Presentation to Island Corridor Foundation Annual General Meeting Vancouver Island Rail 23 April 2015 VANCOUVER ISLAND RAIL CORRIDOR 2 23 April 2015 Presentation to


slide-1
SLIDE 1

Vancouver Island Rail

Presentation to Island Corridor Foundation Annual General Meeting

23 April 2015

slide-2
SLIDE 2

VANCOUVER ISLAND RAIL CORRIDOR

23 April 2015

Presentation to ICF Annual General Meeting 2

slide-3
SLIDE 3

Railway Infrastructure Improvement Funding Total $20.9M Project - Update

Regional Districts Railway Bridge Improvements – 10 Year Passenger Rail

  • 1. Immediate &10 Year Structural and Immediate Bridge

Tie Renewal Requirements –Regional Districts - $3.115M

  • 2. 10 Year Bridge Tie Renewal Requirements – ICF -

$2.285M

  • 3. 10 Year Bridge Maintenance – SVI - $0.5M

Total Bridge Repairs & Improvements = $5.9M Approved

23 April 2015

Presentation to ICF Annual General Meeting 3

slide-4
SLIDE 4

Provincial / Federal Track Upgrade Plan

  • 1. MoTI Bridge Assessment $500,000 (Complete 2012)
  • 2. Track Tie Renewal – 110,300 ties (25%) - $11.216M
  • 3. Rail Joint Renewal – 9000 Pair c/w Fastenings - $0.92M
  • 4. Track Re-Ballast & Surface – Complete Line - $2.364M

Total Track Improvements = $15M Under ongoing review > Province

23 April 2015

Presentation to ICF Annual General Meeting 4

Railway Infrastructure Improvement Funding

slide-5
SLIDE 5

Reports & Studies 2006 to date

MNP Report on E&N Railway - 2005 BC MoTI / IBI Group - Evaluation of the E & N Railway Corridor – Foundation Paper – 2009 ICF / SVI - Potential for Tourism Service on Vancouver Island - 2009 ICF / SVI – Potential for Freight Expansion – 2009 SVI – The Advantages of Rail vs. Truck Transportation of Coal on Vancouver Island – 2010 BC MoTI / Associated Engineering / Benesch – Bridge Inspection and Assessment – E&N Railway, Vancouver Island, BC, Canada – 2012 Island Explorer Excursion Train Feasibility Study – SVI - Sept/2014

23 April 2015

Presentation to ICF Annual General Meeting 5

slide-6
SLIDE 6

VIA Rail Passenger Service

6

23 April 2015

Presentation to ICF Annual General Meeting

slide-7
SLIDE 7

VIA Rail – Train Service Agreement

Approval – 2014 – VIA Rail to provide:

  • Deficit Funding – $1.45M (Year 1)
  • Liability Insurance
  • Refurbished Bike-Friendly Rail Cars

Improved Serviced – Based in Nanaimo Local control of schedule and service - (SVI/ICF) Revenue / Ridership Risk with Operator (SVI):

  • Need to Respond to Market Demand and Optimum Business

Model

  • Inter-operability with other transportation modes –eg. bus / ferry
  • Key Connections
  • Courtenay > Powell River > Campbell River
  • Qualicum Beach > Port Alberni > Tofino / Ucluelet

23 April 2015

Presentation to ICF Annual General Meeting 7

slide-8
SLIDE 8

Freight Business – Current

2014 Freight Business Rail Service – Direct #Carloads Feed Grain - Top Shelf Feeds – Duncan 158 (direct service suspended – 31 October 2014) Superior Propane – Nanaimo 206 National Silicates –Parksville (service suspended Oct) 9 Total – Direct Rail Service 373 Transload Service – Wellcox Yard #Carloads Top Shelf Feeds (commenced Dec) 14 Poles – NPTW & Stella-Jones (from Courtenay) 52 Latex – Catalyst Paper (to Port Alberni) 95 Fly Ash – Lafarge Cement 25 Other 28 Total – Transload Service 214

23 April 2015

Presentation to ICF Annual General Meeting 8

slide-9
SLIDE 9

SVI Operations

Current Active Staff Levels # Employees Management / Administration 3 Operations 2 Maintenance 7 Total Active Staff 12

23 April 2015

Presentation to ICF Annual General Meeting 9

slide-10
SLIDE 10

SVI Operations

Ongoing Maintenance Activities

Track and bridge inspections Crossing & signal system inspection / maintenance Vegetation control Annual track geometry testing Surfacing and re-ballasting as required by visual inspection and by annual track geometry testing Re-gauging of track as required by visual inspection and by annual track geometry testing Tie renewals as determined by visual inspect and by annual track geometry testing

23 April 2015

Presentation to ICF Annual General Meeting 10

slide-11
SLIDE 11

SVI Operations

Ongoing Maintenance Activities (cont’d)

Tie renewals (as determined by visual inspect and by annual track geometry testing): Total – 2006 to 2009 inclusive...= 16,086 Total – 2010 to 2013 inclusive...= 6,498 Total – 2014...............................= 790 Total – 2006 to 2014 inclusive........= 23,374 Replacement of defective rails as determined by visual inspection and annual ultrasonic rail testing Renewal of defective steel components as determined by visual inspection and annual ultrasonic rail testing Drainage re-ditching and culvert replacement as required to maintain track drainage systems

23 April 2015

Presentation to ICF Annual General Meeting 11

slide-12
SLIDE 12

12

23 April 2015

Presentation to ICF Annual General Meeting

Freight Opportunities

slide-13
SLIDE 13

13

23 April 2015

Presentation to ICF Annual General Meeting

Freight Connections

Wellcox Rail Yard

slide-14
SLIDE 14

14

23 April 2015

Presentation to ICF Annual General Meeting

Freight Connections

Wellcox Rail Marine Ramp, Nanaimo

slide-15
SLIDE 15

15

23 April 2015

Presentation to ICF Annual General Meeting

Freight Connections

(to North American Markets)

slide-16
SLIDE 16

23 April 2015

Freight Connections

Annacis Rail Marine Terminal

Presentation to ICF Annual General Meeting 16

slide-17
SLIDE 17

23 April 2015

Freight Opportunities

North American Market Connections

Presentation to ICF Annual General Meeting 17

slide-18
SLIDE 18

Tourism / Excursion Rail Cruise Ship Industry Support

23 April 2015

Presentation to ICF Annual General Meeting 18

slide-19
SLIDE 19

Tourism / Excursion Rail

Island Explorer – Feasibility Study (September 2014) Conclusions Feasible / Positive Bottom Line Dual Purpose Positive synergy with Nanaimo Cruise Ship Calls Island Local “Rolling Special Events” Break-even – 15 Excursion / Events per season High quality hospitality service Local “Themed” events Excess capacity – ie. add more equipment (coaches) Synergy with Island businesses / communities / tourism

23 April 2015

Presentation to ICF Annual General Meeting 19

slide-20
SLIDE 20

Tourism / Excursion Rail

23 April 2015

Presentation to ICF Annual General Meeting 20

slide-21
SLIDE 21

Tourism / Excursion Rail

23 April 2015

Presentation to ICF Annual General Meeting 21

slide-22
SLIDE 22

Tourism / Excursion Opportunities

23 April 2015

Presentation to ICF Annual General Meeting 22

Alberni Pacific – Port Alberni Successful Model

slide-23
SLIDE 23

Commuter Services

(Future Option available to communities

  • eg. CRD and Victoria Western Communities)

23 April 2015

Presentation to ICF Annual General Meeting 23

slide-24
SLIDE 24

Historic Stations – Heritage Canada Restoration & Development

23 April 2015

Presentation to ICF Annual General Meeting 24

Courtenay Alberni Qualicum Nanaimo Duncan

Nanaimo Train Station

slide-25
SLIDE 25

Rail Trail Development

Synergy with bike

  • friendly rail cars

23 April 2015

Presentation to ICF Annual General Meeting 25

slide-26
SLIDE 26

Rail Trail Development

23 April 2015

Presentation to ICF Annual General Meeting 26

slide-27
SLIDE 27

27

23 April 2015

Presentation to ICF Annual General Meeting