The 5G Infrastructure Association
02/12/2018 1
- Dr. Didier Bourse
The 5G Infrastructure Association 5G Infrastructure PPP 5G - - PowerPoint PPT Presentation
The 5G Infrastructure Association 5G Infrastructure PPP 5G PanEuropean Trials Roadmap Dr. Didier Bourse Global 5G Event (G5GE) 2830.11.18 Rio 5G IEEE Summit 30.11.18 Rio 02/12/2018 1 5G Infrastructure PPP PPP Phase 1 /
02/12/2018 1
02/12/2018 2
EC DG CNECT ‐ Peter Stuckmann – 5th Global 5G Event (G5GE) – 16‐17.05.18 – Austin
ICT‐17 3 Projects 60 ME
Starting on 01.07.18
ICT‐18 3 Projects 50 ME
Starting on 01.11.18
ICT‐19 6‐9 Projects 90 ME
Proposals DL on 14.11.18
ICT‐20 14‐21 Projects 85 ME (TBC)
Proposals DL in March 2019 and in 2020
21 Projects 150 ME
Started on 01.06.17
19 Projects 130 ME
Ending on 30.06.18
+ additional Strategic Objectives in EC WP2020
02/12/2018 3
https://5g‐ppp.eu/
02/12/2018 4
https://5g-ppp.eu/phase-3-pre-structuring-model/
5G‐DRIVE PriMO‐5G 5G ALL‐STAR ThoR 5G‐Enhance 5G‐EVE, 5G‐VINNI and 5GENESIS 5G‐CARMEN, 5GCroCo and 5G‐MOBIX
EMPOWER Note: EC WP2020 data to be confirmed in 4Q18
6‐9 projects to be selected – Starting (a priori) on 01.06.19 EC ICT 2018 to be organized on 04‐06.12.18 in Vienna
(https://ec.europa.eu/digital‐single‐market/en/news/attend‐ict‐2018)
02/12/2018 5
https://5g‐ppp.eu/
02/12/2018 6
https://5g‐ppp.eu/newsflash‐august‐2017/ and https://5g‐ppp.eu/phase‐1‐key‐achievements/
02/12/2018 7
https://5g‐ppp.eu/wp‐content/uploads/2016/02/BROCHURE_5PPP_BAT2_PL.pdf
02/12/2018 8
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 9
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 10
and provisioning
https://5g‐ppp.eu/
commercial launch of 5G services in at least one major city in all MSs in 2020 and (3) the uninterrupted coverage in all urban areas and along main transport paths in 2025 clearly on the right tracks
deployment to already start in specific EU cities in 2019
in 5G pre‐commercial/commercial trials and pilots, engaged in 5G R&I trials and pilots and also making available 5G R&I platforms. Description of the major EU cities engaged in the 5G UEFA EURO 2020 Flagship event also included
Platforms and Corridors projects and starting soon Phase 3 Vertical Pilots projects
02/12/2018 11
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 12
https://5g‐ppp.eu/5g‐trials‐roadmap/
EC 5G Observatory
(https://ec.europa.eu/digital‐ single‐market/en/european‐ 5g‐observatory)
02/12/2018 13
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 14
https://5g‐ppp.eu/5g‐trials‐roadmap/ and http://5gobservatory.eu/5g‐trial/major‐european‐5g‐trials‐and‐pilots/ 2 4 6 8 10 12 14 16 18 Austria Belgium Bulgaria Croatia Denmark Estonia Finland France Germany Greece Hungary Ireland Italy Latvia Lithuania Netherlands Norway Poland Portugal Romania Spain Sweden Switzerland UK
EU 5G Trials & Pilots
02/12/2018 15
http://5gobservatory.eu/
(https://ec.europa.eu/digital‐single‐ market/en/european‐5g‐observatory)
launched on 27.09.18
(http://5gobservatory.eu/) in the context of
the 5G Techritory event organized on 27‐28.09.18 in Riga
(https://www.5gtechritory.com/)
(http://5gobservatory.eu/PDF/80082‐5G‐ Observatory‐Quarterly‐report_1.pdf). 2nd
quarterly report to be published beg. of January 2019
02/12/2018 16
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 17
https://www.global5g.org/cartography
02/12/2018 18
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 19
https://5g‐ppp.eu/5g‐trials‐roadmap/
Platforms Capabilities 5G‐EVE 5G‐VINNI 5GENESIS Rel15‐5GNR in Non Standalone Alone (NSA) mode Turin, Madrid, Paris, Athens January 2020 Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro Athens, Berlin, Limassol, Malaga, Surrey Rel15‐5GNR with Rel15‐5GCore in Standalone Alone (SA) mode(4) Turin, Madrid, Paris, Athens June 2021 Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro. After Jan2020 Athens, Malaga, Berlin, Surrey Rel16‐5GNR and 5GCore (NSA or SA)(4) Turin, Madrid, Paris, Athens June 2021 Oslo, Kongsberg, Martlesham, Madrid, Patras After Jan2020 Surrey Network Slicing as a service(3) ‐ Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro Athens, Malaga, Surrey Customized network slice (e.g. SFC, security, enhanced Cloud access) (3) Turin, Madrid, Paris, Athens June 2021 Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro Athens, Berlin, Limassol, Malaga, Surrey Hosting of 3rd party VNFs(3) Turin, Madrid, Paris, Athens. January 2020 Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro Athens, Berlin, Limassol, Malaga, Surrey Interworking(2) with
ICT17 facilities(3) Turin, Madrid, Paris, Athens June 2021 Oslo, Kongsberg, Martlesham, Patras, Madrid Athens, Malaga, Surrey Integration of additional gNB to ICT‐17 facility(3) Turin, Madrid, Paris, Athens January 2020 Oslo, Kongsberg, Martlesham, Patras, Madrid, Aveiro After Jan2020 Athens, Berlin, Limassol, Malaga, Surrey Edge Computing Turin, Madrid, Paris, Athens January 2020 Madrid, Aveiro, Oslo, Kongsberg, Patras, Martlesham (TBD). After Jan2020 Athens, Malaga, Surrey Distributed Data fabric service for analytics ‐ Oslo, Kongsberg, Patras (TBD), Madrid. After Jan2020 Athens 3.5 GHz 5G Radio Turin, Madrid, Paris, Athens January 2020 Oslo, Kongsberg, Martlesham, Patras, Madrid, Munich, Aveiro Athens, Malaga, Surrey 26 GHz 5G Radio ‐ Oslo, Kongsberg, Martlesham Surrey Millimeter wave for Backhaul ‐ Patras Surrey End UserTesting Turin, Madrid, Paris, Athens January 2020 Oslo, Kongsberg, Martlesham, Patras, Madrid Athens, Berlin, Limassol, Malaga, Surrey Automatic testing framework Turin, Madrid, Paris, Athens Oslo, Kongsberg, Martlesham, Patras, Madrid Athens, Malaga, Surrey
02/12/2018 20
https://www.ip45g.de/en/5g‐testbeds/
02/12/2018 21
https://5g‐ppp.eu/5g‐trials‐roadmap/
02/12/2018 22
https://5g‐ppp.eu/ and https://www.eucnc.eu/announcement‐eucnc‐2019/
02/12/2018 23