Brief History of Our Calling
- 2015 Vision for Ministry and Mission ‐ Themes:
- “Welcoming to all” increase access, usability, and hospitality to all areas of
church building
- “Committing to a Sustainable Future” Develop a plan for building
restoration
- Calling out Facilities Study Committee –
- Nicola Kiver, Cindy and Steve Carpenter, Steve Hathaway, Karen Moser, Ken Kline Smeltzer, Phil
Jones and Dale Roth, Bonnie Kline Smeltzer ex officio
- Charge to Committee: Coordinating Council called out a Building
Renovation Committee to “develop a and recommend a staged plan or plans for future remodeling of the church building to help address access and usability.”
What Committee Wanted WMF to Assess in a Feasibility Study?
- Primary needs:
- Accessibility
- Welcoming Environment
- Gathering Area
- Cohesive Administrative Area
- Improved Kitchen
- Secondary needs:
- More meeting rooms
- Better toilet rooms
- Air conditioning
- Better security
- Improved interiors
- Janitor closets
Limitations of Current Floor Plan
- Accessibility issues i.e. restrooms, meeting rooms and offices
- Welcoming environment: Narthex and Fellowship Room
- Access to main floor Pastor’s and Church offices
- Segmented program services between 2 levels
- Out dated and in accessible kitchen
- Current architectural deteriorations
- Aging utility systems
Study Process
- Formed several committees
- Programming‐ looked at needs for current mission and services
- Survey‐ researched local demographics and trends in Centre County and visited other
churches
- Finance‐ currently meeting to investigate capitol campaign
- WMF presented initial renovation plans (within the existing building
footprint)
- These did not meet the vision for our church – too constricting‐ needed and
expansion to address ‐ access to needed church areas and FLOW ‐ enhancement of welcoming space and relationship of critical church areas
Initial Engineering Assessment
- Electrical
- Lighting Upgrade‐ energy efficiency and to meet current building code
- Old wiring
- Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning
- Fire Alarm needs upgrade to meet current building code (horn strobes etc)
- HVAC
- Plumbing
- Energy efficiencies
- Communications: WiFi
- Security
- Windows and doors
Initial Engineering Assessment
- Many existing components are in good working order and some have been
(relatively) recently replaced.
- The list below includes upgrades to adhere with current codes, increase
energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition
Electrical
- Lighting Upgrade‐ energy efficiency and to meet current building code
- Old wiring
- Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning
- Fire Alarm needs upgrade to meet current building code (horn strobes etc)
- Add wifi
- Add security system throughout building
Initial Engineering Assessment
- Many existing components are in good working order and some have been
(relatively) recently replaced.
- The list below includes upgrades to adhere with current codes, increase
energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition HVAC
- Upgrade boilers and pumps to gain temperature control
- New exhaust fans
- Replace steam piping
- Provide Air Conditioning in various areas
- Radon Mitigation if required
Initial Engineering Assessment
- Many existing components are in good working order and some have been
(relatively) recently replaced.
- The list below includes upgrades to adhere with current codes, increase
energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Plumbing
- Upgrades to domestic water piping, valves and pumps
- Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks
and other items
- Replace water heater (especially if a shower will be installed)
Initial Engineering Assessment
- Many existing components are in good working order and some have been
(relatively) recently replaced.
- The list below includes upgrades to adhere with current codes, increase
energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition
Building Envelope
- Replace Exterior Windows and Doors
Initial Engineering Assessment
- Many existing components are in good working order and some have been (relatively) recently replaced.
- The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new
elevator or a building addition o
- Electrical
- Lighting Upgrade‐ energy efficiency and to meet current building code
- Old wiring
- Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning
- Fire Alarm needs upgrade to meet current building code (horn strobes etc)
- Add wifi
- Add security system throughout building
- HVAC
- Upgrade boilers and pumps to gain temperature control
- New exhaust fans
- Replace steam piping
- Provide Air Conditioning in various areas
- Radon Mitigation if required
- Plumbing
- Upgrades to domestic water piping, valves and pumps
- Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks and other items
- Replace water heater (especially if a shower will be installed)
- Building Envelope:
- Replace Exterior Windows and doors
Facility Renovations Proposal Main Floor
- Dialog between Anna and Facilities Committee
- Anna presents features on each floor plan
- Committee describes our vision for uses for spaces
- Present main floor as that space purpose will be primary focus for the congregation
- New addition welcoming space
- Relocated Fellowship Room and kitchen
- New non‐commercial, warming kitchen
- New elevator to service all floors from “F” Alley
- Open elevator to connect ground level to main floor
- Additional accessible restrooms
- Improved circulation all on same level
- Shower
- Dir Christian Ed office
- Widen Chancel Steps & Lower Chanel Platform
- Storage in Fellowship Room
MAIN FLOOR
MAIN FLOOR
Enhance Main Entry
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite
MAIN FLOOR
Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite Lower Chancel Platform, widen steps
UPPER FLOOR
UPPER FLOOR
Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers
UPPER FLOOR
Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers
LOWER FLOOR
Preschool Tenant Choir Practice and Storage Room
LOWER FLOOR
Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room
LOWER FLOOR
Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room
Facility Renovations Proposal Main Floor
Current Spaces Proposed Renovation Classrooms – 3 each New Fellowship Hall & Kitchen Meeting rooms – 1 only 1 only Offices – 2 each 3 each Accessible restrooms – None 4 each Uni‐sex restrooms – 2 each 1 only
Facility Renovations Proposal Lower Floor
- All rental groups on same level with secure access
- New accessible restrooms
Current Spaces Proposed Renovation Classrooms – 4 each 7 each Accessible restrooms – 2 each 2 each Uni‐sex restrooms – 4 each 4 each Offices – 1 only 3 each
Overall Square Footage Summary
Existing Building: 18,500 GSF
Sub‐Basement: 790 GSF Lower Level: 7820 GSF Main Level: 7415 GSF Upper Level: 2475 GSF
Proposed Additions: 3840 GSF
Lower Level: 1840 GSF Main Level: 1840 GSF Upper Level: 160 GSF
Total Square Footage: 22,340 GSF
Facility Renovations Proposal Upper Floor
- Classrooms and/or meeting rooms
- Accessible by elevator
- Optional new courtyard addition
Current Spaces Proposed Renovation Classrooms/meeting rooms – 3 each 3 each Offices – Director Christian Ed. None Restrooms – none Accessible – 1 only
Upper level floor plan
Questions and Clarifications on the Proposed Renovations
Preliminary Project Cost Estimates
- Renovations
- Upgrade architectural features ‐ (flooring, finishes, move walls, non‐
commercial kitchen, windows, chancel platform)
- Electrical – (interior and exterior lighting, wiring, devices, fire alarm
- Plumbing – (replace pipes and valves, pumps, fixtures, ADA bathrooms, water
heater, shower)
- HVAC – (boiler, exhaust, replace steam piping, air conditioning, radon, replace
30 plumbing fixtures) Renovation Budget $1.5 ‐ $1.9 M
Preliminary Project Cost Estimates
- Additions
- Burrowes St. addition (2 flrs)
Estimated costs ‐ $700‐$750,000
- F Alley addition w/ elevator (3 flrs)
Estimated costs ‐ $230‐ $260,000
- Site work
Estimated costs ‐ $ 40‐ $50,000
Total New Construction Estimated Cost: $970‐ $1.1 M Total Estimated Project costs with soft costs (fees, surveys etc): $3.5 M
Where Does the Project Go From Here?
- Reflect on information and proposal presented May 20
- Write thoughts and recommendations and return to Committee by June 3
- Attend a 2nd Proposal Presentation meeting on June 10
- Deliberate Project Proposal over summer
- Fall 2018, congregation to reconvene to discern next steps
Reflections on Proposed Renovations
Write your comments and questions.