transit transport potential of kazakhstan as the largest
play

Transit-transport potential of Kazakhstan as the largest landlocked - PowerPoint PPT Presentation

Eur Euro-Asia ian Reg egional Mid idterm Revie iew of of the Vie Vienna Programme of of Acti ction for or the La Landlocked De Developing Cou Countries s for or the De Decade 2014 2014-2024 2024 16 2018


  1. Eur Euro-Asia ian Reg egional Mid idterm Revie iew of of the Vie Vienna Programme of of Acti ction for or the La Landlocked De Developing Cou Countries s for or the De Decade 2014 2014-2024 2024 • 16 НОЯБРЯ 2018 • ШЫМКЕНТ Integrating transport, health and environmental objectives into urban and spatial planning policies Transit-transport potential of Kazakhstan as the largest landlocked developing country 11-12 February 2019, Bangkok

  2. 1 TRANSIT TRANSPORTATION THROUGH THE REPUBLIC OF KAZAKHSTAN 33-35 days Kazakhstan, being in fierce competition for attracting transit cargo, was able to create a competitive land route as opposed to traditional international routes Kotka Saint Petersburg Klaipeda Moscow 18-20 days Hamburg Lodz Warsaw Rotterdam Brest Berlin Kartaly London Antwerp ASTANA Duisburg Izov Актобе Paris Pardubice Nurnberg 13-15 days Vienna Dostyk Budapest Shikhezi Saksaulskaya Ilichevsk Aktau Lyons Milan Almaty Constanta Batumi Akhalkalaki Altynkol Shymkent Urumqi Kuryk Tashkent Kars Alyat Dushanbe Madrid Istanbul ASHGABAD Korla Hakata Xian Lianyungang Serahs Zhengzhou Mazari Tehran Sharif Lanzhou Suzhou Chengdu Hefei Chongqing 35-45 days Wuhan Ningbo Yiwu Kunming Bandar Abbas Putian Guangzhou Dubai Shenzhen Mundra Hong Kong In 2020, it is planned to increase: Travel Distance, Маршруты time, annual transit traffic to 2 million TEUs к m days revenues from transit traffic to $ 5 billion Through Kazakhstan 9-10 ths. 13-15 Trans Siberian route 11-12 ths 18-20 The Northern Sea Route 14 -15 ths. 33-35 South Sea Route 23 000 ths. 45-60

  3. ROADS 2 Plans for 2018-2020 reconstruction - 4,4 thousand km. For the period from 1991 to 2017 In 2020, the proportion of roads reconstructed 10 thousand km, in good and satisfactory in 2015-2017 - 2 thousand km condition will be 90% ASTANA

  4. 3 CONTAINER TRANSPORTATION DEVELOPMENT Saint Peterburg Moscow Клайпеда Брест Berlin Astana Илецк Озинки Аксарайская Dostyk Оазис Актау Almaty Altynkol Болашак Nahodka Ablyk Urumchi Istanbul Baku Чжэнчжоу Pusan Lianyungan Tokio Osaka Uhan Chendu Chuncin Bender-Abbas Абу - Даби 17 international routes with major United Transport Logistics Company (OTLC) consolidation points of China's cargo flows Container flow Container flow Container flow China- Caucasus - Turkey (thousand TEU) Kazakhstan - Turkmenistan - Iran (thousand TEU) China - EU - China (thousand TEU) 201 In 2020 it is planned to increase the annual volume of transit traffic to 2 million containers

  5. 4 TRANS CASPIAN INTERNATIONAL TRANSPORT ROUTE Participants: railway and maritime administrations of China, Kazakhstan, Azerbaijan, Georgia, Turkey, Ukraine and Romania 10 seaports SYNERGY OF LOGISTIC INFRASTRUCTURE ON THE ROUTE 40 maritime fleet (ferries and vessels) 70 000 railway rolling stock Клайпеда 10 000 km of railway network Гамбург 2 000 000 sq. m. of storage facilities Дуйсбург АСТАНА Изов Аркалык Актобе Шалкар Нюрнберг Шубаркуль Достык Жезказган Шихези Бейнеу Саксаульская Констанца Актау Ильичевск СЭЗ Хоргос ВВ Урумчи Узень Батуми Курык Алматы Ахалкалаки Алтынколь Шымкент Корла Стамбул Карс Алят Amirabad Сиань Чжэнчжоу Ляньюнган Ланьчжоу Чэнду Хэфэй Чунцин Ahalhalaki Ухань Нинбо Иу Куньмин Путянь Kars Гуанчжоу Шеньжень Гонконг

  6. 5 WESTERN GATE OF KAZAKHSTAN Port Aktau ➢ 3 dry cargo terminals with the capacity ASTRAKHAN of 3 million tons were built in the port of Aktau ОЛЯ increase in the capacity of seaports from 16.5 to 19.5 million tons AKTAU KURYK Port Kuryk MAHACHKALA in mln. tons Phase 1: Railways ferry terminal Capacity - 4 million tons Put into operation - December 2016. Transported: 3 million tons of cargo BAKU ALYAT increase in the capacity of seaports TURKMENBASHI from 16.5 to 25.5 million tons Phase 2: Autopark terminal Capacity-2 million tons BENDER-ENZELLI Commissioning in 2018. AMIRABAD NOUSHAHR

  7. 6 CREATION AND COMPLEX DEVELOPMENT OF FEZ "KHORGOS-GATE WAY" Industrial area 224,4 h а Logistic area 224,9 h а Dry port 129 ha Khorgos KAZAKHSTAN Gate Way Lianyungang CHINA Options Forecast freight traffic: 4,4 mln. tons in year June 29, 2015: the first start-up complex (dry port) was put into commercial operation. International Managing Director: DP World Port Operator On October 18, 2016, the infrastructure facilities of the FEZ "Khorgos-Gate Way" were put into operation LOGIS ISTIC IC TERMI MINAL L IN THE PORT OF LIANYUNG NYUNGAN To date, the formation of the infrastructure of FEZ has been fully TOTAL L AREA 21.6 .6 HA completed Containe iner r area - 13 ha Open area for dry carg rgo - 6 ha Covere red wareh rehouse ses s - 1.2 ha (12 thousand nd m²) ❑ 79 participants of the Special Economic Zone were registered

  8. Thank you!

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend