Water Treatment Facility
Public Involvement Meeting – NTC W ausau, WI March 6, 2019
Water Treatment Facility Public Involvement Meeting NTC W ausau, - - PowerPoint PPT Presentation
Water Treatment Facility Public Involvement Meeting NTC W ausau, WI March 6, 2019 Upgrade Aging Infrastructure Meter Shop 1961 (58 years old) 1974 (45 years old) 1984 (35 years old) 1999 (20 years old) | 9 | Improve Water Quality
Public Involvement Meeting – NTC W ausau, WI March 6, 2019
| 9 |
1974 (45 years old) 1961 (58 years old) 1984 (35 years old) 1999 (20 years old)
Meter Shop
| 1 |
0.00 0.02 0.04 0.06 0.08 0.10 0.12 System (Existing) Pilot Treatment (Future)
Manganese
EPA Aesthetic Goal
5 10 15 20 25 System (Existing) Pilot Treatment (Future)
Color
Color TOC
EPA Aesthetic Goal for Color
1 2 3 4 5 6 7 8 Well 3 Well 6 Well 7 Well 9 Well 10 Well 11
Total Organic Carbon of Wausau Wells
Total Organic Carbon
TOC RANGE OF MOST GROUNDWATERS Median of Surface Waters
| 12 |
Item Option 1: Upgrade Existing Plant Option 2: Build New Plant at Improved Location Water Treatment Plant1 $27,000,000 $35,000,000 Well & Distribution System Upgrades2 $2,900,000 $5,900,000 Total Capital3 $29,900,000 $40,900,000
2Demo of existing facility and relocation of meter shop not included in Option 2 cost opinion 1Option 2 includes distribution system modifications to connect supply wells to new water treatment plant 3Includes engineering
Annual Water Fee ($/yr)
All users at 37,300 gpy
50 100 150 200 250 300 350 400 450 500 Current Rate Option 1 Option 2
| 22 |
~$7.50/mo increase ~$6.00/mo increase
100.00 100.00
Legend
NAD_1983_HARN_WISCRS_Marathon_County_Feet
Feet Notes
DISCLAIMER: The information and depictions herein are for informational purposes and Marathon County-City of Wausau specifically disclaims accuracy in this reproduction and specifically admonishes and advises that if specific and precise accuracy is required, the same should be determined by procurement of certified maps, surveys, plats, Flood Insurance Studies, or other official
THIS MAP IS NOT TO BE USED FOR NAVIGATION 3/6/2019 Map Created:
Parcels Section Lines/Numbers Right Of Ways
BUREK AV BUGBEE AV E CAMPUS DR
Wausau, WI
| 23 |
A decision between site alternatives will facilitate scoping and kick-off of next key phase of implementation plan