UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% - - PowerPoint PPT Presentation
UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% - - PowerPoint PPT Presentation
UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% SCHEMATIC DESIGN REVIEW Team Commitment Project Evolution Project Tenets 1. Nature as Guide 2. Reducing Scale 3. Placemaking 4. Building Community Architecture Team
Team Commitment Project Evolution Project Tenets
- 1. Nature as Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
Architecture
Team Commitment Project Evolution Project Tenets
- 1. Nature as Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
Architecture
“…. The University belongs to a complex history of interactions and transformations- it is a composite environment always being assembled and reassembled with friction and difficulty. ”
- In the Ecotone-
The UC Santa Cruz Campus, James Clifford
“An Architecture here must grow out of the problems, restrictions and potentialities of the site..."
Tommy Church founding UCSC Campus Landscape Architect
“Build many trails, reveal many places where a student, or a teacher, or an administrator could sit in a quiet hour with only the Redwoods... ”
- Ansel Adams
1. Initial RFP UG, G, F 2. RFP Concept Phase UG, G, F 3. Schematic Design UG, G
PROJECT TENETS
- 1. Nature as a Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
PROJECT TENETS
- 1. Nature as a Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
Zero-Net-Energy Zero-Net-Water Zero-Net-Waste
Our approach
- A Simple Formula:
Efficient Buildings & Site
+
Innovative Infrastructure
+
Demand Management
- use less energy
- use less water
- consume less materials
Student Housing West Drainage Arboretum
50% Schematic Design Current
1 2 4 3 5 6 7
PROJECT TENETS
- 1. Nature as a Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
RESTORATION OF NATURAL LANDSCAPE AND FOREST
HIGHER DENSITY BUILDINGS MIMIC FOREST EDGE
“EDGE” IS PERFORATED TO PROVIDE VISUAL RELIEF AND PHYSICAL CONNECTION TO FOREST
LOWER DENISTY BUILDINGS DEFINE COURTYARDS WITHIN THE FOREST “CLEARING”
AN INTEGRATED CIRCULATION ROUTE TIES UNDERGRADUATE AND GRADUATE BUILDINGS TOGETHER WITHIN THE LANDSCAPE
THE SOUTHERN COURTYARD IS ACTIVATED WITH PUBLIC “HUBS”; THE HUBS PROMOTE CONNECTION TO THE BROADER CAMPUS COMMUNITY
PORTER QUAD PORTER QUAD COWELL PLAZA COWELL PLAZA
PROJECT TENETS
- 1. Nature as a Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
1 2 4 3 5 6
PASSAGE CLEARING
H E L L E R D R
PASSAGE VIEWS CLEARING
1 2 4 3 5 6
LEGEND COMPONENTS
VIEWS PASSAGE CLEARING
LEGEND COMPONENTS
VIEWS PASSAGE CLEARING
TOPOGRAPHY
H E L L E R D R
1 2 4 3 5 6
PROJECT TENETS
- 1. Nature as a Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community
BUILDING 4 HUB BUILDING 5 HUB
UP DN UP UP DN UP UP DN UP DN DN DN UP DNUP DN UP
A-B1-001
Overall Gross Square Feet (OGSF)
Level Area B1 LOWER LVL 1 3316 B1 LEVEL 01 28000 B1 LEVEL 02 28000 B1 LEVEL 03 26190 B1 LEVEL 04 26190 B1 LEVEL 05 26190 B1 LEVEL 06 26190 B1 LEVEL 07 26190 B1 LEVEL 08 26190 216456
0A_Program Areas_Unit Accessibility Mix
Unit A - Studio Triple UG01 56 480 SF 3 168 3 1 4 1 55 Unit B - 2BR Shared UG22 30 817 SF 4 120 1 1 2 1 29 Unit C - 3BR Private UG31-ADA 7 719 SF 3 21 5 2 2 1 5 Unit D - 3BR Hybrid UG31 1 719 SF 4 4 1 1 Unit E - 4BR Private UG41 102 900 SF 4 408 4 4 Unit F - 4BR-Ext Private UG41B-ADA 1 1013 SF 4 4 1 1 Unit G - 4BR-Ext Hybrid UG41B 7 1013 SF 5 35 1 1 Unit H - 2BR CRE CRE21 2 817 SF 1 2 1 1 1 1 Building Total : 206 206 762 9 6 15 11 90 Date Issued For 3/23/18 100% SD UP DN UP UP DN UP UP DN UP DN DN DN UP DNUP DN UP
A-B1-001
Overall Gross Square Feet (OGSF)
Level Area B1 LOWER LVL 1 3316 B1 LEVEL 01 28000 B1 LEVEL 02 28000 B1 LEVEL 03 26190 B1 LEVEL 04 26190 B1 LEVEL 05 26190 B1 LEVEL 06 26190 B1 LEVEL 07 26190 B1 LEVEL 08 26190 216456
0A_Program Areas_Unit Accessibility Mix
Unit A - Studio Triple UG01 56 480 SF 3 168 3 1 4 1 55 Unit B - 2BR Shared UG22 30 817 SF 4 120 1 1 2 1 29 Unit C - 3BR Private UG31-ADA 7 719 SF 3 21 5 2 2 1 5 Unit D - 3BR Hybrid UG31 1 719 SF 4 4 1 1 Unit E - 4BR Private UG41 102 900 SF 4 408 4 4 Unit F - 4BR-Ext Private UG41B-ADA 1 1013 SF 4 4 1 1 Unit G - 4BR-Ext Hybrid UG41B 7 1013 SF 5 35 1 1 Unit H - 2BR CRE CRE21 2 817 SF 1 2 1 1 1 1 Building Total : 206 206 762 9 6 15 11 90 Date Issued For 3/23/18 100% SD
BUILDING 1
TYPICAL FLOOR
BUILDING 1
GROUND FLOOR
UG41
UG42 - EXTENDED
UG31
UG31 - ADA
UG22
UG01
CRE21
Team Commitment Project Evolution Project Tenets
- 1. Nature as Guide
- 2. Reducing Scale
- 3. Placemaking
- 4. Building Community