Broward County, FL Shore Protection Project, Segment III

Solicitation T2112588P1 Coastal Engineering Consultant Services August 16, 2017

slide-2
SLIDE 2

Presentation Overview

I. What sets the GBA Team apart

  • II. Project approach
  • III. Experience addressing hardbottom impacts
  • IV. Key team members
  • V. Regulatory permitting
slide-3
SLIDE 3

The GBA Team – What Sets Us Apart

  • Fresh perspective
  • Industry leaders
  • Independent assessment of work conducted to date
  • Practicable solutions to save the County time and

money

slide-4
SLIDE 4

Project History Leading to Approach

2005/06 Project 1999 Applications submitted 2003 Permits issued 2005/06 Construction 2011 Biological monitoring complete 2014 USACE reimbursement $18.3M

  • Reduce permitting duration
  • Avoid/minimize hardbottom

impacts

  • Reduce project soft costs
  • Maximize project performance
slide-5
SLIDE 5

Project Approach

Client Meeting & Site Visit Historical Data & Permits Field Investigations

(Surveys, Geotechnical Investigations, & Environmental Resource Surveys)

slide-6
SLIDE 6

Project Approach

Field Investigations

(Surveys, Geotechnical Investigations, & Environmental Resource Surveys)

Client, Agency, & Stakeholder Coordination Permitting Engineering Analysis & Design

slide-7
SLIDE 7

Project Approach

Engineering Analysis & Design Construction Management Post-Construction Monitoring

slide-8
SLIDE 8

Segment III – Evaluate Non-Federal Project

  • Greater uncertainty in future federal funding –

no guarantee of reimbursement

  • Greatly reduce time to construction
  • Easier to import Bahamian sand
  • Reduced traffic impacts
  • Higher quality sand
  • Larger hopper dredges entering U.S. fleet
  • Consideration of foreign sand may trigger

industry competition

  • Cost share regional EIS with Miami-Dade

County

  • Evaluate design/build project delivery
slide-9
SLIDE 9

111 miles

90 miles

slide-10
SLIDE 10

Hardbottom/ETOF Planning Experience

  • Hillsboro Beach, FL
  • Hollywood Beach, FL
  • Hallandale Beach, FL
  • Broward County Segment II, FL
  • Jupiter Island, FL
  • Martin County, FL
  • Key Biscayne ETOF Analysis, FL
  • Wrightsville Beach Studies, NC
  • Sconset Beach, MA
slide-11
SLIDE 11

Hardbottom Monitoring Experience

  • 115 hardbottom/coral relocation projects in SE Florida
  • 17 projects in Broward
  • Multiple Acropora cervicornis surveys & relocations
slide-12
SLIDE 12

Hardbottom Monitoring Experience

Hardbottom Monitoring for the Hillsboro/Deerfield Beach Nourishment Project

  • Pre-, Mid-, and Post-Construction monitoring surveys

conducted 2010 to 2015

  • 20 monitoring surveys, 350 dives, 360 hours of bottom time
  • Monitoring included:
  • Percent cover estimates
  • Sediment depth measurements
  • Coral health assessments
slide-13
SLIDE 13

Hardbottom Mitigation Experience

  • Multiple UMAM/HEA assessments of nearshore

hardbottom & coral communities in SE Florida (including Hollywood)

  • Siting and monitoring of shallow-water mitigation reefs

(St. Lucie & Palm Beach Counties)

  • Leader in coral relocation in SE Florida:
  • 50+ projects from Hillsboro to Key West
  • 200+ years collective staff experience
slide-14
SLIDE 14

Hardbottom Assessment Innovations

  • Environmental Data & Geospatial Services (EDGS)
  • EDGSonline 2.0
  • FMVsea
  • SHARK Marine Technologies, Inc. Navigator
  • 3D mapping technology
  • MIKE/Delft Model capability for ETOF predictions
  • Suite of remote sensing tools to save time and

money

  • Geoportals for online access
slide-15
SLIDE 15

Key Team Members – GBA

Permitting, Engineering Design, Surveying, & Geotechnical Studies

  • Project Manager – Penny Cutt
  • Former federal, state, county regulator
  • 23 years public and private sector
  • Broward County Segment I & III experience
  • Project Oversight and QA/QC – Clay Bryant, P.E.
  • 30+ years experience coastal engineering projects
  • Expertise in ETOF prediction adjacent to hardbottom
  • Federal and state permitting and funding
  • Coastal Engineer – Kevin Kremkau, P.E.
  • 20+ years experience coastal engineering projects
  • ETOF and template designs adjacent to hardbottom
  • Construction management & project compliance
  • Coastal Geologist - Jonathan Barker, P.G.
  • 16 years experience coastal geology & geomorphology
  • Borrow area development
  • Sand compatibility analysis in south Florida
slide-16
SLIDE 16

Key Team Members – CSA

Biological Assessments & Monitoring

  • Marine Biologist - Erin Hodel
  • 14 years experience
  • Chief scientist, project manager, field scientist
  • Hardbottom, coral relocation & Acropora specialist
  • Segment III experience
  • Marine Ecologist - Mark Fonseca, Ph.D.
  • 30+ years experience (25 years at NOAA)
  • Director of Science
  • Ecosystem restoration and management
  • Mitigation specialist (HEA and UMAM)
  • Marine Biologist - Keith Spring
  • 36 years experience
  • Chief scientist, project manager
  • Hardbottom, coral reef restoration & Acropora specialist
  • Marine Biologist - David Snyder
  • 29 years experience
  • Icthyologist & marine ecologist
  • Hardbottom & Essential Fish Habitat (EFH) specialist
slide-17
SLIDE 17

Key Team Members – M&N

Structure Design & Numerical Modeling

  • Coastal Engineer - Timothy Blankenship, P.E.
  • 20+ years experience coastal engineer
  • Broward County Segment I & III experience
  • Engineer of Record for Hollywood, Hallandale, &

Hillsboro beach nourishment projects

  • Engineer of Record for Hillsboro Inlet
  • Coastal Engineer – Santiago Alfageme, P.E.
  • 20+ years experience coastal engineer
  • Numerical models include: Delft3D, MIKE3, MIKE21,

ADCIRC, RMA-2, RMA-4, ADDAMS, REFDIF, CGWAVE, SBEACH,& GENISIS

  • Extensive Federal experience
  • Coastal Modeling – Yong Chen, P.E., Ph.D., P.E.
  • Hollywood Beach Nourishment
  • Hallandale Beach Nourishment
  • Hillsboro/Deerfield Beach Restoration
slide-18
SLIDE 18

Key Team Members – Baird

Engineering QA/QC & Federal Agreements

  • Coastal Engineer – Gordon Thomson, P.E., D.CE
  • 17+ years experience
  • Project manager for >$250M in total construction costs

with placement of over 20 MCY of material

  • Broward County Segment II & III experience
  • Broward County Beach Demonstration Project
  • Coastal Engineer - Robert Nairn, Ph.D. P.E.
  • 30 years experience
  • Hydrodynamics, sediment transport, & scour processes
  • Numerical modeling
  • Coastal Engineer - John Headland, P.E., D.C.E
  • 35+ years as port, ocean, coastal, & hydraulic engineer
  • Extensive Federal experience
  • Previous member of CERB
slide-19
SLIDE 19

Professional Staff

GBA Team Professional Resources GBA M&N Baird CSA Total P.E. 12 214 28 ‐ 254 Ph.D. ‐ 23 9 5 37 P.G. 1 ‐ ‐ ‐ 1 P.L.S./P.S.M. 6 ‐ ‐ ‐ 6 C.H. 4 ‐ ‐ ‐ 4 Marine Biologists 4 ‐ ‐ 30 34

slide-20
SLIDE 20

Nearshore Hardbottom Permitting Examples

GBA

  • Town of Jupiter Island – FDEP & USACE since 1976
  • St. Lucie Inlet – FDEP & USACE since 2001
  • Pinellas County – FDEP & USACE permitting

Key Team Members

  • Hillsboro Beach – FDEP, USACE, & Broward EPD
  • Hillsboro Inlet – FDEP, USACE, & Broward EPD
  • Hollywood – FDEP, USACE, & Broward EPD
  • Hallandale Beach – FDEP, USACE, & Broward EPD
  • Town of Palm Beach Reach 8 – FDEP & USACE
  • Town of Palm Beach Reach 7 – SEIS & USACE Permit
  • South End Palm Beach EIS – DEIS & EIS review

Before After

slide-21
SLIDE 21

Regulatory Permitting & Funding

  • Excellent relationships with federal, state, & local

regulators

  • Collaborative permitting coordination & application

assistance

  • Thorough understanding of regulatory permitting

process

  • Comprehensive knowledge of NEPA process to

include EIS preparation

  • Extensive track record securing Category G

Reimbursement funds

  • Effective Beach Management Funding Assistance

Program application and processing

  • Successful grant application & processing
slide-22
SLIDE 22

The GBA Team Advantage

  • Fresh perspective
  • Industry leaders
  • Independent assessment of work conducted to date
  • Practicable solutions to save the County time and

money