water ter services vices depart artment ent
play

WATER TER SERVICES VICES DEPART ARTMENT ENT EQUIPMENT IPMENT, - PowerPoint PPT Presentation

WATER TER SERVICES VICES DEPART ARTMENT ENT EQUIPMENT IPMENT, , PIPING ING AND ND INF NFRASTRU STRUCTU CTURE RE COATIN TINGS CONS NSTRUCTION TRUCTION ADMIN MINISTRA STRATION TION & INS NSPECTI ECTION ON SERVICES VICES


  1. WATER TER SERVICES VICES DEPART ARTMENT ENT EQUIPMENT IPMENT, , PIPING ING AND ND INF NFRASTRU STRUCTU CTURE RE COATIN TINGS CONS NSTRUCTION TRUCTION ADMIN MINISTRA STRATION TION & INS NSPECTI ECTION ON SERVICES VICES Pre-su submittal bmittal Meet etin ing Pro roje ject ct Number er WS WS90200053 53-1 et et al Au August ust 15, 2017 1:00 pm to 2:00 pm

  2. Welcome and Introductions Ellen Pimental, Contracts Specialist Design and Construction Procurement Earon Shepard, Project Coordinator, Water Services Department Anita Pritchard, Team Lead Water Services Department

  3. Age genda nda  Project Description  Scope of Work  Submittal Requirements  Selection Schedule  Questions?

  4. Me Meeti ting ng In Information ormation  Please sign in on the sign in sheet  Please hold questions until after the presentation  This is your ONLY opportunity to ask the City Staff questions

  5. Meeting Overview Addendum to the Request for Qualifications are posted on our website: https://www.phoenix.gov/streets/procurement /current-opportunities It is your responsibility as an RFQ holder to determine, prior to submittal, if addendum has been issued

  6. VENDOR REGISTRATION All Firms MUST UST Be Registered in the Vendor Management System PRIOR IOR TO SUBMITTING BMITTING A PROP PROPOS OSAL AL NEW FIRMS ---After Registering--- the City Will SEND AN EMAIL WITH A VENDOR NUMBER WITHIN TWO DAYS NEW EW THE VE VENDOR OR NUMBER MBER MUST UST TO BE INCLUDED ON THE COVER OF THE STATEMENT OF QUALIFICATIONS OR ON THE BID PROPOSAL PACKAGE/ENVELOPE. INFORMATION ON HOW TO REGISTER WITH THE CITY IS AVAILABLE AT: https://w ps://www ww.phoeni .phoenix.g x.gov/f v/finance inance/v /vendor ndorsre sreg

  7. PROJECT JECT DES ESCRIPTION CRIPTION  The City of Phoenix has equipment, pipe manholes and other structures at various facilities throughout the wastewater system infrastructure  Coatings are applied to equipment, pipe, manholes and other structures to help protect the infrastructure from the harsh wastewater environment  For these coatings to be effective they require routine maintenance. The continual upkeep of protective coatings enhances and extends the life of the infrastructure

  8. PR PROJ OJECT ECT DE DESCR SCRIPTION IPTION Example: Inspect removal of T-lock and installation of corrosion resistant coating

  9. PR PROJ OJECT ECT DE DESCR SCRIPTIO IPTION N GO GOALS ALS Example: Inspect the preparation and recoating of piping.

  10. SC SCOPE OPE OF WORK RK The general scope of work includes the following:  Evaluation of coating systems;  Testing of existing coatings and substrates for composition and physical properties, including lead and asbestos;  Coating failure analysis;  Specification review and document preparation for selected coating systems;

  11. SC SCOPE OPE OF WORK RK co contd ntd.  Cost estimates for various coating options, including long-term maintenance programs;  Review and analysis of protective coatings of chemical containment systems;  Train staff in coating applications, including surface preparation, application, chemical containment systems, regulatory compliance requirements, testing of coatings;  Ability to work within confined spaces in conformance with OSHA, local laws and standards;  Inspection and testing services

  12. Sc Scop ope e of of W Work ork The City will select up to two firms to: Provide technical assistance and inspection services for the 23 rd Avenue WWTP (not 24 th Street) • Wastewater collection system • Cave Creek WRP (new) •

  13. Ch Changes anges fr from om RF RFQ • Remove 91 st Avenue from this RFQ • Add Cave Creek WRP to the RFQ • Up to two firms may be selected • If two firms are selected, they may both may receive work from 23 rd Ave WWTP, Cave Creek WRP, or Wastewater Collection facilities, depending on needs

  14. Qu Questions estions ??

  15. Stat Statem ement ent of of Qu Qualif alifications ications Crit riteria eria  General information (10 points)  Construction Administration and Inspection Experience of the Prime Firm (25 points)  Experience of Key Personnel and Subconsultants (30 points)

  16. Stat Statem ement ent of of Qu Qualifi alifications cations Cr Crit iteria eria  Project roject Under derstanding anding an and Approac oach h (3 (30 0 poi oints) ts)  Overall evaluation of the firm and its perceived ability to provide the required services (5 points)

  17. Stat Statem ement ent of of Qu Qualifi alifications cations Cr Crit iteria eria  SOQ Cover Letter  Clearly display the firm name, fir irm m ven vendor or number mber, project title, contact name, contact email, phone number and project number on the cover of the SOQ and submittal package.  Evaluation Criteria (including project organizational chart)  Additional Content (resumes or other information)

  18. Stat Statem ement ent of of Qu Qualifi alifications cations Cr Crit iteria eria  MAXIMUM pages permitted is 10 pag ages es: + Evaluation Criteria (including organizational chart) + Additional Content (resumes or other information) + Photos, charts/graphs or other evaluation content = 10 MAXIM IMUM UM pag ages es permitt rmitted ed

  19. Stat Statem ement ent of of Qu Qualifi alifications cations Cr Crit iteria eria  Each page side with criteria information will be counted.  Pages that have photos, charts, and graphs will be counted toward maximum number of pages.  Cover letter, front and back covers, Table of Contents and tab dividers will NOT be counted toward the maximum page limit, UNLESS they include information that may be considered by the selection panel.

  20. Stat Statem ement ent of of Qu Qualifi alifications cations Crit Cr iteria eria  Submit 8 Copies of the SOQ  SOQ is Due:  12:00pm Noon – Arizona local time Friday, August 25, 2017 Phoenix City Hall 200 West Washington Street, 6 th Floor Submittal Box

  21. Grounds Grounds for or Di Disqualif squalification ication  Receipt of SOQ after the specified cut-off date and time Too few copies of the submittal   Deposit of SOQ in the wrong location  Violating the “Contact with City Employees” policy

  22. SO SOQ Q Du Due e Da Date 12:00 :00 P.M .M. . Arizona izona local cal time Fr Friday, day, Aug ugust ust 25, , 2017 17 Ci City y Ha Hall, ll, 200 0 W. Wa . Washingt hington on Street eet th Floor, 6 th or, Submi ubmitta ttal l Bo Box

  23. Stre Street t Transp ranspor ortation tation Procurement Procurement Se Secti ction on Web ebpag page  Request for Qualifications  Notification  Plan Holders List  Pre Submittal Power Point Presentation  Sign In  Award  Located at : http://phoenix.gov/streets/procurement/current- opportunities

  24. Qu Questions estions Af After er Tod oday Email Your Questions To: Ellen Pimental Contracts Specialist Ellen.Pimental@phoenix.gov 602-534-1423

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend