TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 - - PowerPoint PPT Presentation

tia tr tia tr 42 liaison to ieee 802 3 42 liaison to ieee
SMART_READER_LITE
LIVE PREVIEW

TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 - - PowerPoint PPT Presentation

TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 Valerie Maguire Valerie Maguire Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR 42 Telecommunications


slide-1
SLIDE 1

TIA TR TIA TR-

  • 42 Liaison to IEEE 802.3

42 Liaison to IEEE 802.3

Valerie Maguire Valerie Maguire

Vice Chair, TIA TR Vice Chair, TIA TR-42 Telecommunications 42 Telecommunications Cabling Systems Engineering Committee Cabling Systems Engineering Committee

March 2012 1 IEEE 802.3

Vice Chair, TIA TR Vice Chair, TIA TR-42 Telecommunications 42 Telecommunications Cabling Systems Engineering Committee Cabling Systems Engineering Committee Vice Chair, TIA TR Vice Chair, TIA TR-42.7 Copper Cabling 42.7 Copper Cabling Subcommittee Subcommittee March, 2012 March, 2012 Waikoloa, HI Waikoloa, HI

slide-2
SLIDE 2

Introduction to TIA Introduction to TIA

  • Telecommunications Industry

Telecommunications Industry Association Association

  • www.tiaonline.org

www.tiaonline.org

  • TR

TR-42: Defines mechanical and 42: Defines mechanical and

March 2012 2 IEEE 802.3

  • TR

TR-42: Defines mechanical and 42: Defines mechanical and transmission requirements for copper transmission requirements for copper twisted twisted-pair, optical fiber, and coaxial pair, optical fiber, and coaxial cabling and components cabling and components

slide-3
SLIDE 3

Agenda and Meeting Overview Agenda and Meeting Overview

  • February 6

February 6 - 10 in West Palm Beach, FL 10 in West Palm Beach, FL

  • Review TR

Review TR-42 sub 42 sub-committee activities committee activities

  • 12 sub

12 sub-committees met committees met

March 2012 3 IEEE 802.3

  • Update on project development

Update on project development

  • This symbol highlights key points

This symbol highlights key points

  • f interest
  • f interest
slide-4
SLIDE 4
  • TR

TR-42.1 (Commercial Building Cabling): 42.1 (Commercial Building Cabling):

– ANSI/TIA ANSI/TIA-568 568-C.0 C.0-2, “General Updates” 2, “General Updates” approved for publication approved for publication – ANSI/TIA ANSI/TIA-942 942-A, “Telecommunications A, “Telecommunications Infrastructure Standard for Data Centers” Infrastructure Standard for Data Centers”

TR TR-42 Activities 42 Activities

  • March 2012

4 IEEE 802.3

Infrastructure Standard for Data Centers” Infrastructure Standard for Data Centers” approved for publication pending no approved for publication pending no comments on final default comments on final default

slide-5
SLIDE 5
  • TR

TR-42.1 (Commercial Building Cabling), 42.1 (Commercial Building Cabling), cont.: cont.:

– New project: ANSI/TIA New project: ANSI/TIA-942 942-A A-1, 1, “Telecommunications Infrastructure “Telecommunications Infrastructure Standard for Data Centers, Addendum 1 Standard for Data Centers, Addendum 1 –

TR TR-42 Activities 42 Activities

March 2012 5 IEEE 802.3

Standard for Data Centers, Addendum 1 Standard for Data Centers, Addendum 1 – Cabling Guidelines for Data Center Cabling Guidelines for Data Center Fabrics” circulating for committee ballot Fabrics” circulating for committee ballot – New project: ANSI/TIA New project: ANSI/TIA-4966, 4966, “Telecommunications Infrastructure for “Telecommunications Infrastructure for Educational Buildings and Spaces” under Educational Buildings and Spaces” under development development

slide-6
SLIDE 6
  • TR

TR-42.2 (Residential Infrastructure): 42.2 (Residential Infrastructure):

– No new project status updates No new project status updates

  • TR

TR-42.3 (Pathways and Spaces): 42.3 (Pathways and Spaces):

– New project: ANSI/TIA New project: ANSI/TIA-569 569-C C-1, 1, “Commercial Building Standard for “Commercial Building Standard for

TR TR-42 Activities 42 Activities

March 2012 6 IEEE 802.3

“Commercial Building Standard for “Commercial Building Standard for Telecommunications Pathways and Telecommunications Pathways and Spaces, Addendum 1 Spaces, Addendum 1 – – Revised Revised Temperature and Humidity Requirements Temperature and Humidity Requirements for Telecommunications Spaces” under for Telecommunications Spaces” under development development

slide-7
SLIDE 7
  • TR

TR-42.5 (Terms and Symbols): 42.5 (Terms and Symbols):

– Definitions, acronyms, units of measure, Definitions, acronyms, units of measure, and symbols maintained in a working and symbols maintained in a working document document – New project: ANSI/TIA New project: ANSI/TIA-440 440-B, B, “Fiber “Fiber Optic Optic

TR TR-42 Activities 42 Activities

March 2012 7 IEEE 802.3

– New project: ANSI/TIA New project: ANSI/TIA-440 440-B, B, “Fiber “Fiber Optic Optic Terminology” Terminology” circulating for reaffirmation circulating for reaffirmation

  • TR

TR-42.6 (Infrastructure Administration): 42.6 (Infrastructure Administration):

– ANSI/TIA ANSI/TIA-606 606-B, “Administration Standard B, “Administration Standard for Commercial Telecommunications for Commercial Telecommunications Infrastructure” approved for publication Infrastructure” approved for publication

slide-8
SLIDE 8
  • TR

TR-42.7 (Copper Cabling): 42.7 (Copper Cabling):

– ANSI/TIA ANSI/TIA-1183, “Test Fixtures for 1183, “Test Fixtures for Balunless Measurements of Balanced Balunless Measurements of Balanced Components and Systems” approved for Components and Systems” approved for publication publication

TR TR-42 Activities 42 Activities

March 2012 8 IEEE 802.3

– New project: TSB New project: TSB-1197, “Mode Conversion 1197, “Mode Conversion Parameters for Balanced Twisted Parameters for Balanced Twisted-Pair Pair Cabling” circulating for Committee Ballot Cabling” circulating for Committee Ballot

slide-9
SLIDE 9
  • TR

TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.:

– New project: New project: ANSI/TIA ANSI/TIA-568 568-C.2 C.2-1, 1, “Balanced Twisted “Balanced Twisted-Pair Pair Telecommunications Cabling and Telecommunications Cabling and Components Standard, Addendum 1: Components Standard, Addendum 1: Specifications for 100 Next Generation Specifications for 100 Next Generation

TR TR-42 Activities 42 Activities

  • March 2012

9 IEEE 802.3

Specifications for 100 Next Generation Specifications for 100 Next Generation Cabling” under development Cabling” under development

slide-10
SLIDE 10
  • TR

TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.:

– Four “100 Next Generation Cabling” Four “100 Next Generation Cabling” Task Groups established Task Groups established 1.

  • 1. Cable TG

Cable TG 2.

  • 2. Connector TG

Connector TG

TR TR-42 Activities 42 Activities

  • March 2012

10 IEEE 802.3

2.

  • 2. Connector TG

Connector TG 3.

  • 3. Applications Space TG

Applications Space TG 4.

  • 4. Capacity Task TG

Capacity Task TG Contact the Chair of TR Contact the Chair of TR-42.7 42.7 (sterling.vaden@occfiber.com) for (sterling.vaden@occfiber.com) for participation information participation information

slide-11
SLIDE 11
  • TR

TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.:

– “100 Next Generation Cabling” Baseline “100 Next Generation Cabling” Baseline Objectives adopted Objectives adopted – Discussions converging on a 2 Discussions converging on a 2- or 3

  • r 3-

connector, 50 connector, 50-meter channel topology meter channel topology

TR TR-42 Activities 42 Activities

  • March 2012

11 IEEE 802.3

connector, 50 connector, 50-meter channel topology meter channel topology (TBD) (TBD) – Bandwidth specification may be as high as Bandwidth specification may be as high as 2 GHz (TBD) 2 GHz (TBD) – Interim meeting schedule for April 11 Interim meeting schedule for April 11 – 12 12 in Washington, DC area in Washington, DC area

slide-12
SLIDE 12
  • TR

TR-42.9 (Industrial Infrastructure): 42.9 (Industrial Infrastructure):

– No new project status updates No new project status updates

  • TR

TR-42.11 (Optical Fiber Systems): 42.11 (Optical Fiber Systems):

– Encircled flux test method under study Encircled flux test method under study – BIMMF requirements under study BIMMF requirements under study

TR TR-42 Activities 42 Activities

March 2012 12 IEEE 802.3

– BIMMF requirements under study BIMMF requirements under study – 24 24-fiber cabling requirements under study fiber cabling requirements under study – Dispersion compensating MMF under Dispersion compensating MMF under study study

slide-13
SLIDE 13
  • TR

TR-42.12 (Optical Fibers and Cables): 42.12 (Optical Fibers and Cables):

– ANSI/TIA ANSI/TIA-455 455-244/FOTP 244/FOTP-244, “Expressed 244, “Expressed Tube Temperature Cycling” approved for Tube Temperature Cycling” approved for publication publication – ANSI/TIA ANSI/TIA-4720000 family of Optical Fiber 4720000 family of Optical Fiber Specifications approved for publication Specifications approved for publication

TR TR-42 Activities 42 Activities

March 2012 13 IEEE 802.3

Specifications approved for publication Specifications approved for publication – New New project: TIA project: TIA-455 455-7/FOTP 7/FOTP-7, 7, “Numerical Aperture” circulating for “Numerical Aperture” circulating for committee committee ballot ballot

slide-14
SLIDE 14
  • TR

TR-42.12 (Optical Fibers and Cables), 42.12 (Optical Fibers and Cables), cont cont.: .:

− New project: TIA New project: TIA-455 455-28/FOTP 28/FOTP-28, 28, “Dynamic Tension” circulating for “Dynamic Tension” circulating for committee committee ballot ballot

TR TR-42 Activities 42 Activities

March 2012 14 IEEE 802.3

− New New project: project: TIA TIA-455 455-58/FOTP 58/FOTP-58 58, , “Core “Core Size, adoption of Size, adoption of IEC 60793 IEC 60793-1-20” 20” circulating for circulating for reaffirmation reaffirmation ballot ballot − New New project: TIA project: TIA-455 455-80/FOTP 80/FOTP-80, “Patch 80, “Patch Cord Wavelength” circulating for Cord Wavelength” circulating for committee committee ballot ballot

slide-15
SLIDE 15
  • TR

TR-42.12 (Optical Fibers and Cables), 42.12 (Optical Fibers and Cables), cont cont.: .:

− New project: TIA New project: TIA-455 455-177/FOTP 177/FOTP-177, 177, “Graded “Graded-index MMF, adoption of IEC index MMF, adoption of IEC 60793 60793-1-31” circulating for reaffirmation 31” circulating for reaffirmation ballot ballot

TR TR-42 Activities 42 Activities

March 2012 15 IEEE 802.3

ballot ballot − New project: New project: TIA TIA-455 455-204 204-A/FOTP A/FOTP-204, 204, “Multimode Bandwidth, adoption of Multimode Bandwidth, adoption of IEC 60793 IEC 60793-1 1-41” circulating for 41” circulating for reaffirmation ballot reaffirmation ballot

slide-16
SLIDE 16
  • TR

TR-42.12 (Optical Fibers and Cables), 42.12 (Optical Fibers and Cables), cont cont.: .:

− New project: New project: TIA TIA-455 455-220/FOTP 220/FOTP-220 220, “DMD , “DMD Measurement, adoption of Measurement, adoption of IEC 60793 IEC 60793-1-4” 4” circulating for reaffirmation ballot circulating for reaffirmation ballot

TR TR-42 Activities 42 Activities

March 2012 16 IEEE 802.3

− New project: TIA New project: TIA-598, 598, “Cable Color Coding” “Cable Color Coding” circulating for circulating for committee committee ballot ballot

slide-17
SLIDE 17
  • TR

TR-42.13 (Passive Optical Devices and 42.13 (Passive Optical Devices and Components): Components):

– New New project: TIA project: TIA-4947, “Adhesive 4947, “Adhesive Guidelines” Guidelines” circulating for committee circulating for committee ballot ballot

TR TR-42 Activities 42 Activities

March 2012 17 IEEE 802.3

ballot ballot – New project: TSB 143, “Fiber Optic Power New project: TSB 143, “Fiber Optic Power Meters” Meters” linearity under linearity under development development – New project: New project: TIA TIA-455 455-231/FOTP 231/FOTP-231, 231, “Calibration of FO Power “Calibration of FO Power Meters” under Meters” under development development

slide-18
SLIDE 18
  • TR

TR-42.13 (Passive Optical Devices and 42.13 (Passive Optical Devices and Components Components), cont.: ), cont.:

– Return Return loss calibration under study loss calibration under study – New New multimode launch conditions multimode launch conditions (TIA (TIA-455 455-34/FOTP 34/FOTP-34) under 34) under study study

TR TR-42 Activities 42 Activities

March 2012 18 IEEE 802.3

(TIA (TIA-455 455-34/FOTP 34/FOTP-34) under 34) under study study – Encircled flux metrology and calibration Encircled flux metrology and calibration under study under study

slide-19
SLIDE 19
  • TR

TR-42.16 (Grounding and Bonding): 42.16 (Grounding and Bonding):

– New project: ANSI/TIA New project: ANSI/TIA-607 607-B B-1, “Generic 1, “Generic Telecommunications Bonding and Telecommunications Bonding and Grounding (Earthing) for Customer Grounding (Earthing) for Customer Premises Addendum 1 Premises Addendum 1 – – External External Grounding” under development Grounding” under development

TR TR-42 Activities 42 Activities

March 2012 19 IEEE 802.3

Grounding” under development Grounding” under development

slide-20
SLIDE 20

TR TR-42 Plenary Meetings 42 Plenary Meetings

June 4 June 4 - 8, , 2012 2012 Dallas, TX Dallas, TX

Upcoming TIA Meetings Upcoming TIA Meetings

March 2012 20 IEEE 802.3

www.tiaonline.org www.tiaonline.org

slide-21
SLIDE 21

Thank you Thank you

Contact Information: Contact Information:

Valerie Maguire Valerie Maguire

The Siemon Company The Siemon Company

March 2012 21 IEEE 802.3

The Siemon Company The Siemon Company 101 Siemon Company Drive 101 Siemon Company Drive Watertown, CT 06795 Watertown, CT 06795

phone: (602) 228 phone: (602) 228-7943 7943 valerie_maguire@siemon.com valerie_maguire@siemon.com