TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - - PowerPoint PPT Presentation

tia tr 42 liaison to ieee 42 liaison to ieee tia tr
SMART_READER_LITE
LIVE PREVIEW

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val - - PowerPoint PPT Presentation

TIA TR- -42 Liaison to IEEE 42 Liaison to IEEE TIA TR Val Rybinski Val Rybinski Hitachi Cable Manchester, Inc. Hitachi Cable Manchester, Inc. Vice- -Chair, TR Chair, TR- -42.7 42.7 Vice Chair, TR- -42.7.1 42.7.1 Chair, TR March


slide-1
SLIDE 1

March 2004 IEEE 802.3

TIA TR TIA TR-

  • 42 Liaison to IEEE

42 Liaison to IEEE

Val Rybinski Val Rybinski

Hitachi Cable Manchester, Inc. Hitachi Cable Manchester, Inc. Vice Vice-

  • Chair, TR

Chair, TR-

  • 42.7

42.7 Chair, TR Chair, TR-

  • 42.7.1

42.7.1 March 2004 March 2004 Orlando, FL Orlando, FL

slide-2
SLIDE 2

March 2004 IEEE 802.3

Summary of TIA TR Summary of TIA TR-

  • 42

42 Liaison Output Liaison Output

  • 3 Working Group Ballots

3 Working Group Ballots

  • ut for Industry Review
  • ut for Industry Review
  • 2 New Task Groups

2 New Task Groups formed to study formed to study 10GBASE 10GBASE-

  • T related items

T related items

slide-3
SLIDE 3

March 2004 IEEE 802.3

Project SP Project SP-

  • 3

3-

  • 0094: Draft 4

0094: Draft 4

To become TIA/EIA 942: To become TIA/EIA 942: “Telecommunications “Telecommunications Infrastructure Standard for Data Infrastructure Standard for Data Centers” Centers” “ “Provides requirements for the Provides requirements for the design and installation of a data design and installation of a data center or computer room center or computer room” ”

Ballot comments due April 2, 2004 Ballot comments due April 2, 2004

slide-4
SLIDE 4

March 2004 IEEE 802.3

Project SP Project SP-

  • 3

3-

  • 4425

4425-

  • AD6: d3

AD6: d3

To become TIA/EIA To become TIA/EIA-

  • 568

568-

  • B.1

B.1-

  • 6:

6: “ “Additional Cabling Guidelines for Additional Cabling Guidelines for DTE Power DTE Power” ” “ “Provides guidelines for the Provides guidelines for the insertion of dc power onto insertion of dc power onto structured cabling for low voltage structured cabling for low voltage applications applications” ”

Ballot comments due April 2, 2004 Ballot comments due April 2, 2004

slide-5
SLIDE 5

March 2004 IEEE 802.3

Project SP Project SP-

  • 3

3-

  • 4426

4426-

  • AD9: d2

AD9: d2

To become TIA/EIA To become TIA/EIA-

  • 568

568-

  • B.2

B.2-

  • 9:

9: “ “Additional Category 6 Balance Additional Category 6 Balance Requirements Requirements” ” “ “Provides updated specifications Provides updated specifications and laboratory test methods for and laboratory test methods for category 6 cable and connector category 6 cable and connector TCL and TCTL TCL and TCTL” ”

Ballot comments due April 2, 2004 Ballot comments due April 2, 2004

slide-6
SLIDE 6

March 2004 IEEE 802.3

Project PN Project PN-

  • 3

3-

  • 0134 Study

0134 Study Grp Grp

  • Led by Chris

Led by Chris DiMinico DiMinico

  • Study category 5e and category 6

Study category 5e and category 6 cabling transmission performance cabling transmission performance and alien crosstalk up to 625 MHz and alien crosstalk up to 625 MHz

  • Study the relationship of

Study the relationship of transmission parameters and alien transmission parameters and alien crosstalk and their field testing crosstalk and their field testing and mitigation and mitigation

slide-7
SLIDE 7

March 2004 IEEE 802.3

Project PN Project PN-

  • 3

3-

  • 0134: Output

0134: Output

  • Applicable category 6 data and

Applicable category 6 data and guidelines from the study will be guidelines from the study will be presented in TSB presented in TSB-

  • 155

155

  • Category 5e and category 6

Category 5e and category 6 measurement data will be shared measurement data will be shared directly with IEEE 802.3 directly with IEEE 802.3 10GBASE 10GBASE-

  • T Task Force as it

T Task Force as it becomes available becomes available

slide-8
SLIDE 8

March 2004 IEEE 802.3

Project SP Project SP-

  • 3

3-

  • 4426

4426-

  • AD10: SG

AD10: SG

“ “Augmented category 6 cabling Augmented category 6 cabling ” ”

  • Led by:

Led by: Paul Kish Paul Kish Wayne Larsen Wayne Larsen

slide-9
SLIDE 9

March 2004 IEEE 802.3

  • Develop cabling and component

Develop cabling and component specifications and test procedures specifications and test procedures to support the operation of to support the operation of 10GBASE 10GBASE-

  • T over 100m of

T over 100m of twisted twisted-

  • pair copper cabling

pair copper cabling

  • Project includes extending the

Project includes extending the frequency range and adding frequency range and adding requirements to TIA requirements to TIA-

  • 568

568-

  • B.2

B.2-

  • 1

1

Project SP Project SP-

  • 3

3-

  • 4426

4426-

  • AD10: Scope

AD10: Scope

slide-10
SLIDE 10

March 2004 IEEE 802.3

Project SP Project SP-

  • 3

3-

  • 4426

4426-

  • AD10: Output

AD10: Output

  • Resulting requirements will be

Resulting requirements will be presented in a new revision or presented in a new revision or addendum to the TIA addendum to the TIA-

  • 568

568-

  • B (or

B (or TIA TIA-

  • 568

568-

  • C) family of standards

C) family of standards

slide-11
SLIDE 11

March 2004 IEEE 802.3

“TIA TR “TIA TR-

  • 42 will provide a

42 will provide a timeline timeline for completion of these activities for completion of these activities following the June TIA Meeting in following the June TIA Meeting in Providence, RI. Providence, RI.” ”

Project Timeline Project Timeline

slide-12
SLIDE 12

March 2004 IEEE 802.3

Thank you Thank you

Contact Information: Contact Information:

Val Rybinski Val Rybinski

Hitachi Cable Manchester, Inc. Hitachi Cable Manchester, Inc. 900 Holt Avenue 900 Holt Avenue Manchester, NH 03109 Manchester, NH 03109

(603) 669 (603) 669-

  • 4347

4347 vrybinski vrybinski@ @hcm hcm. .hitachi hitachi.com .com