strategic infrastructure location
play

STRATEGIC INFRASTRUCTURE LOCATION 03 04 TAX EXPERIENCE - PowerPoint PPT Presentation

01 02 STRATEGIC INFRASTRUCTURE LOCATION 03 04 TAX EXPERIENCE INCENTIVES AND RESULTS STRATEGIC LOCATION 01 WHERE ARE WE IN EUROPE? SAINT PETERSBURG HELSINKI 9 HRS 56 MIN 10 HRS 25 MIN TALLINN RIGA MOSCOW 7 HRS 16 MIN 12 HRS 6


  1. 01 02 STRATEGIC INFRASTRUCTURE LOCATION 03 04 TAX EXPERIENCE INCENTIVES AND RESULTS

  2. STRATEGIC LOCATION 01

  3. WHERE ARE WE IN EUROPE? SAINT PETERSBURG HELSINKI 9 HRS 56 MIN 10 HRS 25 MIN TALLINN RIGA MOSCOW 7 HRS 16 MIN 12 HRS 6 MIN 3 HRS 47 MIN KLAIP Ė DA 2 HRS 9 MIN GOTHENBURG 18 HRS 49 MIN EAST ASIA BERLIN ROTTERDAM KALININGRAD MINSK LONDON 10 HRS 13 MIN 16 HRS 36 MIN 3 HRS 53 MIN 3 HRS 26 MIN 22 HRS 11 MIN BREST WARSAW PARIS KYIV 5 HRS 20 MIN 5 HRS 6 MIN ANTWERP 20 HRS 15 MIN 10 HRS 30 MIN 17 HRS 16 MIN Members of the European Union MUNICH 14 HRS 43 MIN Main roads MILAN ODESSA 20 HRS 8 MIN 15 HRS 19 MIN Railways Rail Baltica Kaunas FEZ MADRID 32 HRS 5 MIN

  4. WHERE ARE WE IN LITHUANIA? RIGA Š IAULIAI SAINT PETERSBURG KLAIP Ė DA PANEV ĖŽ YS GOTHENBURG ANTWERP SHANGHAI A1 (E85) A8 (E67) A6 (E262) A1 (E85) VILNIUS KAUNAS KALININGRAD Kaunas city A5 (E67) MINSK MOSCOW Kaunas district KYIV Main international roads WARSAW BERLIN Railways Rail Baltica

  5. A8 (E67) – PANEV ĖŽ YS WHERE ARE WE RIGA TALLINN HELSINKI A1 (E85) – KLAIP Ė DA IN KAUNAS? A6 (E262) KARM Ė LAVA DOMEIKAVA U Ž LIED Ž IAI – – 4750 – 9445 2168 KAUNAS AIRPORT RAMU Č IAI RAUDONDVARIS – – 2500 6133 GIRAIT Ė – 4323 KAUNAS INTERMODAL TERMINAL RAILWAY RINGAUDAI STATION – 7515 FEZ territory A1 (E85) – VILNIUS MINSK Territory of the city 287K City centre Main roads 670K VAI Š VYDAVA – 5037 Railways GARLIAVA – Rail Baltic 11349 A5 (E67) – KALININGRAD WARSAW

  6. A6 (E262) – SAINT PETERSBURG KAUNAS FEZ TERRITORY KAUNAS AIRPORT A1 (E85) – KLAIP Ė DA Production and logistics Business street Occupied territories Railway Rail Baltic KAUNAS A1 (E85) – VILNIUS Planned roads INTERMODAL MINSK TERMINAL 330/110 kV district power substation

  7. INFRASTRUCTURE 02

  8. INFRASTRUCTURE TO THE BORDER OF THE LAND PLOT SEWERAGE WATER SUPPLY 2,027 m ³ of domestic waste 2,075 m ³ of drinking water removed a day consumed a day ELECTRICITY* RAINWATER SYSTEM Electricity consumed per day: Rainwater wastewater collected: 102,480 m 3 per day 80,887 kW ASPHALTED ROAD GAS SUPPLY Asphalted road: Gas consumed: 18,957 m 3 per day 8,1 km * Connection condition for the customer shall be obtained by communicating with the power distribution operator directly.

  9. SUCCESS STORIES DPD HELLA 10 MONTHS 10 MONTHS DPD built manufacturing, administration, and Hella built manufacturing, administration, and storage premises of 5,000 m ² area within 10 storage premises of 8,000 m ² area within months in 2.6 ha land plot. 10 months in 8.9 ha land plot. FREDA CONTINENTAL 12 MONTHS 15 MONTHS Freda built manufacturing, administration, and Continental built manufacturing, administration, storage premises of 35,600 m ² area within and storage premises of 22,000 m ² area within 12 months in 5.3 ha land plot. 15 months in 13 ha land plot.

  10. TAX INCENTIVES 03

  11. TAX INCENTIVES REAL ESTATE TAX PROFIT TAX IN KAUNAS FEZ UNTIL 2045: Production or logistics companies which invest more than 1 million euros or service companies which invest more than 100 thousand euros and employ over 20 people. 0% Elsewhere in Kaunas district: ~1% * FEZ STATUS UNTIL 2045

  12. LABOUR FORCE IN KAUNAS REGION 301 600 1356 EUR 19% At 50 km radius BRUTTO PEOPLE OF AVERAGE SALARY OF WHICH ARE EMPLOYABLE AGE EMPLOYED IN THE PRODUCTION In 6 colleges: In 7 universities: 9183 30253 In 14 vocational schools: 51513 26% 12077 STUDENTS study technical sciences:

  13. INVESTORS 04

  14. MANUFACTURING SERVICES CONTINENTAL RUN UPS ENGINEERING HELLA DPD LITTECH KOPA HOLLISTER KAUNO FL TECHNICS ELINTA KOGENERACIN Ė J Ė GAIN Ė FREDA EFTEN CAPITAL FINNFOAM ACONITUM LAVISOS LEZ TERMINALAS PERALTIS INTERCHEMIE AIB Ė RYTERNA FITSOUT ABC FARMA KOPA KAM Ė REES LEZ PIENAS LT VYT Ė N Ų PROJEKTAI VI Č I Ū NAI GROUP NOVECORUM AXIOMA GRILL LONDON METERING MTTC CHEMSYS

  15. EXPERIENCE AND RESULTS 125 HA 34 5395 INVESTORS JOBS CREATED THE TOTAL BUILT-UP AREA Create 0.4% of the direct GDP of Lithuania. 60 ha of which is area of developed premises 680 MLN. € YEAR 2005 534 HA THE FIRST FEZ TERRITORY ATTRACTED INVESTOR INVESTMENTS 70% of which are direct foreign investments.

  16. THANK YOU FOR YOUR ATTENTION CONTACT INFORMATION: +70 698 70 05 MARKETING@FTZ.LT INOVACIJ Ų ST. 3, BIRULI Š K Ė S, LT-54469, KAUNAS DISTRICT, LITHUANIA

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend