tia tr 42 liaison to ieee 42 liaison to ieee tia tr
play

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - PowerPoint PPT Presentation

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Rybinski Val Chair, TR- -42.7 42.7 Chair, TR Sterling Vaden Vaden Sterling Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice October, 2005 October, 2005 Milpitas, CA


  1. TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Rybinski Val Chair, TR- -42.7 42.7 Chair, TR Sterling Vaden Vaden Sterling Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice October, 2005 October, 2005 Milpitas, CA Milpitas, CA October 2005 IEEE 802.3

  2. TIA TR- -42.7 Meeting 42.7 Meeting TIA TR • Oct 3- -4, 2005 4, 2005 • Oct 3 • Alexandria, VA • Alexandria, VA st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 st ballot for ‘568 • 1 st ballot for ‘568- -B.2 B.2- -10 closed 10 closed • 1 • comment review process ongoing • comment review process ongoing • ‘568- -B.2 B.2- -11 approved for publication 11 approved for publication • ‘568 October 2005 IEEE 802.3

  3. Status of TSB- -155 155 Status of TSB st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 • approximately 30 comments pending • approximately 30 comments pending resolution resolution • teleconference scheduled for 10/21 • teleconference scheduled for 10/21 • procedure identified for 30- -day ballot day ballot • procedure identified for 30 • draft will be forwarded to IEEE when • draft will be forwarded to IEEE when ballot requirements are satisfied ballot requirements are satisfied October 2005 IEEE 802.3

  4. Status of ‘568- -B.2 B.2- -10 10 Status of ‘568 st ballot for TSB • 1 st ballot for TSB- -155 closed 155 closed • 1 • approximately 40 pages of comments • approximately 40 pages of comments pending resolution pending resolution • ballot resolution will continue at interim • ballot resolution will continue at interim meeting scheduled for December 6- -8 8 meeting scheduled for December 6 • objective to re- -ballot after interim ballot after interim • objective to re October 2005 IEEE 802.3

  5. Status of ‘568- -B.2 B.2- -11 11 Status of ‘568 Approved for Publication: SP- -3 3- -4426 4426- -AD11 AD11 Approved for Publication: SP Specification for Increased Diameter of Specification for Increased Diameter of 4- -Pair UTP and ScTP Cables Pair UTP and ScTP Cables 4 “ The requirement in clause 4.3.3.4 of TIA/EIA The requirement in clause 4.3.3.4 of TIA/EIA- - “ 568- -B.2 shall be revised as follows: B.2 shall be revised as follows: 568 The diameter of the completed cable shall be The diameter of the completed cable shall be less than 9.0 9.0 mm (0.354 in)*. mm (0.354 in)*.” ” less than * previously 6.35 mm (0.25 in.) * previously 6.35 mm (0.25 in.) October 2005 IEEE 802.3

  6. Next TIA Meeting Next TIA Meeting December 6- -8, 2005 8, 2005 December 6 Safety Harbor, FL Safety Harbor, FL www.tiaonline tiaonline.org .org www. October 2005 IEEE 802.3

  7. Thank you Thank you Contact Information: Contact Information: Val Rybinski Val Rybinski The Siemon Company The Siemon Company 101 Siemon Company Drive 101 Siemon Company Drive Watertown, CT 06795 Watertown, CT 06795 cell phone: (602) 793- -4029 4029 cell phone: (602) 793 valerie_ _rybinski rybinski@ @siemon siemon.com .com valerie October 2005 IEEE 802.3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend