VEBH Architects:
Northern Cambria School District Feasibility Study
Board Meeting November 20, 2018
VEBH Architects
VEBH Architects: Northern Cambria School District Feasibility Study - - PowerPoint PPT Presentation
VEBH Architects: Northern Cambria School District Feasibility Study Board Meeting November 20, 2018 VEBH Architects 1. Existing Buildings Capacity Analysis vs . Enrollment 2. Current Building Conditions 3. Cost of Renovating High School vs Cost of
VEBH Architects:
Northern Cambria School District Feasibility Study
Board Meeting November 20, 2018
VEBH Architects
VEBH Architects
.....
z
LLI
:i:
.... ....
a::
z
LLI
BLDG
High School 9-12 Middle School 6-8 Elementary K-5 TOTAL
K-12 Average: 82/grade K-8 Average: 81/gradeNorthern Cambria School District
2017 Enrollment
87 96 88 342
85
97 88 84 269 89
77
72 62 67 78 80 98 97 88 84 71 87 96 88 1072
VEBH Architects
SCHOOL YEAR
GRADE
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 PK
15 18 15 15
13
10 10 11
13 11
K
87 91 103 108 94 87 70 61 76 79 76 64 68 67 65 63
1
81 89 84 97 100 82 84 67 62 74 62 52 60 64 63 61
2
82 78 88 85 104 98 76 84 67 58 67 57 51 59 63 62
3
91 80 80 89 84 103 97 82 78 63 78 70 57 51 59 63
4
80 91 85 81 89 85 97 97 80 78 80 60 69 56
so
58
5
95 86 90 83 77 84 84 100 96 81 98 66 60 69 56 50 6 94 96 84 92 83 79 86 91 97 98 97 77 68 62 71 57
7
88 98 93 85 91 87 73 87 88 95 88 79 75 67 61 69
8
97 86 100 92 88 85 81 73 84 86 84 95 75
7264 58
9
100 93 84 103 95 85 93 89 71 87 71 94 98
7774 66 10 104 98 83 81 110 101 89 96 87 66 87 85 92
96
75
7211 88 103 100 90 83 107 95 83
96 82 96 81 81 88 92
7212 98 88 101 97 89 83 109 97 88 93 88 70 86 86 93 98
TOTALS
1185 1177 1175 1183 1187 1166 1134 1107 1070 1040 1072 950 940 914 886 849
D ifference
8 4
32
% DIFF
0.68% 0.34%
74%
3.08%
.
421 429 440 460 471 455 424 391 363 352 363 303 305 297 300 307
8 11 20 11
11
2
3
7 Gr 5-8 374 366 367 352 339 335 324 351 365 360 367 317 278 270 252 234
1
27 14
7
Gr 9-12 390 382 368 371 377 376 386 365 342 328 342 330 357
3 6
10
14
27
Existing Buildings Capacity Analysis vs. Enrollment High School Capacity 104,000 sf 34 7 students by 2020 299 sf /student Right-Sized 347 x 200 sf/student= 69,400 sf 34,600 sf oversized/inefficient El/MS School Capacity 162,672 sf 583 students by 2020 279 sf /student Right-Sized 583 x 180 sf /student = 104,940 sf 57,732 sf oversized/inefficient
VEBH Architects
High SchooO 19~2 ornd 1991 104,000 sf orn 2~ ocrres
Architectural
Windows / Doors Brick/ Roofing Security modifications
Art/ T ech renovations
Kitchen renovations Auditorium renovations Main Entry / Office revisions ADA issues
HVAC 1950's Piping replacement
Coal augers needed Variable Frequency Drive Pumps
Exhaust Sys Weights / Lockers / Art Restrooms
exhaust Eliminate corridor plenum All HVAC units due for replacement Building Controls needed
Plumbing
Piping is original 1950's ADA Restroom fixture modifications T
ADA electric water coolers 10 years life on domestic water heater
Electrical Elec service and several panel boards original
Wiring upgrades
Lighting only partially upgraded Fire Alarm system and strobes
Emergency Generator due for replacement
PA/ Phone system needed
Phones in classrooms Auditorium systems needed
Site
Parking = 151 spaces 25 extra spaces in center area
Previous Study which lead to Consolidation Question
6
VEBH Architects
Elem / Middle School 1975 original, Boiler House 1988 1 62,672 sf on 35 acres
Architectural Exterior good condition
Kitchen minor upgrades LGI renovations Main Entry / Office minor revisions
HVAC
Piping is original Coal augers needed All HY AC units due for replacement Building Controls needed
Plumbing
Piping is original ADA Restroom fixture modifications 10 years life on domestic water heater
Electrical Elec service and several panel boards original Lighting partially upgraded Fire Alarm Panel has been upgraded
Emergency Generator due for replacement PA / Phone needed LGI systems needed
Site
Parking = 156 spaces
Previous Study which lead to Consolidation Question
7
VEBH Architects
Cost of Renovating High School
Estimated H.S. Renovation Cost Range
$15,600,000 - $22,000,000 (includes $1 .2 million for site) *2020 Projected Enrollment of 347 students R esults in highly inefficient building w ith 299 sf /student (215 industry standard). Cost of Consolidating
Estimated Elem/MS Renovation Cost Range
$20,000,000 - $30,000,000 (includes $1.5 million for site) *2020 Projected Enrollment of 567 stud ents Results in highly inefficient building with 223 sf /student (1 60 industry standard). Estimated Elem/MS Renovation Cost Range $12,500,000 - $17,000,000 (includes $1.5 million for s
ite)
VEBH Architects
Northern Cambria School District VEBH Arc hitects
Possible Schedule for K-12 Consolidation Stage 1 - Programmatic Program & Analyze Alternatives Stage 2 - Schematic Design Finalize Program, Scope & Cost Stage 3 - Design Development Construction Documents Stage 4 - Bidding Boa rd Approva l Aw ard Bids Stage 5 Construction
VEBH Architects
VEBH Architects
What lead to the need for a study?
and the cost of renovating 1 . HS area 104,000 sf
eno $1 8 - $22,000,000
years}?
eno $20 - $30,000,000
enrollment?
due to shrinking enrollment and excess building area. If we can ultimately only have to renovate and maintain one building would we save money?
K-12 building
Previous Study which lead to Consolidation Question
11
VEBH Architects
CAFETERIA
VEBH Architects
VEBH Architects
VEBH Architects
[J
SOFTBALL FIELD ELEMENTARY PLAY AREA SOFT PLAY AREA 155 SCHOOL PARKING j83 EVENT PARKING STEEP SLOPE UPHILL GARAGE SHED✓
EBH
Architects
+-
[J
NORTHERN CAMBRIA K-12 SCHOOL
Event Perking ELEMENTARY PLAY AREA SOFT PLAY AREA 252 SCHOOL PARKING 279 EVENT PARKING STEEP SLOPE UPHILL~
GARAGE SHED✓ EBH
Architects
VEBH Architects
L 1
r
[
CADD / ENGINEERING WOOD SHOP
STORAGE STORAGEMETALS FAMILY & CONSUMER SCIENCE
STORAGEART ROBOTICS
SOLDERINGVEBH Architects
CHEMISTRY
BAND
<w
a:: a:: 0 0.. I-
enBIOLOGY/ PHYSICS BIOLOGY/ PHYSICS PERFORMING ARTS
STORAGEl
:hitects
SCHOOL:
Elementary K-5
PRESENT PLANNEDlf1
n,.
1 3 UNIT FTE NUMBER .ME OF SP/ICE CI\P OF UN I TS!\LF'-TIME KINDRGRTN
50 JLL- TIME KINDRGRTN 25
4
C:G CLSRM 660+ SQ FT25 19 rHER : JILDING TOTAL
xx xxxxxx
2020 Enrollments K-5 = 366 students
6-1 2 = 548 students
14 ff" H TOT/IL TOTAL FTE NUMBER !:TE CAP OF UNITS CI\P100 475 575
xxxxxx
11 NAME OF SPACEREG CLSRM 660+ SQ F'T
SCIENCE CLSRM 660+ SQ F'T SCIENCE LAB 660+ SQ F'T PLANETARIUM W/CLSRM 660+ SQ F'T A LTERNATIVE ED ROOM 660+ SQ FT BUSINESS CLSRM 660+ SQ FT BUSIN ESS LAB 660+ SQ FT
COMPUTER LAB 660+ SQ FT
TV I NSTRUCTIONAL STUDIO 660+ SQ FT
ART CLASSROOM 660+ SQ FT
MUSIC CLASSROOM 660+ SQ FT
BAND ROOM 660+ SQ FT ORCHESTRA ROOM 660+ SQ FT
CH
ORAL ROOM 660+ SQ FT F'AMILY/CONSMR SCIENCE 660+ SQ FT
IA/SHOP 1800+ SQ F'T TECH ED 1800+ SQ F'T
VO AG SHOP W/CLSRM 660+ SQ FTDRIVER ' S ED 660+ SQ FT
GYM 6500- 7500 SQ F'T AUX GYM 2500 SQ FT
OTHER :
Pool
OTHER:
BUI LDING TOTAL
MS/SEC UTILIZATION (BLDG TOTAL X . 9)SCHOOL: Middle School
PRESENT PLANNED HZ 13 H1 Ho UNIT NUMBER TOTAL NUMBER TOTAL FTE OF FTE OF FTE CAP UNITS CAP U NITS CI\P25
14
350 25
1
25 20 = 20 20 25 20
3
60 20 20 20
1
20 25 25
1
25 25 25 20 1 20 20 1 20 20 20 20 66 1.0 66 33 33
1
33
XXX xxxxxx
619
XXXXX> XXX xxxxxx
557
XXXXX>
VEBH Architects
VEBH Architects