mari on count y ut i l i t i e s mcu
play

MARI ON COUNT Y UT I L I T I E S (MCU) F Y2020 F DE P - PowerPoint PPT Presentation

MARI ON COUNT Y UT I L I T I E S (MCU) F Y2020 F DE P Spring s F unding Pro je c ts MCU PROJE CT PRI ORI T Y 1. No rthwe st Re g io na l Wa ste wa te r T re a tme nt F a c ility I mpro ve me nts 2. US27/ NW 70th Ave Se


  1. MARI ON COUNT Y UT I L I T I E S (MCU) F Y2020 F DE P Spring s F unding Pro je c ts

  2. MCU PROJE CT PRI ORI T Y 1. No rthwe st Re g io na l Wa ste wa te r T re a tme nt F a c ility I mpro ve me nts 2. US27/ NW 70th Ave Se ptic to Se we r 3. Oa k Be nd/ I -75 Wa te r Qua lity I mpro ve me nt Pro je c t 4. Sta te Ro a d 200 Se ptic to Se we r 5. Pa c ka g e Wa ste wa te r Pla nt Re mo va l Pro g ra m

  3. NORT HWE ST RE GI ONAL WAST E WAT E R T RE AT ME NT F ACI L I T Y I MPROVE ME NT S Mario n Co unty U tilitie s – Prio rity Ranking # 1

  4. PROJE CT L OCAT I ON Pro je c t is within the R ainbow Spr ings BMAP

  5. PROJE CT DE SCRI PT I ON • • Upg ra de e xisting WWT F to AWT sta nda rds Pro je c t c o nsists o f c o nstruc ting : • • Will tre a t to 3 mg / L o f T N Ne w 1.5 MGD T re a tme nt Pro c e ss with b io lo g ic a l nutrie nt re mo va l • I nc re a se c a pa c ity fro m 0.2 MGD to 1.5 MGD • (2) 0.75 MGD Cla rifie rs • Will a llo w future c o nne c tio ns o f pa c ka g e pla nts • (2) F lo w Splitting Struc ture s fo r future o xida tio n a nd se ptic syste ms ditc he s • Pro je c t will suppo rt the BMAP g o a ls b y re duc ing nitro g e n • 0.5 MG E q ua liza tio n Ba sin lo a ding to the Ra inb o w Rive r spring she d a nd a llo w fo r • Ne w He a dwo rks a nd Sc re e ning Struc ture future re mo va l o f se ptic syste ms a nd pa c ka g e pla nts. • Ne w De wa te ring Are a • Ne w RAS/ WAS Pumping Syste m • Ne w MCC Ro o m • Ne w Auto ma tic Ge ne ra to r • Ne w E fflue nt Pump Sta tio n • Pro je c t c o nsists o f re tro fitting : • E xisting L ift Sta tio n • E xisting Sa nd F ilte r with Disc F ilte rs (2.0 MGD c a pa c ity) • E xpa nsio n o f E xisting Chlo rine Co nta c t Ba sins to 2.0 MGD • E xisting Struc ture will b e c o nve rte d to a n a e ro b ic dig e ste r o r sludg e ho lding ta nk. Pre limina ry Co nc e pt Pla n

  6. PROJE CT T I ME L I NE AND F UNDI NG • De sign (Now – 9/ 30/ 2019) T otal Pr oje c t Cost = $15,383,033 • Pre limina ry E ng ine e ring Re po rt – I n Constr uc tion Cost = $13,500,000 Pro g re ss • 30% De sig n – 3 mo nths • 60% De sig n – 3 mo nths • MCU Sha re (De sig n + 25% Co nstruc tio n) • 90% De sig n – 2 mo nths • Prio r F unding = $199,834 • Pro po se d F ina l De sig n – 1 mo nth • F Y2019 F unding = $1,683,199 • Re que st for • F Bids (11/ 15/ 2019 – 4/ 1/ 2020) Y2020 Pro po se d F unding = $3,375,000 • RF B Adve rtise me nt • F DE P Sta te Spring s F unding (50% • RF B E va lua tio n a nd Awa rd – 4 mo nths Co nstruc tio n) • NT P to Co ntra c to r – 1.5 mo nths • F Y2020 Pro po se d F unding = $6,750,000 • Constr • SWF uc tion (5/ 1/ 2020 – 11/ 30/ 2021) WMD CF I F unding (25% Co nstruc tio n) • Co mme nc e Co nstruc tio n • F Y2020 Pro po se d F unding = $3,375,000 • Sub sta ntia l Co mple tio n – 5 mo nths • Co nstruc tio n Co mple te – 2 mo nths

  7. PROJE CT BE NE F I T S • Nitro g e n Re duc tio n: 1,774 lb o f T N/ yr • Co st e ffe c tive ne ss: $293 / lb o f T N • Ma rio n Co unty is c o mmitte d to this pro je c t • Ab ility to ha ndle future flo ws fro m ne w de ve lo pme nt, c o nne c tio n o f pa c ka g e pla nts, a nd c o nne c tio n o f se ptic ta nks • Co unty Ordina nc e in pla c e to me e t 3.0 mg / L T N

  8. US27/ US70T H AVE SE PT I C T O SE WE R Mario n Co unty U tilitie s – Prio rity Ranking # 2

  9. PROJE CT L OCAT I ON Pro je c t is within the R ainbow Spr ings BMAP

  10. PROJE CT DE SCRI PT I ON • T he e xisting pla za o n the so uthe a st side o f the inte rse c tio n is c urre ntly o n a se ptic syste m a nd ha s 16 units. he Co unty ha s a 16” fo rc e ma in o n the we st side o f NW 70 th Ave nue . • T • Purpo se o f the pro je c t is to c o nne c t the e xisting pla za to the Co unty’ s c e ntra lize d wa ste wa te r syste m a nd a b a ndo n the ir se ptic syste m. • Pro je c t will inc lude : • Co nstruc tio n o f a n o n-site lift sta tio n • Co nstruc tio n o f a g ra vity ne two rk • Co nstruc tio n o f a fo rc e ma in • Ab a ndo nme nt o f e xisting se ptic syste m • T he re is a sig ne d a g re e me nt in pla c e fo r the pla za to c o nne c t to Ma rio n Co unty. • Pro je c t will suppo rt the BMAP g o a ls b y re duc ing nitro g e n lo a ding to the Ra inb o w Rive r spring she d b y re mo ving the se ptic syste m.

  11. PROJE CT T I ME L I NE AND F UNDI NG • De sign (10/ 1/ 2019 – 3/ 27/ 2020) T otal Pr oje c t Cost = $558,972 • 30% De sig n – 2 mo nths • 60% De sig n – 1.5 mo nths • T hird Pa rty Sha re (25% Co nstruc tio n) • 90% De sig n – 1 mo nth • F Y2020 Pro po se d F unding = $139,743 • Pro po se d F ina l De sig n – 1.5 mo nths • F DE P Sta te Spring s F unding (50% • Re que st for Bids (3/ 30/ 2020 – 6/ 29/ 2020) Co nstruc tio n) • RF B Adve rtise me nt – 2 mo nths • F Y2020 Pro po se d F unding = $279,486 • RF B E va lua tio n a nd Awa rd – 0.5 mo nths • SWF WMD CF I F unding (25% Co nstruc tio n) • NT P to Co ntra c to r – 0.5 mo nths • F Y2020 Pro po se d F unding = $139,743 • Constr uc tion (7/ 13/ 2020 – 1/ 29/ 2021) • Co mme nc e Co nstruc tio n • Sub sta ntia l Co mple tio n – 5 mo nths • Co nstruc tio n Co mple te – 1.5 mo nths

  12. PROJE CT BE NE F I T S • Nitro g e n Re duc tio n: 382 lb o f T N/ yr • AWT Nitro g e n Co nc e ntra tio n: 3 mg / L T N • Wa te r Ma de Ava ila b le : 5,420 g pd o f re c la im wa te r • Co st E ffe c tive ne ss: $49 / lb o f T N • Ma rio n Co unty is c o mmitte d to this pro je c t • De ve lo pe r’ s Ag re e me nt fo r c o nne c tio n to se we r ha s b e e n sig ne d

  13. OAK BE ND/ I -75 WAT E R QUAL I T Y I MPROVE ME NT PROJE CT F DOT I-75 Re st Ar e a Mario n Co unty U tilitie s – Prio rity Ranking # 3 Oak Be nd MHP

  14. PROJE CT L OCAT I ON Pro je c t is within the R ainbow Spr ings BMAP and Silve r Spr ings BMAPs Clo se st PF A is Silve r Spr ings

  15. PROJE CT DE SCRI PT I ON • T wo WW pa c ka g e pla nts: • Oa k Be nd Mo b ile Ho me Pa rk • F DOT I -75 Re st Are a • Bo th within Silve r Spring s BMAP • Co unty Co nne c tio n - Oa k Run WWT F • WWT F within Ra inb o w Spring s BMAP • Pro je c t will inc lude : • T wo o n-site lift sta tio ns • 13,000 L F 6-inc h F M; 5,700 L F 8-inc h F M • Ab a ndo nme nt o f e xisting pa c ka g e pla nts • Pro je c t will suppo rt the BMAP g o a ls b y re duc ing nitro g e n lo a ding to the Silve r Spring s spring she d b y re mo ving the pa c ka g e pla nts.

  16. PROJE CT T I ME L I NE AND F UNDI NG T otal Pr oje c t Cost = $2,172,820 • De sign (10/ 1/ 2019 – 9/ 30/ 2020) • 30% De sig n – 3 mo nths • T hird Pa rty Sha re • 60% De sig n – 3 mo nths • F Y2020 Pro po se d F unding = $0 • 90% De sig n – 2 mo nths • F Y2021 Pro po se d F unding = $1,013,980 • Pro po se d F ina l De sig n – 1 mo nth • F DOT : $627,700 • Constr uc tion (10/ 1/ 2020 – 9/ 30/ 2021) • E q uity: $386,280 • Co mme nc e me nt – No ve mb e r 2020 • F DE P Sta te Spring s F unding • Sub sta ntia l Co mple tio n – Se pte mb e r • F 2021 Y2020 Pro po se d F unding = $257,520 • F Y2021 Pro po se d F unding = $901,320

  17. PROJE CT BE NE F I T S • T re a tme nt @ Oa k Run WWT F > WW PP • Re duc e N lo a ding to Silve r Spring s BMAP a re a b y 766 lb -T N/ yr • Up to 12,500 g pd o f a dditio na l re c la ime d wa te r a va ila b le • Pe r SWF WMD, the c o st e ffe c tive ne ss o f the pro je c t is a ppro xima te ly $67 / lb o f T N • Re mo va l o f 242 se ptic ta nks • Up to 850 a dditio na l se ptic ta nks

  18. ST AT E ROAD 200 SE PT I C T O SE WE R Mario n Co unty U tilitie s – Prio rity Ranking # 4

  19. PROJE CT L OCAT I ON Pro je c t is within the R ainbow Spr ings BMAP

  20. PROJE CT DE SCRI PT I ON • T he Co unty ha s a 20” fo rc e ma in o n Sta te Ro a d 200 a t the inte rse c tio n o f SW 95 th Stre e t Ro a d. T he flo ws fro m this lo c a tio n g o to the Oa k Run WWT F within the Ra inb o w Spring s BMAP. • T he pro je c t will c o nne c t the e xisting 35 de ve lo pme nts to the 12” fo rc e ma in tha t will b e c o nstruc te d a lo ng the no rthwe st side o f SR200. • Pro je c t will inc lude : • Co nstruc tio n o f o n-site g rinde r sta tio ns • Co nstruc tio n o f fo rc e ma ins • Ab a ndo nme nt o f e xisting se ptic syste ms • Pro je c t will suppo rt the BMAP g o a ls b y re duc ing nitro g e n lo a ding to the Ra inb o w Rive r spring she d b y re mo ving the se ptic syste ms.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend