UBBC Facilities Renovation Proposal May 2018
Brief History of Our Calling • 2015 Vision for Ministry and Mission ‐ Themes: • “Welcoming to all” increase access, usability, and hospitality to all areas of church building • “Committing to a Sustainable Future” Develop a plan for building restoration • Calling out Facilities Study Committee – • Nicola Kiver, Cindy and Steve Carpenter, Steve Hathaway, Karen Moser, Ken Kline Smeltzer, Phil Jones and Dale Roth, Bonnie Kline Smeltzer ex officio • Charge to Committee : Coordinating Council called out a Building Renovation Committee to “develop a and recommend a staged plan or plans for future remodeling of the church building to help address access and usability.”
What Committee Wanted WMF to Assess in a Feasibility Study? • Primary needs: • Accessibility • Welcoming Environment • Gathering Area • Cohesive Administrative Area • Improved Kitchen • Secondary needs: • More meeting rooms • Better toilet rooms • Air conditioning • Better security • Improved interiors • Janitor closets
Limitations of Current Floor Plan • Accessibility issues i.e. restrooms, meeting rooms and offices • Welcoming environment: Narthex and Fellowship Room • Access to main floor Pastor’s and Church offices • Segmented program services between 2 levels • Out dated and in accessible kitchen • Current architectural deteriorations • Aging utility systems
Study Process • Formed several committees • Programming‐ looked at needs for current mission and services • Survey‐ researched local demographics and trends in Centre County and visited other churches • Finance‐ currently meeting to investigate capitol campaign • WMF presented initial renovation plans (within the existing building footprint) • These did not meet the vision for our church – too constricting‐ needed and expansion to address ‐ access to needed church areas and FLOW ‐ enhancement of welcoming space and relationship of critical church areas
Initial Engineering Assessment • Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • HVAC • Plumbing • Energy efficiencies • Communications: WiFi • Security • Windows and doors
Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • Add wifi • Add security system throughout building
Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition HVAC • Upgrade boilers and pumps to gain temperature control • New exhaust fans • Replace steam piping • Provide Air Conditioning in various areas • Radon Mitigation if required
Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Plumbing • Upgrades to domestic water piping, valves and pumps • Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks and other items • Replace water heater (especially if a shower will be installed)
Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Building Envelope • Replace Exterior Windows and Doors
Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition o • Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • Add wifi • Add security system throughout building • HVAC • Upgrade boilers and pumps to gain temperature control • New exhaust fans • Replace steam piping • Provide Air Conditioning in various areas • Radon Mitigation if required • Plumbing • Upgrades to domestic water piping, valves and pumps • Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks and other items • Replace water heater (especially if a shower will be installed) • Building Envelope: • Replace Exterior Windows and doors
Facility Renovations Proposal Main Floor • Dialog between Anna and Facilities Committee • Anna presents features on each floor plan • Committee describes our vision for uses for spaces • Present main floor as that space purpose will be primary focus for the congregation • New addition welcoming space • Relocated Fellowship Room and kitchen • New non‐commercial, warming kitchen • New elevator to service all floors from “F” Alley • Open elevator to connect ground level to main floor • Additional accessible restrooms • Improved circulation all on same level • Shower • Dir Christian Ed office • Widen Chancel Steps & Lower Chanel Platform • Storage in Fellowship Room
MAIN FLOOR
MAIN FLOOR Enhance Main Entry
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite
MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite Lower Chancel Platform, widen steps
UPPER FLOOR
UPPER FLOOR Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers
UPPER FLOOR Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers
LOWER FLOOR Preschool Tenant Choir Practice and Storage Room
LOWER FLOOR Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room
LOWER FLOOR Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room
Facility Renovations Proposal Main Floor Current Spaces Proposed Renovation Classrooms – 3 each New Fellowship Hall & Kitchen Meeting rooms – 1 only 1 only Offices – 2 each 3 each Accessible restrooms – None 4 each Uni‐sex restrooms – 2 each 1 only
Facility Renovations Proposal Lower Floor • All rental groups on same level with secure access • New accessible restrooms Current Spaces Proposed Renovation Classrooms – 4 each 7 each Accessible restrooms – 2 each 2 each Uni‐sex restrooms – 4 each 4 each Offices – 1 only 3 each