  2. Eligibility Any environmental mitigation activity , including pollution prevention and pollution abatement activities and mitigation to address stormwater management , control, and water pollution prevention or abatement related to highway construction or due to highway runoff.

  3. Program Parameters  Federal Highway Administ rat ion (FHWA) funds, ~$2.2M  $300,000 cap on federal funding for individual proj ect s at 80% federal / 20% local funding split .  80% / 20% for scoping st udies (which usually cap-off at $50k t ot al)  Local mat ch t ypically cash mat ch  No S t at e funding t o supplement Federal (as was available for t he Municipal Highway and S t ormwat er Mit igat ion Program)  Applicat ions accept ed for scoping/ planning, design and const ruct ion, equipment purchases  No design only proj ects  Design and const ruct ion proj ect s must advance t o complet ion or risk chance of payback  Reimbursement program  Municipality pays for proj ect costs and submits reimbursement request to VTrans

  4. Program Funding PROJECT EXAMPLE #1 Total Proj ect Cost: $375,000 50% Highway Runoff, 50% Other S ources • Grant Amount: $150,000 Federal , $37,500 Local Cash Match • Grant total ($187,500) will be for 50% of total proj ect cost • Remainder of the total amount covered by the municipality PROJECT EXAMPLE #2 Total Proj ect Cost: $375,000 100% Highway Runoff, 0% Other S ources • Grant Amount: $300,000 Federal , $75,000 Local Cash Match • Grant total ($375,000) will be for 100% of total proj ect cost

  5. Potentially Eligible Proj ect Types   Planning S tudies Check Dams  S tormwater Inventories  S wirl S eparators  Flow Restoration Plans  Permeable Pavers  Phosphorus Control Planning  Infiltration Basins  S alt/ S and S heds  Gravel Wetlands  Bank S tabilization  S ubsurface Detention S ystems  Culvert Replacement/ Re-sizing  Bio Filters  S tream Bank S tabilization  Bio Retention S ystems  Detention Ponds

  6. Proj ect Development Process  Municipal Proj ect Manager S election  Design Engineer S election  Conceptual Plan Development/ Review  National Environmental Policy Act (NEP A) Approval  Preliminary Plan Development/ Review  Right-of-Way (ROW) Plan Development and Clearance  Final Plan Development/ Review  Proj ect Advertisement, Bidding, and Award  Construction and Oversight  Maintenance Typical project takes 2-4 years to complete

  7. Municipal Proj ect Manager  Proj ects where municipalities have procured a proj ect specific MPM have typically been much more successful  Request For Proposals (RFP)  At-the-Ready (ATR) S election Option  May assign a municipal employee  Proposed MPM is subj ect to VTrans approval  Required knowledge base:  Knowledge of FA project development process!  Can read engineering plans  Organized  Efficient in communication and documentation  Time commitment of up to 40 hours per week

  8. At-the-Ready S election  Available for MPM, Design Engineers, and Construction Inspectors  VTrans has completed step one of two of the QBS process  Pick from list of pre-qualified consultants  Will still need to rank consultants and negotiate and contract with them

  9. Design Engineer S election  RFQ/ RFP or ATR Conceptual Plan Development/ Review  Initial design  Public involvement  Requires 3 week Agency review

  10. National Environmental Policy Act (NEP A)  Typically 6 months to complete Preliminary Plan Development/ Review  Requires 3 week Agency review ROW Plan Development/ Clearance  Highly variable in schedule duration  If no ROW acquisitions required for construction/ maintenance, 1 month to clear  If acquisitions are required  S imple: 6-12 months  Complicated 1- several years

  11. Final Plan Development/ Review  Requires 3 week Agency review Proj ect Advertisement, Bidding and Award  Use of VTrans – Municipal Assistance Bureau standard bid documents  Low bid sealed bid process  Three week minimum advertisement period Construction and Oversight  Municipality must provide oversight/ resident engineering services  ATR or RFP/ RFQ  Materials Testing and Acceptance Maintenance  Municipality must maintain proj ect

  12. Funding Requirements  Buy America applies to all proj ects (steel & iron products, including coatings)  Davis Bacon Federal Wage Rates  Proprietary Products not allowed without Public Interest Finding  Proj ect must be designed and constructed in accordance with all federal/ state/ local permits and regulations

  13. Examples of Candidate Proj ects  Construction cost >$250k  Requires fully engineered design  Treat substantial highway runoff  Non-highway runoff eligible, but proj ects that treat a higher portion of highway runoff are more likely to be awarded  Clear water quality benefit  Clearly fits within the program’s eligibility requirements  Pollution prevention and pollution abatement activities  Mitigation to address stormwater management, control New bridge, Duxbury  Water pollution prevention or abatement related to highway construction or due to highway runoff Large culvert, Cambridge Retention pond, S o. Burlington Gravel wetland, S t. Albans

  14. Proj ects For Other Programs  No engineering required  S mall construction cost <$250k  Municipal crews plan to complete work S tone header, Cambridge  Town will not be able to come up with 20% cash match Ditching, S t. Johnsbury Bank stabilization, Bloomfield Gravel resurfacing, Westfield

  15. S uccessful Applications Include:  Maps that clearly depict proj ect location  Clear pictures of the problem  Write on pictures if it’s not clear  If pictures cannot be taken, clearly describe the problem  Example: If a closed system has failed  Is it flooding basement s?  Are t here sinkholes in t he st reet ?  How oft en does t his happen and how much sediment and pollut ant s are ent ering t he wat er?  Include detailed description of solution  If available, include scoping reports and any preliminary engineering designs  All questions are fully and clearly answered

  16. Application Requirements  Letter of S upport from Regional Planning Commission  If within S tate ROW:  Correspondence with VTrans District Transportation Administrator  Considerations for proj ects within the ROW may include:  Culverts/ drainage  S ignage  Driveway accesses  Maintenance  Comingling of stormwater  Lighting/ security fences  Guardrail

  17. How to Apply: http://vtrans.vermont.gov/ , click on ‘ Highways’ in left border

  18. Click on ‘ Local Proj ects’

  19. http:/ / vtrans.vermont.gov/ highway/ local-proj ects/ t ransport-alt

  20. S FY 2019 Transportation Alternatives Program – Grant Application Cost Estimate

  21. Maps

  22. S ubmission Format  Electronically or hard copy by mail  If electronic submission, PDF required S cott Robertson. P .E. VTrans Municipal Assistance Bureau 2178 Airport Road Barre, VT 05641 scott.robertson@ vermont.gov  Organization Application form 1. Map 2. Pictures 3. S coping study/ engineering plans 4. Letters of S upport 5. Any other misc. supporting documentation 6.

  23. Program S chedule  August 24th, 2018 – Program announcement and distribution of application and general information  TAP Application Webinars will be held: eptember 4 th at 6:00pm via. S  S kype for Business ( Join Skype Meeting) petember 6 th at 1:00pm via. S  S kype for Business ( Join Skype Meeting)  October 17th, applications due to VTrans  November – December, potential site visits  January – Early February, selection committee evaluations  February 20th, proj ect awards announced

  24. Questions? Atlanta, GA 4 t h Ward Park Lancaster, P A Plum & Walnut S t.

  25. Applications due October 17th, 2018 Questions/ F AQ’s posted at: http:/ / vtrans.vermont.gov/ highway/ local- proj ects/ transport-alt S cott Robertson, PE VTrans Municipal Assistance Bureau S cott.Robertson@ Vermont.gov (802) 793-2395

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.