uswac items cgp update utah storm water advisory
play

USWAC ITEMS & CGP UPDATE UTAH STORM WATER ADVISORY COMMITTEE - PowerPoint PPT Presentation

USWAC ITEMS & CGP UPDATE UTAH STORM WATER ADVISORY COMMITTEE (USWAC) One o f the la rg e st Uta h APWA sub c o mmitte e s Me e t o n a mo nthly b a sis (e xc e pt Jul., Oc t., De c .) 2 nd We dne sda y o f the mo nth a t 10:30


  1. USWAC ITEMS & CGP UPDATE

  2. UTAH STORM WATER ADVISORY COMMITTEE (USWAC) • One o f the la rg e st Uta h APWA sub c o mmitte e s • Me e t o n a mo nthly b a sis (e xc e pt Jul., Oc t., De c .) • 2 nd We dne sda y o f the mo nth a t 10:30 a .m. • Multi Ag e nc y Sta te Offic e Building (195 No rth 1950 We st, SL C, Ro o m 1015)

  3. UTAH STORM WATER ADVISORY COMMITTEE (USWAC) • Missio n to c o o rdina te e ffo rts to re duc e sto rm wa te r po llutio n a nd pro vide a de q ua te flo o d c o ntro l • T ypic a l a g e nda ite ms – Wa te r q ua lity tra ining ; Upda te s fro m Sta te o f Uta h DE Q; Upda te s fro m Ca c he , We b e r, Da vis, Sa lt L a ke , Uta h, a nd Wa shing to n Co untie s

  4. UTAH STORM WATER ADVISORY COMMITTEE (USWAC) • Pre vio us tra ining s – Spring runo ff fo re c a st (Bria n Mc I ne rne y), Pre pa ring fo r a sto rm wa te r a udit (Ne sto r Ga llo ) • Upc o ming tra ining s – Sto rm wa te r a udit le sso ns le a rne d, L o w I mpa c t De ve lo pme nt (L I D), We tla nds

  5. NEW CONSTRUCTION GENERAL PERMIT (CGP) • Ge ne ra l pe rmit - the rule s o r re g ula tio ns fo r the ne xt five ye a rs • T hre e se pa ra te pro g ra ms • Co nstruc tio n • I ndustria l • Munic ipa l (MS4) • Pub lic c o mme nt pe rio d is 30 da ys http:/ / www.wa te rq ua lity.uta h.g o v/ UPDE S/ sto rmwa te rc o n.htm •

  6. STORM WATER ACRONYMS • SWPPP • SWMP • NOI • NOT • BMP • MS4 • Co mmo n Pla n o f De ve lo pme nt

  7. WHAT’S THE SAME WITH THE NEW PERMIT? • A lo t o f re q uire me nts a re the sa me • Po st a no tic e o f yo ur SWPPP • K e e p SWPPP o nsite o r ne a rb y (within 30 minute s) • I nspe c t c o nstruc tio n site s e ve ry 7 da ys o r e ve ry 14 da ys a nd within 24 ho urs o f a n 0.5” ra in e ve nt • De ve lo p a SWPPP & sub mit NOI prio r to c o nstruc tio n • T ra in sta ff o n sto rm wa te r q ua lity me a sure s

  8. WHAT’S NEW TO THE PERMIT? • A lo t – the b o dy o f the pe rmit is 56 pa g e s • I nc luding the a ppe ndic e s it is 118 pa g e s in le ng th • T he pre vio us pe rmit wa s 26 pa g e s in le ng th • A lo t ha s b e e n a dde d fo r c la rific a tio n • Re a d it whe n yo u c a n find time • Pre se nt to da y so me inte re sting a nd no te wo rthy ite ms b ut no t c o mpre he nsive • Still in pub lic c o mme nt pe rio d a nd ma y b e sub je c t to c ha ng e

  9. WHAT’S NEW TO THE PERMIT? • Owne r & Ope ra to r a re re q uire d to sig n the NOI (1.1.1pg . 1) • I f the re is e me rg e nc y re la te d c o nstruc tio n tha t la sts lo ng e r tha n 30 da ys a NOI a nd SWPPP a re re q uire d (1.2.1 pg . 3)

  10. WHAT’S NEW TO THE PERMIT? • I n o rde r to o b ta in a NOT must c o nta c t the lo c a l MS4 fo r a fina l inspe c tio n(1.1.1 pg . 7) • E xisting pro je c ts ha ve 6 mo nths fro m the issua nc e o f the pe rmit to me e t the ne w re q uire me nts (1.4.3 pg . 7) • Altho ug h ma ny a spe c ts o f de ve lo ping a SWPPP do n’ t re q uire a P.E ., the re a re sig nific a nt po rtio ns o r ite ms re q uire d in the de ve lo pme nt o f a SWPPP tha t ma ke s it to whe re ma ny if no t a ll SWPPPs must b e sta mpe d b y a P.E . (2.1.1.b pg . 9)

  11. WHAT’S NEW TO THE PERMIT? • Na tura l b uffe rs o r e q uiva le nt se dime nt c o ntro ls re q uire d whe n the re is a surfa c e wa te r lo c a te d within 50’ o f pro je c ts e a rth disturb a nc e (2.1.2 pg . 11)

  12. WHAT’S NEW TO THE PERMIT? • Re q uire me nt to re mo ve se dime nt tra c ke d-o ut fro m c o nstruc tio n site (se ve ra l time s a da y if ne c e ssa ry) (2.1.2.c .iv pg . 14)

  13. WHAT’S NEW TO THE PERMIT? • Addre sse s sta b iliza tio n pra c tic e s in a rid a nd se mi- a rid re g io ns (20” o f ra infa ll pe r ye a r). “ S tabilizatio n re quire me nts are mo re diffic ult the mo re arid the are a. Re -ve ge tatio n fro m se e d in arid are as c an take mo re than 3 ye ars to fully de ve lo p.” (2.2 pg . 19) • S tabilize d =70% o f o riginal de nsity o ve r all o f the disturbe d are a (2.2.5 pg . 22)

  14. WHAT’S NEW TO THE PERMIT? • BMP ma inte na nc e a nd re pa irs sho uld b e do ne no la te r tha n 7 da ys fro m the time o f disc o ve ry o r as dire c te d by the DWQ, MS 4, o r E PA (2.3.2.a.ii pg. 25)

  15. WHAT’S NEW TO THE PERMIT? • L o c a te po rta b le to ile ts so the y a re se c ure a nd will no t tip o ve r a nd po sitio n the m to b e a t le a st 10’ a wa y fro m a ny sto rm wa te r c o nve ya nc e inle t, c urb a nd g utte r (2.3.3.c .vi pg. 28) • L o c ate c o nc re te washo uts at le ast 50’ fro m surfac e wate rs (2.3.3.d.ii pg. 28)

  16. WHAT’S NEW TO THE PERMIT? • E me rge nc y spill no tific atio n – if amo unt o f spill e xc e e ds a re po rtable quantity no tify the Natio nal Re spo nse Ce nte r, S tate o f U tah, lo c al he alth de partme nt, and MS 4. Writte n re po rt o f the spill must be submitte d within 7 days (2.3.4. pg. 28) • Be tte r de fine s what a qualifie d inspe c to r is. E xample s inc lude but are no t limite d to : U tah Re giste re d S to rm Wate r I nspe c to r (RS I ), Ce rtifie d Pro fe ssio nal in E ro sio n and S e dime nt Co ntro l (CPS E C), Ce rtifie d I nspe c to r o f S e dime nt and E ro sio n Co ntro l (CI S E C)… (4.1.1. pg. 32)

  17. WHAT’S NEW TO THE PERMIT? • I f yo u a re suspe nding e a rth-disturb ing a c tivitie s due to fro ze n c o nditio ns, yo u ma y te mpo ra rily suspe nd inspe c tio ns o n yo ur site until tha wing c o nditio ns. Runo ff is unlike ly due to c o ntinuo us fro ze n c o nditio ns tha t a re like ly to c o ntinue a t yo ur site fo r a t le a st 30 da ys. (4.1.4. pg . 33) • Sto re pe tro le um pro duc ts a nd o the r c he mic a ls in wa te r tig ht c o nta ine rs a nd pro vide e ithe r (1) c o ve r to pre ve nt the se c o nta ine rs fro m c o ming in c o nta c t with the ra inwa te r o r (2) a simila r e ffe c tive me a ns to pre ve nt disc ha rg e o f po lluta nts (e .g . spill kits, se c o nda ry c o nta inme nt, b e rms, e tc .) (2.3.3.c .iii pg . 26)

  18. WHAT’S NEW TO THE PERMIT? • T he fo llo wing will b e re g ula te d a s Cla ss V inje c tio n we lls a nd re po rte d to the DE Q fo r inve nto ry: • F re nc h dra ins (if sto rm wa te r is dire c te d to a ny b o re d, drille d, drive n sha ft o r dug ho le tha t is de e pe r tha n its wide st surfa c e dime nsio n, o r ha s a sub surfa c e fluid distrib utio n syste m); • Co mme rc ia lly ma nufa c ture d pre -c a st o r pre -b uilt pro prie ta ry sub surfa c e de te ntio n va ults, c ha mb e rs, o r o the r de vic e s de sig ne d to c a pture a nd infiltra te sto rm wa te r flo w; • Drywe lls, se e pa g e pits, o r impro ve d sinkho le s (if sto rm wa te r is dire c te d to a ny b o re d, drille d, drive n sha ft o r dug ho le tha t is de e pe r tha n its wide st surfa c e dime nsio n, o r ha s a sub surfa c e fluid distrib utio n syste m).

  19. WHAT’S NEW TO THE PERMIT? • E xa mple o f Cla ss V inje c tio n we lls a s pro po se d:

  20. UPCOMING UPDATES & CHANGES • Re g iste re d Sto rm Wa te r I nspe c to r (RSI ) tra ining • Re g iste re d Sto rm Wa te r Re vie we r (RSR) tra ining ? • SWPPP Che c klist • Othe rs?

  21. QUESTIONS? • T ha nk yo u fo r yo ur time .

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend