Project Dustin Clark, P.E. July 2018 George Kalkowsky, P.E. - PowerPoint PPT Presentation

Sandy Creek Sewer Project Dustin Clark, P.E. July 2018 George Kalkowsky, P.E. Outline Objective Needs Costs Steps to Proceed Questions 2 Objectives 2018 Engineering Planning Grant Evaluate Public Sewer Needs


  1. Sandy Creek Sewer Project Dustin Clark, P.E. July 2018 George Kalkowsky, P.E.

  2. Outline • Objective • Needs • Costs • Steps to Proceed • Questions 2

  3. Objectives • 2018 Engineering Planning Grant • Evaluate Public Sewer Needs • Evaluate WWTP and Service Area Options • Identify Potential Funding • Estimate Project Costs 3

  4. Rising Lake Levels • Rising Lake Levels 4

  5. Septic Systems 5

  6. Water Quality Concerns • 23% Response Rate • 47% concerned with water quality • 79% want preservation and protection of natural resources • 10% have no treatment of sewage waste Source: 2011 CNYRPDB Community Survey 6 www.cnyrpdb.org/sccp/docs/Sandy_Creek_Survey_Results_2011.pdf

  7. Water Quality Concerns Source: NYSDEC Priority Waterbody Inventory List 7

  8. Water Quality Concerns Source: NYSDEC Priority Waterbody Inventory List 8

  9. Study Focus Area 9

  10. Typical Sewer System Connection 10

  11. Typical Grinder Pump Installation Typical Grinder Pump Typical Pump Alarm Panel 11

  12. Treatment Plant Options • Village of Pulaski • Pump station and transmission main to pump sewage to the Village of Pulaski. • Expansion to the Village Treatment Plant • Schoeller Technical Papers • Pump station and transmission main to pump sewage to the facility • Reconstruct existing Treatment Plant • Construct a new Facility • Low pressure collection system advantageous for siting the facility 12

  13. Project Costs • Northern Area Collection System • 1214 people • 485 connections • $12M • Southern Area Collection System One or the other, for example • 1117 people • 469 connections • $14M • Wastewater Treatment Plant • New Facility • $7M 13

  14. Project Funding • CWSRF “Hardship” Loan • 30 year loan, interest free • USDA Rural Development Loan • 38 year loan, 3% interest • Water Infrastructure Grant • Up to 25% of project • Water Quality Improvements Program Grant • Up to $5M • USDA Rural Development Grant 14

  15. Estimated Annual User Costs Property Owner with Connection Debt Service $355 - $655 Collection System O&M $100 Treatment Charge $325 Annual Grinder Pump Electrical Cost $20 Repair Reserve $100 TOTAL $900 - $1,200 15

  16. Steps to Proceed • Interest Surveys - your response is our guide • Engineering Report • Funding Applications • Design • Permitting • Earliest Bid/Construction (2022) 16

  17. Questions 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.