tia tr tia tr 42 liaison to ieee 802 3 42 liaison to ieee
play

TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 - PowerPoint PPT Presentation

TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 Valerie Maguire Valerie Maguire Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR 42 Telecommunications


  1. TIA TR TIA TR- -42 Liaison to IEEE 802.3 42 Liaison to IEEE 802.3 Valerie Maguire Valerie Maguire Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR Vice Chair, TIA TR-42 Telecommunications Vice Chair, TIA TR 42 Telecommunications 42 Telecommunications Cabling Systems Engineering Committee Cabling Systems Engineering Committee Cabling Systems Engineering Committee Cabling Systems Engineering Committee Vice Chair, TIA TR Vice Chair, TIA TR-42.7 Copper Cabling 42.7 Copper Cabling Subcommittee Subcommittee November, November, 2011 2011 Atlanta, GA Atlanta, GA November 2011 IEEE 802.3 1

  2. Introduction to TIA Introduction to TIA • Telecommunications Industry Telecommunications Industry • Association Association • www.tiaonline.org www.tiaonline.org • TR • TR TR-42: Defines mechanical and TR-42: Defines mechanical and 42: Defines mechanical and 42: Defines mechanical and • • transmission requirements for copper transmission requirements for copper twisted-pair, optical fiber, and coaxial twisted pair, optical fiber, and coaxial cabling and components cabling and components November 2011 IEEE 802.3 2

  3. Agenda and Meeting Overview Agenda and Meeting Overview • October 3 October 3 – – 7 7 in in San Antonio, TX San Antonio, TX • • Review TR Review TR-42 sub 42 sub-committee activities committee activities • 11 11 sub sub-committees met committees met • Update on project development Update on project development • � � � � This symbol highlights key points This symbol highlights key points • of interest of interest November 2011 IEEE 802.3 3

  4. TR TR-42 Activities 42 Activities • TR TR-42.1 (Commercial Building Cabling): 42.1 (Commercial Building Cabling): • – ANSI/TIA ANSI/TIA-568 568-C.1 C.1-1, “ 1, “Commercial Building Commercial Building Telecommunications Cabling Standard, Telecommunications Cabling Standard, Addendum 1 Pathway and Spaces” Addendum 1 Pathway and Spaces ” approved for publication approved for publication – New New project: ANSI/TIA project: ANSI/TIA-942 942-A, A, “Telecommunications Infrastructure “Telecommunications Infrastructure Standard for Data Centers” circulating for Standard for Data Centers” circulating for default ballot default ballot November 2011 IEEE 802.3 4

  5. TR-42 Activities TR 42 Activities • TR TR-42.1 (Commercial Building Cabling 42.1 (Commercial Building Cabling), ), • cont.: cont.: � � � � – New New project: ANSI/TIA project: ANSI/TIA-568 568-C.0 C.0-2, “General 2, “General Updates” circulating for default ballot Updates” circulating for default ballot – New project: – New project: New project: ANSI/TIA New project: ANSI/TIA ANSI/TIA-TBD, ANSI/TIA-TBD, TBD, TBD, “Telecommunications Infrastructure for “Telecommunications Infrastructure for Educational Buildings and Spaces” under Educational Buildings and Spaces” under development development November 2011 IEEE 802.3 5

  6. TR TR-42 Activities 42 Activities • TR TR-42.2 (Residential Infrastructure): 42.2 (Residential Infrastructure): • – ANSI/TIA ANSI/TIA-570 570-C C, “Residential , “Residential Telecommunications Infrastructure” Telecommunications Infrastructure” approved for publication approved for publication • TR • TR TR-42.3 (Pathways and Spaces): TR-42.3 (Pathways and Spaces): 42.3 (Pathways and Spaces): 42.3 (Pathways and Spaces): • • – ANSI/TIA ANSI/TIA-569 569-C C,“Commercial Building ,“Commercial Building Standard for Telecommunications Standard for Telecommunications Pathways and Spaces” Pathways and Spaces” approved for approved for publication publication November 2011 IEEE 802.3 6

  7. TR TR-42 Activities 42 Activities • TR TR-42.5 (Terms and Symbols): 42.5 (Terms and Symbols): • – Definitions, acronyms, units of measure, Definitions, acronyms, units of measure, and symbols maintained in a working and symbols maintained in a working document document • TR • TR TR-42.6 (Infrastructure Administration): TR-42.6 (Infrastructure Administration): 42.6 (Infrastructure Administration): 42.6 (Infrastructure Administration): • • – New project: ANSI/TIA New project: ANSI/TIA-606 606-B, B, “Administration Standard for Commercial “Administration Standard for Commercial Telecommunications Infrastructure” Telecommunications Infrastructure” circulating for default circulating for default ballot ballot November 2011 IEEE 802.3 7

  8. TR TR-42 Activities 42 Activities • TR TR-42.7 (Copper Cabling): 42.7 (Copper Cabling): • – New project: TIA New project: TIA-1183, “Test Fixtures for 1183, “Test Fixtures for Balunless Measurements of Balanced Balunless Measurements of Balanced Components and Systems” circulating for Components and Systems” circulating for industry ballot industry ballot – New project: TSB New project: TSB-1197, “Mode Conversion 1197, “Mode Conversion Parameters for Balanced Twisted-Pair Parameters for Balanced Twisted Pair Cabling” under development Cabling” under development November 2011 IEEE 802.3 8

  9. TR-42 Activities TR 42 Activities • TR TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.: • � � � � – New project: ANSI/TIA New project: ANSI/TIA-568 568-C.2 C.2-1 1 “Balanced Twisted-Pair “Balanced Twisted Pair Telecommunications Cabling and Telecommunications Cabling and Components Standard, Addendum 1: Components Standard, Addendum 1: Specifications for 100 � Next Generation Specifications for 100 � Next Generation Specifications for 100 � Next Generation Specifications for 100 � Next Generation Cabling” under development Cabling” under development November 2011 IEEE 802.3 9

  10. TR TR-42 Activities 42 Activities • TR TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.: • � � � � – Four “100 � Next Generation Cabling” Four “100 � Next Generation Cabling” Task Groups established Task Groups established 1. Cable TG 1. Cable TG 2. Connector TG 2. 2. Connector TG 2. Connector TG Connector TG 3. Applications Space TG 3. Applications Space TG 4. Capacity Task TG 4. Capacity Task TG Contact the Chair of TR Contact the Chair of TR-42.7 42.7 (sterling.vaden@occfiber.com) for (sterling.vaden@occfiber.com) for participation information participation information November 2011 IEEE 802.3 10

  11. TR TR-42 Activities 42 Activities • TR TR-42.7 (Copper Cabling), cont.: 42.7 (Copper Cabling), cont.: • � � � � – “100 � “100 � Next Generation Cabling” Next Generation Cabling” Baseline Baseline Objectives Adopted Objectives Adopted November 2011 IEEE 802.3 11

  12. TR TR-42 Activities 42 Activities • TR TR-42.9 (Industrial Infrastructure): 42.9 (Industrial Infrastructure): • – ANSI/TIA ANSI/TIA-1005 1005-A A, “Telecommunications , “Telecommunications Infrastructure Standard for Industrial Infrastructure Standard for Industrial Premises” approved for publication Premises” approved for publication November 2011 IEEE 802.3 12

  13. TR TR-42 Activities 42 Activities • TR TR-42.11 (Optical Fiber Systems): 42.11 (Optical Fiber Systems): • � � � � – New project: ANSI/TIA New project: ANSI/TIA-568 568-C.0 C.0-2, “Generic 2, “Generic Telecommunications Cabling for Customer Telecommunications Cabling for Customer Premises Premises – Addendum 2, Addendum 2, General General Updates” circulating for default ballot Updates” circulating for default ballot – Encircled Encircled flux test flux test method method under under study study � � � � – BIMMF requirements under study BIMMF requirements under study – 24 24-fiber cabling requirements under study fiber cabling requirements under study – Dispersion compensating MMF under Dispersion compensating MMF under study study November 2011 IEEE 802.3 13

  14. TR-42 Activities TR 42 Activities • TR TR-42.12 (Optical Fibers and Cables): 42.12 (Optical Fibers and Cables): • – New project: TIA New project: TIA-455 455-7/FOTP 7/FOTP-7, 7, “Numerical Aperture” circulating for “Numerical Aperture” circulating for committee ballot committee ballot – New project: TIA New project: TIA-455 455-28/FOTP 28/FOTP-28, 28, “Dynamic Tension” circulating for “Dynamic Tension” circulating for “Dynamic Tension” circulating for “Dynamic Tension” circulating for committee ballot committee ballot – New project: TIA New project: TIA-455 455-80/FOTP 80/FOTP-80, “Patch 80, “Patch Cord Wavelength” under Cord Wavelength” under development development November 2011 IEEE 802.3 14

  15. TR TR-42 Activities 42 Activities • TR TR-42.12 (Optical Fibers and Cables 42.12 (Optical Fibers and Cables), ), • cont.: cont.: – New project: TIA New project: TIA-455 455-244/FOTP 244/FOTP-244, 244, “Expressed Tube Cycling” under “Expressed Tube Cycling” under development development November 2011 IEEE 802.3 15

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.