TENDER BRIEFING MEETING 14 MAY 2019 AT 10H00 265 WEST AVENUE, CENTURION 1. Opening, welcome and introduction M Sibanyoni 2. Scope of services M Chesalokile 3. Key deliverables M
SLIDE 2
SLIDE 3
- 1. Opening, welcome and introduction
M Sibanyoni
- 2. Scope of services
M Chesalokile
- 3. Key deliverables M Chesalokile
- 4. Tendering process
M Sibanyoni
- 5. Submission of tender
M Sibanyoni
- 6. Communication
M Sibanyoni
- 7. Question & Answers
All
- 8. Closure
M Sibanyoni
SLIDE 4
Opening, welcome and introduction Signing of attendance register
SLIDE 5
Assess the functional specification as documented in the Request for Tender (RFT) documents against business requirements, to determine its accuracy, completeness, unambiguity and alignment
- thereof. .
Assess the detailed functional design as documented in the Detailed Functional Design (blueprint) document against the RFT documents, to determine alignment between the two, as well as alignment with business requirements.
Conduct a comprehensive technical review of the Oracle EBS system as currently implemented and configured, and assess its level
- f
compliance with / responsiveness to the functional specification.
SLIDE 6
Comprehensively review the configuration of the General Ledger and advice TCTA on whether or not it is aligned to best practice for project accounting environments, and more importantly advice
- n what is the most appropriate manner to structure it for TCTA.
Review the implementation methodology followed during the implementation phase, against Oracle’s implementation methodology, to determine any gaps.
Provide advice with respect to TCTA’s readiness for an ERP system – simply put, advice whether or not an ERP system is the most suitable solution for the TCTA business environment as
- pposed to the best-of-breed approach.
SLIDE 7
Advice TCTA on the way forward – presenting various
- ptions, determining timelines and estimated costs for each
- ption, and recommending one of the presented options.
The 18 weeks timeline is indicative and will be confirmed with the successful tenderer.
SLIDE 8
Interim report and presentation – highlighting gaps between business requirements and RFT; giving an opinion on the clarity
- f the functional specification.
Interim report and presentation – highlighting gaps between RFT and Detailed Functional Design.
Interim report and presentation – highlighting gaps between RFT and system; listing all system errors/bugs and possible resolutions.
Interim report and presentation – report with available options.
SLIDE 9
Interim report and presentation – highlighting discrepancies and gaps in the implementation methodology.
Interim report and presentation – determining the outcome and reasons thereof.
Final report and presentation to EXCO/Board
SLIDE 10
SLIDE 11
Tenderers, third party contractors or resources that
participated in the implementation of the Oracle EBS system at TCTA are excluded from participating in this tender/project.
SLIDE 12
Tenderers must submit their proof of registration on the
National Treasury’s Central Supplier Database
Tenderers must submit their Tax Compliance Pin issued by
the SARS.
SLIDE 13
(a) Failure to meet a minimum of two (2) successful projects in
providing Advisory Services or Implementation of Oracle EBS.
(b) Failure to demonstrate a minimum of three (3) Oracle projects
implemented for at least one of the proposed resources.
(c) Failure to demonstrate a minimum of two (2) previous ERP
projects managed by the project manager.
(d) Failure to demonstrate a minimum two (2) engagements on the
development of ERP specification and detailed design documents by the proposed resource.
(e) Failure to meet a minimum of 15 points out of 30 points on
transformation evaluation;
(f) Failure to meet a minimum of 25 points out of 50 points on
technical evaluation;
(g) Failure, by a representative of the tendering entity to attend the
compulsory briefing session;
SLIDE 14
(h) Failure to submit the tender before the closing date and
time; and
(i) Tenders submitted via emails and faxes.
SLIDE 15
Tenderers must submit the full list of documents and
information required by TCTA for the purpose of evaluation of the tender offer.
The documentation and information required must be
numbered in accordance with the numbering set out in this RFT.
Envelope A must contain all requested information for
technical and transformation.
Envelope B must contain all requested information for
financial proposal.
SLIDE 16
Stage 1-Transformation and Technical
Determination of Transformation and Technical score on the
basis of submitted tender and disqualification of tenderer not achieving the stated minimum scores. Stage 2-Price and Preference Procurement
Points will be allocated on the basis of the 80:20 scoring
methodology in accordance with preferential procurement regulations to determine the final score.
SLIDE 17
Transformation evaluation criteria
Black ownership or participation of black owned enterprise Employment of black personnel.
Technical evaluation criteria
Company experience : Oracle Implementation Experience
Proposed key personnel experience :
Project Management Consulting Experience Oracle consultant experience Specification and/or Detailed Design Consultant Experience
SLIDE 18
Closing date and time for submissions: 5 June 2019 at
11:00.
Delivery Address: TCTA offices, Ground Floor Stinkhout
Wing, Tuinhof Building, 265 West Street, Centurion
Delivery method :
Proposals must be hand delivered at TCTA’s Centurion offices and addressed to the Receiving Officer, and marked RFT: TCTA/IT/AOR/2019/20on
- r
before the closing date and time.
ENVELOPE A-Transformation and Technical Proposal
Originals of the Technical Proposal: 1 Copies of the Technical Proposal: 4
ENVELOPE B- Financial Proposal
Originals of the Technical Proposal: 1 Copies of the Technical Proposal: 1
SLIDE 19
Only written communication addressed to Receiving Officer at
tenders04@tcta.co.za will be considered.
TCTA will assume that every individual communicating with it on
behalf of a tenderer or a potential tenderer is duly authorized unless otherwise indicated.
Please use tender number on all correspondence. Written
questions emailed to tenders04@tcta.co.za will be responded to within 48 hours.
Questions will be answered only up to 3 days before the tender
closing date
Any addendum to the RFT necessary will be issued until 3 days
before the tender closing date.