11/13/2015 PERMANENT CLASSROOM ANALYSIS AMERICAN HS ATTENDANCE AREA - PDF document

11/13/2015 PERMANENT CLASSROOM ANALYSIS AMERICAN HS ATTENDANCE AREA TO ADDRESS ENROLLMENT PROJECTIONS School Site Unit Costs Brookvale ES Oliveira ES Patterson ES Warwick ES American HS Number of Classrooms 8 10 8 8 8 Number of Science


  1. 11/13/2015 PERMANENT CLASSROOM ANALYSIS AMERICAN HS ATTENDANCE AREA TO ADDRESS ENROLLMENT PROJECTIONS School Site Unit Costs Brookvale ES Oliveira ES Patterson ES Warwick ES American HS Number of Classrooms 8 10 8 8 8 Number of Science Labs/Elective CR 0 2 0 0 10 General Classroom $ 580,000 $ 4,640,000 $ 5,800,000 $ 4,640,000 $ 4,640,000 $ 4,640,000 Science Lab $ 750,000 $ ‐ $ 1,500,000 $ ‐ $ ‐ $ 7,500,000 Elevator $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 Restrooms $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 Play Structure $ 60,000 $ 60,000 $ 60,000 Parking Lot $ 500,000 21st Century Learning Flexibility (Furniture) $ 11,000 $ 88,000 $ 132,000 $ 88,000 $ 88,000 $ 198,000 Escalation $ 277,400 $ 390,600 $ 255,400 $ 252,400 $ 632,900 Total Construction Cost $ 5,825,400 $ 8,202,600 $ 5,363,400 $ 5,300,400 $ 13,290,900 $ 1,922,382 $ 2,706,858 $ 1,769,922 $ 1,749,132 $ 4,385,997 Soft Costs: Design, Inspect, Mgmt, etc. Total Project Cost $ 7,747,782 $ 10,909,458 $ 7,133,322 $ 7,049,532 $ 17,676,897 School Site Brookvale ES Oliveira ES Patterson ES Warwick ES American HS Current Capacity 662 732 600 872 2193 Additional Spaces @ 26/CR 208 260 208 208 468 Total Future Capacity 870 992 808 1080 2661 1 PERMANENT CLASSROOM ANALYSIS NILES ES TO ADDRESS ENROLLMENT PROJECTIONS School Site Unit Costs Niles ES Number of General Classrooms 8 Number of Science Labs/Elective CR 0 Niles ES Challenges: General Classroom $ 580,000 $ 4,640,000 Seismic Study Zone Science Lab $ 750,000 $ ‐ • Architectural design should Elevator $ 120,000 $ 120,000 • Restrooms $ 200,000 $ 200,000 match the existing structure Play Structure Will not complete August 2016 • 21st Century Learning Flexibility (Furniture) $ 11,000 $ 88,000 Escalation $ 252,400 Total Construction Cost $ 5,300,400 Soft Costs: Design, Inspect, Mgmt, etc. $ 1,749,132 Total Project Cost $ 7,049,532 School Site Niles ES Current Capacity 606 Additional Spaces @ 26/CR 208 Total Future Capacity 814 2 1

  2. 11/13/2015 RECOMMENDATION AMERICAN HS ATTENDANCE AREA PERMANENT CONSTRUCTION School Site Unit Costs Brookvale ES Patterson ES American HS TOTAL Number of Classrooms 8 8 8 24 Number of Science Labs/Elective CR 0 0 10 10 General Classroom $ 580,000 $ 4,640,000 $ 4,640,000 $ 4,640,000 $ 13,920,000 Science Lab $ 750,000 $ ‐ $ ‐ $ 7,500,000 $ 7,500,000 Elevator $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 360,000 Restrooms $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 600,000 Play Structure $ 60,000 $ 60,000 $ 60,000 Parking Lot $ 500,000 $ 500,000 21st Century Learning Flexibility (Furniture) $ 11,000 $ 88,000 $ 88,000 $ 198,000 $ 374,000 Escalation $ 277,400 $ 255,400 $ 632,900 $ 1,165,700 Total Construction Cost $ 5,825,400 $ 5,363,400 $ 13,290,900 $ 24,479,700 Soft Costs: Design, Inspect, Mgmt, etc. $ 1,922,382 $ 1,769,922 $ 4,385,997 $ 8,078,301 Total Project Cost $ 7,747,782 $ 7,133,322 $ 17,676,897 $ 32,558,001 Total Future Capacity 870 808 2,661 3 BROOKVALE ES, PATTERSON ES, AMERICAN HS SCHEDULE 2015 2016 2017 BROOKVALE, PATTERSON ES O N D J F M A M J J A S O N D J F M A M J Q4 Q1 Q2 Q3 Q4 Q1 Q2 8 General Classrooms, 2 Story Building Board Approve Project, Fund allocation, Design Build Resolution 11/18/15 Assessment Board Approve Design Builder 1/13/16 Design Builder Procurement Design DSA Review/Approval Construction Closeout 2015 2016 2017 AMERICAN HS (Phase 1) O N D J F M A M J J A S O N D J F M A M J 2 2 Story Buildings Q4 Q1 Q2 Q3 Q4 Q1 Q2 10 General Classrooms, 2 SL Assessment Design Builder Procurement Design DSA Review/Approval Construction Closeout Design Builder Assessment Design DSA CEQA: Procurement Two Story Building Pre DSA Meeting ES: CE ‐ 30 Days Pre Design Phase Review and Approval HS: MND ‐ 90 Days Design Build Pre Fab Allow Site work to start Geotechnical RFQ/P ‐ 30 Days Componentized Building System prior to Stamp Out Soils DSA History Elementary Schools(April 2016) HazMat(Phase 1) American HS(July 2016) Survey Topographic/Underground Utilities 4 2

  3. 11/13/2015 SUMMARY Brookvale, Patterson ES Total 16 new General Classrooms • Will address the enrollment growth at ES in the American HS attendance • Completion date - August 2016 • American HS (Phase 1) 10 Science Laboratory (align with LRFP) • 8 General Classrooms • Serve as temporary housing for HVAC project in lieu of 14 Temporary • Portables - a savings of approximately $1,500,000 Completion date - December 2016 • 5 Brookvale ES Site Plan Location: East of Campus 8 General Classrooms – 2 Story Building • Existing P1,P2 Buildings: • Keep for immediate Administration space needs. Day Care: Future relocation to • front of school site(off campus) 6 3

  4. 11/13/2015 Patterson ES Site Plan Option 2 Location Option 1 Location 2 Story Building Southwest Corner of Campus Northwest corner of Campus(Current • • 8 General Classrooms, (current location of Child Care) Vandal Watch property location) Relocate Child Care Bldg to Remove Vandal Watch Property By • • Northwest front corner of March 2016 campus. (off campus) Replace Kinder Play Structure • 7 American HS Site Plan (Phase 1) Location: Southeast corner of • Two 2 Story Buildings Campus(Corner of Fremont 8 General Classrooms, 10 Science Labs Blvd. and Alder Ave. Meet LRFMP Science Labs • Requirement Use for HVAC Project • Temporary Housing Save Approx. $1.5M • Complete December 2016 • HVAC Project Completion • delayed one semester Permanent Classrooms for • forecasted growth 8 4

  5. 11/13/2015 QUESTIONS 9 5

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.