CTF SOLAR Company presentation May 2016 CTF SOLAR at a glance CTF - - PowerPoint PPT Presentation

ctf solar
SMART_READER_LITE
LIVE PREVIEW

CTF SOLAR Company presentation May 2016 CTF SOLAR at a glance CTF - - PowerPoint PPT Presentation

CTF SOLAR Company presentation May 2016 CTF SOLAR at a glance CTF SOLAR is a global project developer, EPC, O&M provider and technology company in the field of photovoltaics, with offices in Frankfurt and Dresden. CTF SOLAR is a 100%


slide-1
SLIDE 1

CTF SOLAR

Company presentation

May 2016

slide-2
SLIDE 2

CTF SOLAR at a glance

CTF SOLAR is a global project developer, EPC, O&M provider and technology company in the field of photovoltaics, with offices in Frankfurt and Dresden.

CTF Solar Office in Dresden, Germany

CTF SOLAR is a 100% subsidiary of CTIEC, a top-200 global engineering design and consulting company based in Shanghai,

  • China. CTIEC is owned by CNBM, Asia’s

largest construction material supplier.

slide-3
SLIDE 3

CTF SOLAR at a glance

PROJECT DEVELOPMENT

  • Design
  • Permitting
  • Consulting

PROJECT IMPLEMENTATION

  • Engineering
  • Procurement
  • Construction

FINANCIAL SOLUTIONS

  • Construction

Finance

PROJECT OPERATION

  • Operation &

Maintenance

slide-4
SLIDE 4

Global presence

slide-5
SLIDE 5

CNBM – CTF Affiliation

China National Building Materials Group Corporation Bejing-based Global Fortune 500 company with 180,000 employees. CNBM holds a majority interest (91%) in CTIEC. CTF SOLAR GmbH is a wholly-owned subsidiary

  • f CTIEC focusing on CdTe

module technology and solar power plants. China Triumph International Engineering Co., Ltd. Shanghai-based, internationally operating EPC company, PV parks, glass and cement factories. 2,700 employees.

91% 100%

slide-6
SLIDE 6

China National Building Materials Group Corporation (CNBM)

Established in 1984 Largest comprehensive building materials industry group in Asia, integrating scientific research, manufacturing and logistics in a single entity Revenues of US $17 billion (2014), with 180,000 employees and 20 companies worldwide Ranked 270th in 2015 FORTUNE 500 Global

CNBM at a glance

slide-7
SLIDE 7

China Triumph International Engineering Co., Ltd.

Engineering firm active around the globe as the engineering arm and technical platform of CNBM Completed over 225 glass and cement production line projects including design, equipment manufacture, procurement, construction, operation and maintenance Ranked 40th on Top 500 China Building Materials Enterprises list Listed in Top 200 of Global Engineering Design and Consulting Companies Extensive international general contracting experience Revenues of more than US $1.1 billion (2014) 2,700 employees

CTIEC at a glance

slide-8
SLIDE 8

Service scope

Project Development

Our offer: Services for Solar Parks Worldwide

Design & Engineering Procurement Financial Solutions Construction O&M High quality and cost-effective system design German engineering Strategic relationships to all major suppliers Qualified procurement Flexible financing models, e.g. for instance for construction finance, Sinosure Backed by strong balance sheet of parent company CNBM Fast project execution with experienced teams and suppliers Flexible project structures (CTF as general contractor, shared EPC services) 24/7 O&M services

slide-9
SLIDE 9

Project references CTIEC/CTF

JAPAN USA THAILAND CHINA UK

5 MWp 7 MWp 50 MWp 207 MWp 205 MWp

Over 474 MWp installed capacity worldwide

Build status as at June 2016

  • 99 MWp under construction
  • 375 MWp operational
slide-10
SLIDE 10

UK Project references 2014

Location: Shrewsbury, Shropshire, UK PV Modules: 39,238 polycrystalline Jetion modules (250 Wp) Inverter: 4 central inverter stations Mounting Structure: mono pile Construction Time: 10 weeks Grid Connection: September 2014 Construction Finance: China Triumph International Engineering Co., Ltd.(CTIEC) General Contractor: CTF Solar / CTIEC

Hayford 9.8 MWp

slide-11
SLIDE 11

UK Project references 2014

Location: Llanelli, Carmarthenshire, UK PV Modules: 24,012 polycrystalline Jetion PV modules (255 Wp) Inverter: 3 central inverter stations Mounting Structure: mono pile Construction Time: 7 weeks Grid Connection: September 2014 Construction Finance: China Triumph International Engineering Co., Ltd. (CTIEC) General Contractor: CTF Solar / CTIEC

Pentre 6.1 MWp

slide-12
SLIDE 12

UK Project references 2015

Location: Barrow-in-Furness, Cumbria, UK PV Modules: 28,382 polycrystalline Jetion PV Modules (255 Wp) Inverter: 3 central inverter stations Mounting Structure: mono pile Construction Time: 5 weeks Grid Connection: March 2015 Construction Finance: China Triumph International Engineering Co., Ltd. (CTIEC) General Contractor: CTF Solar / CTIEC

Roanhead 7.1 MWp

slide-13
SLIDE 13

UK Project references 2015

Location: Scunthorpe, North Lincolnshire, UK PV Modules: 153,617 polycrystalline Jetion PV modules (260 Wp) Inverter: 17 Ingeteam central inverter stations Mounting Structure: Different suppliers (mono pile and ballasted) Construction Time: 6 weeks Grid Connection: March 2015 Construction Finance: China Triumph International Engineering Co., Ltd. (CTIEC) General Contractor: CTF Solar / CTIEC

Raventhorpe 39.9 MWp

slide-14
SLIDE 14

UK Project references 2016

Location: Fife, UK Modules: 19,458 polycrystalline AEG modules (255Wp) Inverter: Huawei Mounting Structure: Heintzmann Industries Construction Time: 7 weeks Grid Connection: March 2016 Construction Finance: CTF Solar/ CTIEC General Contractor: CTF Solar General O&M: CTF Solar

CTF Solar acquired these 3 projects in November 2015, completing the development and construction in Q1 2016.

Lower Stanley Farm 4,92 MWp Stanton Under Barton 3,62 MWp Wormit 4.96 MWp Location: Leicestershire, UK Modules: 13,800 polycrystalline AEG modules (260Wp and 265Wp) Location: Gloucestershire, UK Modules: 19,320 polycrystalline AEG modules (255Wp)

slide-15
SLIDE 15

CdTe factory

CTF Solar and CTIEC are currently building its first CdTe module factory in Chengdu, China Construction will finish by the end of 2016. CTF Solar owns the technology. We will begin selling CdTe module factories jointly with CTIEC in 2017.

80 MWP production Line

slide-16
SLIDE 16

CdTe factory facts

Production Facility

CdTe factory, internal view of site with one production line

Proprietary CdTe module technology 100 to 300 MWp production capacity possible 24/7 operation, 52 weeks/year 65 modules per hour Uptime 95% Yield 95% 250 employees Layout based on zero-emission concept Construction time approx. one year Production costs 0.33 – 0.37 EUR/Wp CdTe module efficiency roadmap: up to 24% with production costs < 0,20 EUR/Wp

slide-17
SLIDE 17

CdTe module specifications

Thin film, CdTe modules on rooftop

Specification of initial module

Technology CdTe Efficiency 13% 250Wp module Dimensions: 1200mm * 1600mm Weight: 35 kg Thickness: 7 mm Conformity & Certificates*  EN 61646  EN 61730-1  DIN V VDE V 0126-3  DIN V VDE V 0126-5

slide-18
SLIDE 18

CTF SOLAR GmbH Marketing Industriestraße 2 65779 Kelkheim, Germany R&D Zur Wetterwarte 50, Haus 303 01109 Dresden, Germany Phone: +49 6195 6763-0 Fax: +49 6195 6763-19 mailto: info@ctf-solar.com web: http://www.ctf-solar.com

Thank you.