Branch Library
  • Community Path
  • Davis Square

Intersection and Signal Timing

  • Neighborhood Safety

Zone

  • Bluebikes
  • Green Line Extension
  • Broadway Bridge

Potential Pedestrian and Bike Detours

slide-33
SLIDE 33
slide-34
SLIDE 34

WA R D 6 : R E C E N T C A P I TA L I N V E S T M E N T

Kenney Park Reconstruction Community Path Re-Paving (Grove-Cedar) Highland Avenue Pavement / Sidewalk / Bike Lanes 45 College Avenue Acquisition Traffic Signal Modifications Cutter Avenue Bike Lane Community Path Drainage West Branch Library Reconstruction Start

2014 2015 2016 2017 2018 2019

slide-35
SLIDE 35

DAV I S S Q UA R E : I N T E R I M C A P I TA L R E PA I R S

Seven Hills Park Soil Restoration & Grass Seeding Elm / Holland Tree Planting Elm Street / Cutter Square Interim Sidewalks Prepare Bid Package for Contractor to Reset Granite Curbs and Construct ADA- Compliant Sidewalks as Interim Upgrades Perform Interim Upgrades

Fall 2018 Winter 18-19 Summer 2019

slide-36
SLIDE 36

P U B L I C S A F E T Y D U R I N G C O N S T RU C T I O N

Police, Fire, and Cataldo Ambulance are part of construction planning. Each public safety branch weighs in on detours and how they could affect response time and looks at

  • ptions for mutual aid
  • r shifting resources.
slide-37
SLIDE 37

P U B L I C S A F E T Y D U R I N G C O N S T RU C T I O N

Police, Fire, and Cataldo Ambulance are part of construction planning. Each public safety branch weighs in on detours and how they could affect response time and looks at

  • ptions for mutual aid
  • r shifting resources.
slide-38
SLIDE 38

ResiStat Ward 6: Police November 1, 2018

Chief David Fallon

slide-39
SLIDE 39

Crime Trends (10/1/17 – 9/30/18)

Citywide, index crime is down 2% over two years; violent crime is down 18%.

2018 is projected to be a 32-year citywide low, a 69% decrease vs. 1987

Ward 6: Over the past 12 months, index crime has decreased 4%. Crime Prevention:

  • Residential Burglary
  • Lock deadbolts (not just door knob)
  • Double-secure windows (lock + safety tabs, wooden

dowel or wood screws)

  • Car Breaks
  • Always lock your vehicle

Ward 6 Crime

Ward 6 Select Crime (May - Sept)

slide-40
SLIDE 40

21st Century Policing: 6 Pillars

Officer Devin Schneider participating in a walking dialogue with a T een Empowerment member

1.

Building Trust and Legitimacy

 Focus on Procedural Justice  Community relationship building (Walking Dialogues, STEPS,

Jr Police Academy)

2.

Policy and Oversight

 Fully transparent policies and procedures (all accessible

  • nline)

 Certified and working towards Accreditation

3.

T echnology and Social Media

 Social media platforms to enhance communication and

awareness

 https://www.facebook.com/SomervillePolice/  IG: @somervillepolice  T

witter: @somervillePD

 SPD Website redesign

slide-41
SLIDE 41

4) Community Policing and Crime Reduction

Awarded the 2018 Community Policing Award for the category of over 50,000 population

The Center for Teen Empowerment’s program and partnership SPD will be featured in the National Law Enforcement Museum’s inaugural temporary exhibition (Washington D.C.)

21st Century Policing: 6 Pillars

5) Training and Education

Impartial Policing Training

Procedural Justice & Legitimacy Training

COHR

 Regional Crisis Intervention Training (CIT)  Advanced Training, (Communication with Parents; Motivational Interviewing; Tactical /

Verbal Skills and Risk Assessment)

 Community Training (Recovery Coach Academy, Mental Health First Aid, Youth Mental

Health First Aid)

6) Officer Wellness and Safety

Blue Courage Training

slide-42
SLIDE 42

Substance Misuse & Mental Health Supports

Contact Service Contact Info. MA Substance Use Hotline Treatment program info 800-327-5050 Cambridge Health Alliance Walk-ins Tue. 11:30; MA Health accepted 617-591-6051 Caspar First Step Outreach Assist in accessing detox. 617-661-0600 Riverside Community Care Outpatient; MA Health accepted 617-623-3278 North Charles Maintenance therapy; MA Health only 617-661-5700 Column Health Counseling, medication assisted treatment 339-368-7696 Learn 2 Cope Family support; Mon. 7 PM 1575 Cambridge St, CAM Family Anonymous Family support; Tue. 7 PM 121 Washington St, MEF Contact Service Contact Info. Cambridge Health Alliance Inpatient & outpatient services Adults: 617-591-6033 Juveniles: 617-665-3458 BEST T eam Psychiatric emergency services; MA Health 800-981-4357 Riverside – Child Guidance Center Juvenile/family services 617-354-2275 Neighborhood Counseling & Community Services Counseling, skill & strength-based strategies 781-600-6074

  • Substance Misuse
  • Mental Health