Towards an Onehunga Foreshore Concept Plan
Workshop Two : 24 May 2017
Stuart Houghton, Heather Wilkins stuart.houghton@bofgamiskell.co.nz heather.wilkins@bofgamiskell.co.nz
Exhibit L
Towards an Onehunga Foreshore Concept Plan Workshop Two : 24 May - - PowerPoint PPT Presentation
Exhibit L Towards an Onehunga Foreshore Concept Plan Workshop Two : 24 May 2017 Stuart Houghton, Heather Wilkins stuart.houghton@bofgamiskell.co.nz heather.wilkins@bofgamiskell.co.nz Outline Recap on Guiding Principles Design
Workshop Two : 24 May 2017
Stuart Houghton, Heather Wilkins stuart.houghton@bofgamiskell.co.nz heather.wilkins@bofgamiskell.co.nz
Exhibit L
Outline
Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
Learnings from Mangere Future Streets | Auckland Transport Safer Communities Programmme 2017
Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
Learnings from Mangere Future Streets | Auckland Transport Safer Communities Programmme 2017
Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
P R O P O S E D E A S T
E S T L I N K
AOTEA SEA SCOUTS MANUKAU CRUISING CLUB
EXISTING TRANSPOWER PYLON CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED EXISTING TRANSPOWER PYLON LOOKOUT OPPORTUNITY TO MANGERE MT. EXISTING SEA WALLS TO BE RETAINED REMNANT WHARF PILES TO BE RETAINED EXISTING BREAK WATER
TAUMANU RESERVE SOUTH-WESTERN MOTORWAY
LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET
O N E H U N G A P O R T
Sections 1 -2: Option 1
1:2,500 @ A3 75m
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE)
Option 1 Design
existing edge
Sea Scouts building
ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) ONF BOUNDARY / EXTENT
MANUKAU HARBOUR
EXISTING BIRD ROOSTING SITES
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
MANGAREI BRIDGE P R O P O S E D E A S T
E S T L I N K AOTEA SEA SCOUTS MANUKAU CRUISING CLUB
EXISTING TRANSPOWER PYLON EXISTING TRANSPOWER PYLON EXISTING TRANSPOWER PYLON EXISTING BREAK WATER EDGE ACCESS REMNANT WHARF PILES TO BE RETAINED
TAUMANU RESERVE SOUTH-WESTERN MOTORWAY
LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET PROPOSED LAND RECLAMATION NORTHERN FACING EDGE FOR BOAT LAUNCH OPPORTUNITY
O N E H U N G A P O R T
LOOK OUT OPPORTUNITY TO MANGERE MT. LEVEL CHANGE / WATERS EDGE OPPORTUNITY EXISTING SEA WALLS TO BE RETAINED
Sections 1 -2: Option 2
1:2,500 @ A3 75m
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) ONF BOUNDARY / EXTENT RECLAIMED LAND
WRAPPED AROUND DECKING TO RE-PURPOSED AOTEA SEASCOUTS BUILDING
MANUKAU HARBOUR
Option 2 Design
alternating experience between hugging existing edge and sections out over water
along the journey
boundary with short section across ONF at historic breach point
EXISTING BIRD ROOSTING SITES
CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) ONF BOUNDARY / EXTENT RECLAIMED LAND
Sections 1 -2: Option 3
1:2,500 @ A3 75m
MANGAREI BRIDGE P R O P O S E D E A S T
E S T L I N K AOTEA SEA SCOUTS MANUKAU CRUISING CLUB
EXISTING TRANSPOWER PYLON LEVEL CHANGE / WTERS EDGE OPPORTUNITY EXISTING TRANSPOWER PYLON EXISTING SEA WALLS TO BE REATINED PROPOSED LAND RECLAIMATION REMNANT WHARF PILES TO BE RETAINED OPPORTUNITY TO REFERENCE HISTORIC CRATER BREACH EXISTING BREAK WATER EDGE ACCESS WATERS EDGE OPPORTUNITY
TAUMANU RESERVE SOUTH-WESTERN MOTORWAY
LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET PROPOSED LAND RECLAIMATION NORTHERN FACING EDGE FOR BOAT LAUNCH OPPORTUNITY
O N E H U N G A P O R T
MANUKAU HARBOUR
Option 3 Design
timber boardwalks
existing breakwater and Manukau Cruising Club
alternating experience between hugging existing edge and sections out over water
CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) ONF BOUNDARY / EXTENT RECLAIMED LAND
Sections 1 -2: Option 4
1:2,500 @ A3 75m
MANGAREI BRIDGE P R O P O S E D E A S T
E S T L I N K AOTEA SEA SCOUTS MANUKAU CRUISING CLUB
EXISTING TRANSPOWER PYLON VOLCANIC TUFF FEATURE PRESERVED COMPLETE WITH NATURAL TIDAL FLUSHING EXISTING TRANSPOWER PYLON EXISTING SEA WALLS TO BE RETAINED PROPOSED LAND RECLAMATION REMNANT WHARF PILES TO BE RETAINED OPPORTUNITY TO REFERENCE HISTORIC CRATER BREACH WATERS EDGE OPPORTUNITY
TAUMANU RESERVE SOUTH-WESTERN MOTORWAY
PROPOSED LAND RECLAMATION NORTHERN FACING EDGE FOR BOAT LAUNCH OPPORTUNITY
O N E H U N G A P O R T
MANUKAU HARBOUR
Option 4 Design
timber boardwalks
existing Manukau Cruising Club and Aotea Sea Scouts
provide boat launch opportunities along with public amenity
(potential for piled or fmoating structures)
ONF
CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
FUTURE PORT REDEVELOPMENT EXISTING BIRD ROOSTING
EXISTING BOAT RAMP MADE GOOD
RESERVE - OPPORTUNITY FOR INFORMAL PATH NETWORK, WHILE RETAINING A BUFFER TO HELP PROTECT BIRD ROOSTING SITES ON THE NORTH-WESTERN EDGE PROPOSED BUILDING LOCATION FOR AOTEA SEA SCOUTS. APPROX. 300M2 PROPOSED BEACH RECLAMATION TO ENABLE BEACH LAUNCH OPPORTUNITIES AND PUBLIC AMENITY MINOR RECLAMATION TO ALLOW FOR BEACH OPPORTUNITY REMNANT WHARF PILES TO BE RETAINED REMNANT WHARF PILES TO BE RETAINED EXISTING SEA WALLS TO BE RETAINED
PROPOSED L I N K T O ONEHUNGA
Section 3: Option 1
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 6M WIDE) ONF BOUNDARY / EXTENT PROPOSED GREEN SPACE / PUBLIC RESERVE RECLAIMED LAND / BEACH RECLAMATION PROPOSED HARD SPACE / PUBLIC PLAZA
MANUKAU HARBOUR
MANGERE AND BRIDGE EAST-WEST L I N K
Option 1 Design
and to protect bird roosting sites along north- western edge
beach reclamation for beach launching and public amenity
integrated in to larger hard space / public plaza area Legend
1:1,000 @ A3 30m
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
FUTURE PORT DEVELOPMENT EXISTING BIRD ROOSTING SITES
EXISTING BOAT RAMP MADE GOOD
RESERVE - RETAINING A BUFFER TO HELP PROTECT BIRD ROOSTING SITES ON THE NORTH-WESTERN EDGE PROPOSED BUILDING LOCATION FOR AOTEA SEA SCOUTS. APPROX. 300M2 PROPOSED BEACH RECLAMATION TO ENABLE BEACH LAUNCH OPPORTUNITIES AND PUBLIC AMENITY MINOR RECLAMATION TO ALLOW FOR BEACH OPPORTUNITY REMNANT WHARF PILES TO BE RETAINED REMNANT WHARF PILES TO BE RETAINED EXISTING SEA WALLS TO BE RETAINED
PROPOSED L I N K T O ONEHUNGA
Section 3: Option 2
MANGERE AND BRIDGE EAST-WEST L I N K COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 6M WIDE) ONF BOUNDARY / EXTENT PROPOSED GREEN SPACE / PUBLIC RESERVE RECLAIMED LAND / BEACH RECLAMATION PROPOSED HARD SPACE / PUBLIC PLAZA
MANUKAU HARBOUR Legend
1:1,000 @ A3 30m
Option 2 Design
protect bird roosting sites along north-western edge
development without reclaiming land
beach reclamation for beach launching and public amenity
integrated in to larger hard space / public plaza area
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend 1:1,000 @ A3 30m
FUTURE PORT DEVELOPMENT EXISTING BIRD ROOSTING SITES
PROPOSED BOAT RAMP
RESERVE - RETAINING A BUFFER TO HELP PROTECT BIRD ROOSTING SITES ON THE NORTH-WESTERN EDGE PROPOSED BUILDING LOCATION FOR AOTEA ON PILED WHARF SEA SCOUTS. APPROX. 300M2 PROPOSED BEACH RECLAMATION TO ENABLE BEACH LAUNCH OPPORTUNITIES AND PUBLIC AMENITY REMNANT WHARF PILES TO BE RETAINED PILED WHARF SECTION OF COASTAL WALKWAY REMNANT WHARF PILES TO BE RETAINED EXISTING SEA WALLS TO BE RETAINED
PROPOSED LINK TO ONEHUNGA
Section 3: Option 3
MANGERE AND BRIDGE EAST-WEST L I N K COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 6M WIDE) ONF BOUNDARY / EXTENT PROPOSED GREEN SPACE / PUBLIC RESERVE RECLAIMED LAND / BEACH RECLIMATION PROPOSED HARD SPACE / PUBLIC PLAZA
MANUKAU HARBOUR Legend
Option 3 Design
boardwalk stretching out to end of point
protect bird roosting sites along north-western edge
development on existing port land
reclamation for beach launching and public amenity
achieve similar relationship to the waters edge as the current
integrated in to larger hard space / public plaza area
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
Section 3: Option 4
FUTURE PORT DEVELOPMENT EXISTING BIRD ROOSTING SITES
SCOUTS RESERVE - RETAINING A BUFFER TO HELP PROTECT BIRD ROOSTING SITES ON THE NORTH-WESTERN EDGE PROPOSED BUILDING LOCATION FOR AOTEA SEA
PROPOSED BEACH RECLAMATION TO ENABLE BEACH LAUNCH OPPORTUNITIES AND PUBLIC AMENITY REMNANT WHARF PILES TO BE RETAINED PILED WHARF SECTION OF COASTAL WALKWAY PROPOSED BOAT RAMP ROCKY GROYNE TO PROTECT AND SHELTER RECLAIMED BEACH REMNANT WHARF PILES TO BE RETAINED EXISTING SEA WALLS TO BE RETAINED
PROPOSED LINK TO ONEHUNGA
1:2,500 @ A3 75m
MANGERE AND BRIDGE EAST-WEST L I N K COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) ORPHEUS DRIVE - COMMUTER PATH (NOM. 6M WIDE) ONF BOUNDARY / EXTENT PROPOSED GREEN SPACE / PUBLIC RESERVE RECLAIMED LAND / BEACH RECLAMATION PROPOSED HARD SPACE / PUBLIC PLAZA
MANUKAU HARBOUR Legend
Option 4 Design
promontory public space stretching out to end
protect bird roosting sites along north-western edge
space at end of port to maximise future development on existing port land
reclamation for beach launching and public amenity
informally integrated in to larger hard space / public plaza area
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
Section 4: Option 1
PROPOSED SOUTH-WESTERN MOTORWAY LANDBRIDGE NOM. 150 LIN.M GLOUCESTER RESERVE SOUTH EAST-WEST LINK H E R I T A G E W H A R F ONEHUNGA HARBOUR ROAD
MANUKAU INLET
1:1,000 @ A3 30m
RECREATIONAL PATH (5M WIDE) COMMUTER PATH (NOM. 5M WIDE) PROPOSED LANDBRIDGE / PUBLIC SPACE
OLD MANGERE BRIDGE ABUTMENT REDESIGN TO LAND AND INTEGRATE WITH LAND BRIDGE LEVEL ENHANCE EXISTING PEDESTRIAN UNDERPASS AS KEY WALKING / CYCLING CONNECTION TO ONEHUNGA MALL PEDESTRIAN ACCESS IN TO GLOUCESTER PARK
USING THIS PARK FOR THEIR ACTIVITIES PARKING AND ACCESS TO EXISTING DEVELOPMENT COMPROMISED
Option 1 Design
Mangere Bridge crossing to Onehunga Harbour Road crossing (150m)
permanent design to be integrated closely with Port redevelopment opportunities
carparking provided to Gloucester Park South
PORT OF ONEHUNGA
FURTHER INVESTIGATION TO INTEGRATE OLD MANGERE BRIDGE WALKING / CYCLING DESIRE LINE WITH UNDERPASS CONNECTION FUTURE PORT REDEVELOPMENT TO CREATE NEW BUILT EDGE TO LAND BRIDGE AND OLD MANGERE BRIDGE ALIGNTMENT
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
Section 4: Option 2
PROPOSED SOUTH-WESTERN MOTORWAY LANDBRIDGE NOM. 170 LIN.M EAST-WEST LINK O N E H U N G A P O R T H E R I T A G E W H A R F ONEHUNGA HARBOUR ROAD
MANUKAU INLET
1:1,000 @ A3 30m
RECREATIONAL PATH (5M WIDE) COMMUTER PATH (NOM. 5M WIDE) PROPOSED LANDBRIDGE / PUBLIC SPACE GLOUCESTER RESERVE SOUTH
Option 2 Design
Mangere Bridge crossing to Onehunga Harbour Road crossing (150m)
provide more responsive design to topography and historical layout / access arrangements between Port and Onehunga
permanent design to be integrated closely with Port redevelopment opportunities
carparking provided to Gloucester Park South
PEDESTRIAN ACCESS IN TO GLOUCESTER PARK
USING THIS PARK FOR THEIR ACTIVITIES PARKING AND ACCESS TO EXISTING DEVELOPMENT COMPROMISED OLD MANGERE BRIDGE ABUTMENT REDESIGN TO LAND AND INTEGRATE WITH LAND BRIDGE LEVEL FUTURE PORT REDEVELOPMENT TO CREATE NEW BUILT EDGE TO LAND BRIDGE AND OLD MANGERE BRIDGE ALIGNTMENT ENHANCE EXISTING PEDESTRIAN UNDERPASS AS KEY WALKING / CYCLING CONNECTION TO ONEHUNGA MALL FURTHER INVESTIGATION TO INTEGRATE OLD MANGERE BRIDGE WALKING / CYCLING DESIRE LINE WITH UNDERPASS CONNECTION
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
O N E H U N G A P O R T ONEHUNGA HARBOUR ROAD H E R I T A G E W H A R F
EXISTING POHUTUKAWA TREES TO BE RETAINED WHERE POSSIBLE RECREATIONAL PATH REALIGNED TO LAND ON EXISTING RECLAMATION UNDER MOTORWAY CROSSING TO HEIGHTEN VIEWS AND EXPERIENCE OF TRANSITION BETWEEN INLET AND WHARF / OLD MANGERE BRIDGE CONVERGENCE POINT
Section 5: Option 1
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) TWO WAY CYCLE PATH PROPOSED GREEN SPACE / PUBLIC RESERVE
MANUKAU INLET
Option 1 Design
reclamation
down the Manukau Inlet
Legend
1:1,000 @ A3 30m
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
P R O P O S E D E A S T
E S T L I N K O N E H U N G A P O R T ONEHUNGA HARBOUR ROAD H E R I T A G E W H A R F SOUTH-WESTERN MOTORWAY
EXISTING POHUTUKAWA TREES TO BE RETAINED WHERE POSSIBLE BRIDGE LIKE STRUCTURE RAISING UP TO LEVEL OF MANGERE BRIDGE AND LAND BRIDGE
Section 5: Option 2
MANUKAU INLET
1:1,000 @ A3 30m
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) TWO WAY CYCLE PATH PROPOSED GREEN SPACE / PUBLIC RESERVE
Legend
Option 2 Design
reclamation
bridge and land bridge level
down the Manukau Inlet
www.boffamiskell.co.nz
project name
This plan has been prepared by Bofga Miskell Limited on the specifjc instructions of our Client. It is solely for our Client’s use in accordance with the agreed scope of work. Any use or reliance by a third party is at that party’s own| Date: 09 may 2017 | revision: 0 |
Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: Plan prepared for Panuku Development Auckland and NZTA by Bofga MiskellLegend
P R O P O S E D E A S T
E S T L I N K O N E H U N G A P O R T ONEHUNGA HARBOUR ROAD H E R I T A G E W H A R F SOUTH-WESTERN MOTORWAY
EXISTING POHUTUKAWA TREES TO BE RETAINED WHERE POSSIBLE PROPOSED TREES TO ADD SCALE TO COMPETE WITH BRIDGE, SILOS AND FUTURE DEVELOPMENT RECREATIONAL PATH TO GO UNDER PROPOSED MANGERE BRIDGE PROPOSED LAND RECLAMATION TERRACED GREEN SPACE / RESERVE
Section 5: Option 3
MANUKAU INLET
1:1,000 @ A3 30m
COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) TWO WAY CYCLE PATH PROPOSED GREEN SPACE / PUBLIC RESERVE RECLAIMED LAND / BEACH RECLIMATION
Legend
Option 3 Design
fully reclaimed to create new green space / reserve bookending eastern end of port redevelopment
boardwalk to tie in inlet coastal path with port public access
required for direct access to port
Learnings from Mangere Future Streets | Auckland Transport Safer Communities Programmme 2017
Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
Proposed Next Steps
Captures issues, opportunities and desired outcomes,
spatial relationships at a high diagrammatic level with supporting written commentary
ORPHEUS DRIVE NOM. 5M WIDE BOARDWALK STONE RIPRAP EDGE LOW TIDE CONCETE WALL 5M WIDE FORESHORE
ORPHEUS DRIVE NOM. STONE RIPRAP EDGE 5M WIDE BOARDWALK HIGH TIDE FORESHORE 5M WIDE
5M WIDE BOARDWALK
P R O P O S E D E W L S O U T H
E S T E R N M O T O R W A Y T A U M A N U R E S E R V E
LAND BRIDGE
P O R T O F O N E H U N G A
F O R E S H O R E L I N K
EMBAYMENT
ONEHUNGA TOWN CENTRE MANGERE BRIDGE
SEA SCOUT RELOCATION AOTEA SEA SCOUTS HISTORIC BUILDING EMBAYMENT ONF BOUNDARY GLOUCESTER RESERVE SOUTH GLOUCESTER RESERVE NORTH BAY RESER
FRAMEWORK PLAN WORKING DRAFT