MARI ON COUNT Y UT I L I T I E S (MCU)
F Y2020 F DE P Spring s F unding Pro je c ts
MARI ON COUNT Y UT I L I T I E S (MCU) F Y2020 F DE P - - PowerPoint PPT Presentation
MARI ON COUNT Y UT I L I T I E S (MCU) F Y2020 F DE P Spring s F unding Pro je c ts MCU PROJE CT PRI ORI T Y 1. No rthwe st Re g io na l Wa ste wa te r T re a tme nt F a c ility I mpro ve me nts 2. US27/ NW 70th Ave Se
F Y2020 F DE P Spring s F unding Pro je c ts
1. No rthwe st Re g io na l Wa ste wa te r T re a tme nt F a c ility I mpro ve me nts 2. US27/ NW 70th Ave Se ptic to Se we r 3. Oa k Be nd/ I
mpro ve me nt Pro je c t 4. Sta te Ro a d 200 Se ptic to Se we r 5. Pa c ka g e Wa ste wa te r Pla nt Re mo va l Pro g ra m
Mario n Co unty U tilitie s – Prio rity Ranking # 1
Pro je c t is within the
R ainbow Spr ings BMAP
F to AWT sta nda rds
N
nc re a se c a pa c ity fro m 0.2 MGD to 1.5 MGD
a nd se ptic syste ms
lo a ding to the Ra inb o w Rive r spring she d a nd a llo w fo r future re mo va l o f se ptic syste ms a nd pa c ka g e pla nts.
re a tme nt Pro c e ss with b io lo g ic a l nutrie nt re mo va l
lo w Splitting Struc ture s fo r future o xida tio n ditc he s
q ua liza tio n Ba sin
fflue nt Pump Sta tio n
xisting L ift Sta tio n
xisting Sa nd F ilte r with Disc F ilte rs (2.0 MGD c a pa c ity)
xpa nsio n o f E xisting Chlo rine Co nta c t Ba sins to 2.0 MGD
xisting Struc ture will b e c o nve rte d to a n a e ro b ic dig e ste r o r sludg e ho lding ta nk. Pre limina ry Co nc e pt Pla n
ng ine e ring Re po rt – I n Pro g re ss
ina l De sig n – 1 mo nth
Bids (11/ 15/ 2019 – 4/ 1/ 2020)
B Adve rtise me nt
B E va lua tio n a nd Awa rd – 4 mo nths
P to Co ntra c to r – 1.5 mo nths
uc tion (5/ 1/ 2020 – 11/ 30/ 2021)
T
Constr uc tion Cost = $13,500,000
unding = $199,834
Y2019 F unding = $1,683,199
Y2020 Pro po se d F unding = $3,375,000
DE P Sta te Spring s F unding (50% Co nstruc tio n)
Y2020 Pro po se d F unding = $6,750,000
WMD CF I F unding (25% Co nstruc tio n)
Y2020 Pro po se d F unding = $3,375,000
N/ yr
N
pro je c t
de ve lo pme nt, c o nne c tio n o f pa c ka g e pla nts, a nd c o nne c tio n o f se ptic ta nks
3.0 mg / L T N
Mario n Co unty U tilitie s – Prio rity Ranking # 2
Pro je c t is within the
R ainbow Spr ings BMAP
he e xisting pla za o n the so uthe a st side o f the inte rse c tio n is c urre ntly o n a se ptic syste m a nd ha s 16 units.
he Co unty ha s a 16” fo rc e ma in o n the we st side o f NW 70th Ave nue .
wa ste wa te r syste m a nd a b a ndo n the ir se ptic syste m.
he re is a sig ne d a g re e me nt in pla c e fo r the pla za to c o nne c t to Ma rio n Co unty.
Rive r spring she d b y re mo ving the se ptic syste m.
ina l De sig n – 1.5 mo nths
Bids (3/ 30/ 2020 – 6/ 29/ 2020)
B Adve rtise me nt – 2 mo nths
B E va lua tio n a nd Awa rd – 0.5 mo nths
P to Co ntra c to r – 0.5 mo nths
uc tion (7/ 13/ 2020 – 1/ 29/ 2021)
T
hird Pa rty Sha re (25% Co nstruc tio n)
Y2020 Pro po se d F unding = $139,743
DE P Sta te Spring s F unding (50% Co nstruc tio n)
Y2020 Pro po se d F unding = $279,486
WMD CF I F unding (25% Co nstruc tio n)
Y2020 Pro po se d F unding = $139,743
N/ yr
Nitro g e n Co nc e ntra tio n: 3 mg / L T N
re c la im wa te r
ffe c tive ne ss: $49/ lb o f T N
pro je c t
to se we r ha s b e e n sig ne d
Mario n Co unty U tilitie s – Prio rity Ranking # 3 F DOT I-75 Re st Ar e a Oak Be nd MHP
Pro je c t is within the
R ainbow Spr ings BMAP and Silve r Spr ings BMAPs
Clo se st PF A is Silve r
Spr ings
wo WW pa c ka g e pla nts:
DOT I
F
F within Ra inb o w Spring s BMAP
wo o n-site lift sta tio ns
F 6-inc h F M; 5,700 L F 8-inc h F M
re duc ing nitro g e n lo a ding to the Silve r Spring s spring she d b y re mo ving the pa c ka g e pla nts.
ina l De sig n – 1 mo nth
uc tion (10/ 1/ 2020 – 9/ 30/ 2021)
2021
T
hird Pa rty Sha re
Y2020 Pro po se d F unding = $0
Y2021 Pro po se d F unding = $1,013,980
DOT : $627,700
q uity: $386,280
DE P Sta te Spring s F unding
Y2020 Pro po se d F unding = $257,520
Y2021 Pro po se d F unding = $901,320
re a tme nt @ Oa k Run WWT F > WW PP
BMAP a re a b y 766 lb -T N/ yr
re c la ime d wa te r a va ila b le
WMD, the c o st e ffe c tive ne ss o f the pro je c t is a ppro xima te ly $67/ lb o f T N
Mario n Co unty U tilitie s – Prio rity Ranking # 4
Pro je c t is within the
R ainbow Spr ings BMAP
he Co unty ha s a 20” fo rc e ma in o n Sta te Ro a d 200 a t the inte rse c tio n o f SW 95th Stre e t Ro a d. T he flo ws fro m this lo c a tio n g o to the Oa k Run WWT F within the Ra inb o w Spring s BMAP.
he pro je c t will c o nne c t the e xisting 35 de ve lo pme nts to the 12” fo rc e ma in tha t will b e c o nstruc te d a lo ng the no rthwe st side o f SR200.
Ra inb o w Rive r spring she d b y re mo ving the se ptic syste ms.
a b o ut c o nne c tio n to se we r
c o nne c tio n – 3 mo nths
ina l De sig n – 1 mo nth
Bids (1/ 17/ 2020 – 5/ 25/ 2020)
B Adve rtise me nt – 3 mo nths
B E va lua tio n a nd Awa rd – 0.5 mo nths
P to Co ntra c to r – 0.5 mo nths
uc tion (6/ 1/ 2020 – 1/ 8/ 2021)
T
fo rc e ma in)
unding = $103,241
Y2019 F unding = $1,285,855
Y2020 Pro po se d F unding = $350,000
DE P Sta te Spring s F unding
Y2020 Pro po se d F unding = $1,618,750
WMD CF
IF
unding
Y2020 Pro po se d F unding = $656,250
N/ yr (a ssuming a n e stima te d o ne E RC pe r pa rc e l)
F e fflue nt T N: 5.8 mg / L
wa te r
ffe c tive ne ss: $394/ lb o f T N
fo rc e ma in a lo ng SR200
Ma rio n Co unty re q uire s ne w de ve lo pme nt to c o nne c t to wa ste wa te r if fa c ilitie s a re a va ila b le
de ve lo pme nt a nd po te ntia l se ptic -to -se we r pro je c ts
Mario n Co unty U tilitie s – Prio rity Ranking # 5
Pro je c t is within the
R ainbow Spr ings BMAP
he Co unty ha s e xisting infra struc ture tha t wo uld a llo w 6 pa c ka g e wa ste wa te r pla nts to b e a b a ndo ne d.
he pro je c t will c o nne c t 6 de ve lo pme nts to the Co unty’ s c e ntra lize d se we r syste m. F lo ws fro m this pro je c t wo uld g o to e ithe r the No rthwe st Re g io na l WWT F (will tre a t to 3 mg / L T N) o r the Oa k Run WWT F (tre a ts to a b o ut 5.8 mg / L T N).
Ra inb o w Rive r spring she d b y re mo ving the pa c ka g e wa ste wa te r pla nts.
c o nne c tio n to se we r
c o nne c tio n – 5 mo nths
ina l De sig n – 1 mo nth
Bids (4/ 13/ 2020 – 8/ 3/ 2020)
B Adve rtise me nt – 2.5 mo nths
B E va lua tio n a nd Awa rd – 1 mo nth
P to Co ntra c to r – 0.5 mo nths
uc tion (8/ 24/ 2020 – 8/ 27/ 2021)
T
Y2020 Pro po se d F unding = $283,625
DE P Sta te Spring s F unding
Y2020 Pro po se d F unding = $1,559,938
WMD CF
IF
unding
Y2020 Pro po se d F unding = $1,276,313
N/ yr
re c la im wa te r
ffe c tive ne ss: $95/ lb o f T N
Ja nua ry 1, 2019