TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - - PowerPoint PPT Presentation

tia tr 42 liaison to ieee 42 liaison to ieee tia tr
SMART_READER_LITE
LIVE PREVIEW

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - - PowerPoint PPT Presentation

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Rybinski Val Chair, TR- -42.7 42.7 Chair, TR Sterling Vaden Vaden Sterling Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice October, 2005 October, 2005 Milpitas, CA


slide-1
SLIDE 1

October 2005 IEEE 802.3

TIA TR TIA TR-

  • 42 Liaison to IEEE

42 Liaison to IEEE

Val Val Rybinski Rybinski

Chair, TR Chair, TR-

  • 42.7

42.7

Sterling Sterling Vaden Vaden

Vice Vice-

  • Chair, TR

Chair, TR-

  • 42.7

42.7 October, 2005 October, 2005 Milpitas, CA Milpitas, CA

slide-2
SLIDE 2

October 2005 IEEE 802.3

TIA TR TIA TR-

  • 42.7 Meeting

42.7 Meeting

  • Oct 3

Oct 3-

  • 4, 2005

4, 2005

  • Alexandria, VA

Alexandria, VA

  • 1

1st

st ballot for TSB

ballot for TSB-

  • 155 closed

155 closed

  • 1

1st

st ballot for ‘568

ballot for ‘568-

  • B.2

B.2-

  • 10 closed

10 closed

  • comment review process ongoing

comment review process ongoing

  • ‘568

‘568-

  • B.2

B.2-

  • 11 approved for publication

11 approved for publication

slide-3
SLIDE 3

October 2005 IEEE 802.3

Status of TSB Status of TSB-

  • 155

155

  • 1

1st

st ballot for TSB

ballot for TSB-

  • 155 closed

155 closed

  • approximately 30 comments pending

approximately 30 comments pending resolution resolution

  • teleconference scheduled for 10/21

teleconference scheduled for 10/21

  • procedure identified for 30

procedure identified for 30-

  • day ballot

day ballot

  • draft will be forwarded to IEEE when

draft will be forwarded to IEEE when ballot requirements are satisfied ballot requirements are satisfied

slide-4
SLIDE 4

October 2005 IEEE 802.3

Status of ‘568 Status of ‘568-

  • B.2

B.2-

  • 10

10

  • 1

1st

st ballot for TSB

ballot for TSB-

  • 155 closed

155 closed

  • approximately 40 pages of comments

approximately 40 pages of comments pending resolution pending resolution

  • ballot resolution will continue at interim

ballot resolution will continue at interim meeting scheduled for December 6 meeting scheduled for December 6-

  • 8

8

  • bjective to re
  • bjective to re-
  • ballot after interim

ballot after interim

slide-5
SLIDE 5

October 2005 IEEE 802.3

Approved for Publication: SP Approved for Publication: SP-

  • 3

3-

  • 4426

4426-

  • AD11

AD11 Specification for Increased Diameter of Specification for Increased Diameter of 4 4-

  • Pair UTP and ScTP Cables

Pair UTP and ScTP Cables

“ “ The requirement in clause 4.3.3.4 of TIA/EIA The requirement in clause 4.3.3.4 of TIA/EIA-

  • 568

568-

  • B.2 shall be revised as follows:

B.2 shall be revised as follows: The diameter of the completed cable shall be The diameter of the completed cable shall be less than less than 9.0 9.0 mm (0.354 in)*. mm (0.354 in)*.” ” * previously 6.35 mm (0.25 in.) * previously 6.35 mm (0.25 in.)

Status of ‘568 Status of ‘568-

  • B.2

B.2-

  • 11

11

slide-6
SLIDE 6

October 2005 IEEE 802.3

Next TIA Meeting Next TIA Meeting

December 6 December 6-

  • 8, 2005

8, 2005 Safety Harbor, FL Safety Harbor, FL www. www.tiaonline tiaonline.org .org

slide-7
SLIDE 7

October 2005 IEEE 802.3

Thank you Thank you

Contact Information: Contact Information:

Val Rybinski Val Rybinski

The Siemon Company The Siemon Company 101 Siemon Company Drive 101 Siemon Company Drive Watertown, CT 06795 Watertown, CT 06795

cell phone: (602) 793 cell phone: (602) 793-

  • 4029

4029 valerie valerie_ _rybinski rybinski@ @siemon siemon.com .com