ubbc facilities renovation proposal may 2018 brief
play

UBBC Facilities Renovation Proposal May 2018 Brief History of Our - PowerPoint PPT Presentation

UBBC Facilities Renovation Proposal May 2018 Brief History of Our Calling 2015 Vision for Ministry and Mission Themes: Welcoming to all increase access, usability, and hospitality to all areas of church building


  1. UBBC Facilities Renovation Proposal May 2018

  2. Brief History of Our Calling • 2015 Vision for Ministry and Mission ‐ Themes: • “Welcoming to all” increase access, usability, and hospitality to all areas of church building • “Committing to a Sustainable Future” Develop a plan for building restoration • Calling out Facilities Study Committee – • Nicola Kiver, Cindy and Steve Carpenter, Steve Hathaway, Karen Moser, Ken Kline Smeltzer, Phil Jones and Dale Roth, Bonnie Kline Smeltzer ex officio • Charge to Committee : Coordinating Council called out a Building Renovation Committee to “develop a and recommend a staged plan or plans for future remodeling of the church building to help address access and usability.”

  3. What Committee Wanted WMF to Assess in a Feasibility Study? • Primary needs: • Accessibility • Welcoming Environment • Gathering Area • Cohesive Administrative Area • Improved Kitchen • Secondary needs: • More meeting rooms • Better toilet rooms • Air conditioning • Better security • Improved interiors • Janitor closets

  4. Limitations of Current Floor Plan • Accessibility issues i.e. restrooms, meeting rooms and offices • Welcoming environment: Narthex and Fellowship Room • Access to main floor Pastor’s and Church offices • Segmented program services between 2 levels • Out dated and in accessible kitchen • Current architectural deteriorations • Aging utility systems

  5. Study Process • Formed several committees • Programming‐ looked at needs for current mission and services • Survey‐ researched local demographics and trends in Centre County and visited other churches • Finance‐ currently meeting to investigate capitol campaign • WMF presented initial renovation plans (within the existing building footprint) • These did not meet the vision for our church – too constricting‐ needed and expansion to address ‐ access to needed church areas and FLOW ‐ enhancement of welcoming space and relationship of critical church areas

  6. Initial Engineering Assessment • Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • HVAC • Plumbing • Energy efficiencies • Communications: WiFi • Security • Windows and doors

  7. Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • Add wifi • Add security system throughout building

  8. Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition HVAC • Upgrade boilers and pumps to gain temperature control • New exhaust fans • Replace steam piping • Provide Air Conditioning in various areas • Radon Mitigation if required

  9. Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Plumbing • Upgrades to domestic water piping, valves and pumps • Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks and other items • Replace water heater (especially if a shower will be installed)

  10. Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition Building Envelope • Replace Exterior Windows and Doors

  11. Initial Engineering Assessment • Many existing components are in good working order and some have been (relatively) recently replaced. • The list below includes upgrades to adhere with current codes, increase energy efficiency and/ or would be triggered by new demands on the building ie. Air Conditioning, A new elevator or a building addition o • Electrical • Lighting Upgrade‐ energy efficiency and to meet current building code • Old wiring • Aging Power Distribution – needs upgrades/ replaced for new uses such as air conditioning • Fire Alarm needs upgrade to meet current building code (horn strobes etc) • Add wifi • Add security system throughout building • HVAC • Upgrade boilers and pumps to gain temperature control • New exhaust fans • Replace steam piping • Provide Air Conditioning in various areas • Radon Mitigation if required • Plumbing • Upgrades to domestic water piping, valves and pumps • Replace plumbing fixtures (especially those in ADA bathrooms) and add janitor sinks and other items • Replace water heater (especially if a shower will be installed) • Building Envelope: • Replace Exterior Windows and doors

  12. Facility Renovations Proposal Main Floor • Dialog between Anna and Facilities Committee • Anna presents features on each floor plan • Committee describes our vision for uses for spaces • Present main floor as that space purpose will be primary focus for the congregation • New addition welcoming space • Relocated Fellowship Room and kitchen • New non‐commercial, warming kitchen • New elevator to service all floors from “F” Alley • Open elevator to connect ground level to main floor • Additional accessible restrooms • Improved circulation all on same level • Shower • Dir Christian Ed office • Widen Chancel Steps & Lower Chanel Platform • Storage in Fellowship Room

  13. MAIN FLOOR

  14. MAIN FLOOR Enhance Main Entry

  15. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms

  16. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms

  17. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms

  18. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms

  19. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry

  20. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite

  21. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite

  22. MAIN FLOOR Enhance Main Entry New Bright Welcoming Area/ gathering space ‐ New meeting room ‐ New bathrooms New Fellowship Hall ‐ With storage ‐ New kitchen ‐ New Bathrooms Enhance Office Entry Enhance Office Suite Lower Chancel Platform, widen steps

  23. UPPER FLOOR

  24. UPPER FLOOR Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers

  25. UPPER FLOOR Enhance Entry ‐ Elevator ‐ New bathroom ‐ Partition Wall dividers

  26. LOWER FLOOR Preschool Tenant Choir Practice and Storage Room

  27. LOWER FLOOR Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room

  28. LOWER FLOOR Preschool Tenant ‐ Separate entrances Choir Practice and Storage Room

  29. Facility Renovations Proposal Main Floor Current Spaces Proposed Renovation Classrooms – 3 each New Fellowship Hall & Kitchen Meeting rooms – 1 only 1 only Offices – 2 each 3 each Accessible restrooms – None 4 each Uni‐sex restrooms – 2 each 1 only

  30. Facility Renovations Proposal Lower Floor • All rental groups on same level with secure access • New accessible restrooms Current Spaces Proposed Renovation Classrooms – 4 each 7 each Accessible restrooms – 2 each 2 each Uni‐sex restrooms – 4 each 4 each Offices – 1 only 3 each

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.