TENDER BRIEFING MEETING 14 MAY 2019 AT 10H00 265 WEST AVENUE, - - PowerPoint PPT Presentation

tender briefing meeting 14 may 2019 at 10h00 265 west
SMART_READER_LITE
LIVE PREVIEW

TENDER BRIEFING MEETING 14 MAY 2019 AT 10H00 265 WEST AVENUE, - - PowerPoint PPT Presentation

TENDER BRIEFING MEETING 14 MAY 2019 AT 10H00 265 WEST AVENUE, CENTURION 1. Opening, welcome and introduction M Sibanyoni 2. Scope of services M Chesalokile 3. Key deliverables M


slide-1
SLIDE 1
slide-2
SLIDE 2

TENDER BRIEFING MEETING 14 MAY 2019 AT 10H00 265 WEST AVENUE, CENTURION

slide-3
SLIDE 3
  • 1. Opening, welcome and introduction

M Sibanyoni

  • 2. Scope of services

M Chesalokile

  • 3. Key deliverables M Chesalokile
  • 4. Tendering process

M Sibanyoni

  • 5. Submission of tender

M Sibanyoni

  • 6. Communication

M Sibanyoni

  • 7. Question & Answers

All

  • 8. Closure

M Sibanyoni

slide-4
SLIDE 4

 Opening, welcome and introduction  Signing of attendance register

slide-5
SLIDE 5

Assess the functional specification as documented in the Request for Tender (RFT) documents against business requirements, to determine its accuracy, completeness, unambiguity and alignment

  • thereof. .

Assess the detailed functional design as documented in the Detailed Functional Design (blueprint) document against the RFT documents, to determine alignment between the two, as well as alignment with business requirements.

Conduct a comprehensive technical review of the Oracle EBS system as currently implemented and configured, and assess its level

  • f

compliance with / responsiveness to the functional specification.

slide-6
SLIDE 6

Comprehensively review the configuration of the General Ledger and advice TCTA on whether or not it is aligned to best practice for project accounting environments, and more importantly advice

  • n what is the most appropriate manner to structure it for TCTA.

Review the implementation methodology followed during the implementation phase, against Oracle’s implementation methodology, to determine any gaps.

Provide advice with respect to TCTA’s readiness for an ERP system – simply put, advice whether or not an ERP system is the most suitable solution for the TCTA business environment as

  • pposed to the best-of-breed approach.
slide-7
SLIDE 7

Advice TCTA on the way forward – presenting various

  • ptions, determining timelines and estimated costs for each
  • ption, and recommending one of the presented options.

The 18 weeks timeline is indicative and will be confirmed with the successful tenderer.

slide-8
SLIDE 8

Interim report and presentation – highlighting gaps between business requirements and RFT; giving an opinion on the clarity

  • f the functional specification.

Interim report and presentation – highlighting gaps between RFT and Detailed Functional Design.

Interim report and presentation – highlighting gaps between RFT and system; listing all system errors/bugs and possible resolutions.

Interim report and presentation – report with available options.

slide-9
SLIDE 9

Interim report and presentation – highlighting discrepancies and gaps in the implementation methodology.

Interim report and presentation – determining the outcome and reasons thereof.

Final report and presentation to EXCO/Board

slide-10
SLIDE 10
slide-11
SLIDE 11

 Tenderers, third party contractors or resources that

participated in the implementation of the Oracle EBS system at TCTA are excluded from participating in this tender/project.

slide-12
SLIDE 12

 Tenderers must submit their proof of registration on the

National Treasury’s Central Supplier Database

 Tenderers must submit their Tax Compliance Pin issued by

the SARS.

slide-13
SLIDE 13

(a) Failure to meet a minimum of two (2) successful projects in

providing Advisory Services or Implementation of Oracle EBS.

(b) Failure to demonstrate a minimum of three (3) Oracle projects

implemented for at least one of the proposed resources.

(c) Failure to demonstrate a minimum of two (2) previous ERP

projects managed by the project manager.

(d) Failure to demonstrate a minimum two (2) engagements on the

development of ERP specification and detailed design documents by the proposed resource.

(e) Failure to meet a minimum of 15 points out of 30 points on

transformation evaluation;

(f) Failure to meet a minimum of 25 points out of 50 points on

technical evaluation;

(g) Failure, by a representative of the tendering entity to attend the

compulsory briefing session;

slide-14
SLIDE 14

(h) Failure to submit the tender before the closing date and

time; and

(i) Tenders submitted via emails and faxes.

slide-15
SLIDE 15

 Tenderers must submit the full list of documents and

information required by TCTA for the purpose of evaluation of the tender offer.

 The documentation and information required must be

numbered in accordance with the numbering set out in this RFT.

 Envelope A must contain all requested information for

technical and transformation.

 Envelope B must contain all requested information for

financial proposal.

slide-16
SLIDE 16

Stage 1-Transformation and Technical

 Determination of Transformation and Technical score on the

basis of submitted tender and disqualification of tenderer not achieving the stated minimum scores. Stage 2-Price and Preference Procurement

 Points will be allocated on the basis of the 80:20 scoring

methodology in accordance with preferential procurement regulations to determine the final score.

slide-17
SLIDE 17

Transformation evaluation criteria

 Black ownership or participation of black owned enterprise  Employment of black personnel.

Technical evaluation criteria

Company experience : Oracle Implementation Experience

Proposed key personnel experience :

 Project Management Consulting Experience  Oracle consultant experience  Specification and/or Detailed Design Consultant Experience

slide-18
SLIDE 18

 Closing date and time for submissions: 5 June 2019 at

11:00.

 Delivery Address: TCTA offices, Ground Floor Stinkhout

Wing, Tuinhof Building, 265 West Street, Centurion

 Delivery method :

Proposals must be hand delivered at TCTA’s Centurion offices and addressed to the Receiving Officer, and marked RFT: TCTA/IT/AOR/2019/20on

  • r

before the closing date and time.

 ENVELOPE A-Transformation and Technical Proposal

 Originals of the Technical Proposal: 1  Copies of the Technical Proposal: 4

 ENVELOPE B- Financial Proposal

 Originals of the Technical Proposal: 1  Copies of the Technical Proposal: 1

slide-19
SLIDE 19

 Only written communication addressed to Receiving Officer at

tenders04@tcta.co.za will be considered.

 TCTA will assume that every individual communicating with it on

behalf of a tenderer or a potential tenderer is duly authorized unless otherwise indicated.

 Please use tender number on all correspondence.  Written

questions emailed to tenders04@tcta.co.za will be responded to within 48 hours.

 Questions will be answered only up to 3 days before the tender

closing date

 Any addendum to the RFT necessary will be issued until 3 days

before the tender closing date.

slide-20
SLIDE 20
slide-21
SLIDE 21