Study Name

(Report cover for title and slide background)

Transportation Planning Council May 5, 2010

slide-2
SLIDE 2

Turbo Lanes

  • Signalized T-Intersection
  • Special Traffic Lanes Configuration
  • Special Signal Operation
  • One (or More) Lanes on Main Street

Flow Continuously

  • Actuated Pedestrian Signals When

Needed

slide-3
SLIDE 3

Suitability Factors

  • Nearby Driveways/Streets
  • Proximity of Other Signals
  • Dual Left Turns
  • Number of Lanes on Main Street
  • Median
slide-4
SLIDE 4

Concept Design Parameters

slide-5
SLIDE 5

Location Screening

slide-6
SLIDE 6

Study Coordination

  • MD Public Works Department
  • Meeting: August 26, 2009
  • Prelim. Recommendations Report (8/09)
  • Draft Final Report Review (3/10)
  • Transp. Planning Tech. Advisory Committee (4/7/10)
  • Citizens Transportation Advisory Committee (4/28/10)
slide-7
SLIDE 7

Recommended Turbo Lanes 25 Locations Map

slide-8
SLIDE 8

Location Information/Specifications

slide-9
SLIDE 9

Schematic Plan

slide-10
SLIDE 10

Location 2 - Perspective

slide-11
SLIDE 11

Location 18 - Perspective

slide-12
SLIDE 12

Benefits

Increase in intersection approach capacity ranging from 7 to 173% at 25 intersections

slide-13
SLIDE 13

Lane Type Cost Matrix

slide-14
SLIDE 14

Priority Evaluation

  • Capacity Improvement
  • Cost
  • Implementation Issues
slide-15
SLIDE 15

Implementation

  • Short Term: 6 – 12 Months
  • Mid Term: 1 – 2 Years
  • Long Term: 3 Years +